Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20044D038 + (Proposed TS 3.7-1 Reducing Maximum Allowable Linear Power level-high Trip Setpoints Associated W/Inoperable Steam Line Safety Valves)
- ML20113H452 + (Proposed TS 3.7-2 & 4.6-2 Re Auxiliary Electrical Sys & Cooling Water Sys,Respectively)
- ML17262B044 + (Proposed TS 3.7.1 Re Auxiliary Electrical Sys)
- ML20034H748 + (Proposed TS 3.7.1.2 Re Operability Requirements for SG AFW Pumps & Associated Flow Paths)
- ML20117D314 + (Proposed TS 3.7.1.3 Re Condensate Storage Tank)
- ML20035H407 + (Proposed TS 3.7.1.3, UHS Changing Max Allowable Value of Average River Temp from 90.5 F to 88.6 F)
- ML20113H621 + (Proposed TS 3.7.1.6 Re Main Feedwater Isolation Sys)
- ML20118B940 + (Proposed TS 3.7.5 Re Operability of Cooling Tower Cell & Increasing TS Temp Limit for Cooling Tower Vasin Water)
- ML20098C074 + (Proposed TS 3.7.6.1,extending Action Statements a & B from 7 Days to 30 Days for Loss of Emergency Power)
- ML17329A380 + (Proposed TS 3.7.9.1 Re Operability of Fire Suppression Water Sys)
- B14396, Proposed TS 3.7.A.2 Re Drywell to Suppression Chamber Differential Pressure + (Proposed TS 3.7.A.2 Re Drywell to Suppression Chamber Differential Pressure)
- ML20045E728 + (Proposed TS 3.7.A.4 & 3.6.4.1 for Units 1 & 2,respectively, Allowing One or More Suppression chamber-drywell Vacuum Breakers to Open During Surveillance Testing)
- ML20077F074 + (Proposed TS 3.7.B,Pages 152,153 & 154 Re Standby Gas Treatment Power Supply Requirements During Refueling Operations)
- ML20080H689 + (Proposed TS 3.7.B.1.b & Bases Section 3.7,replacing Term Auxiliary Electrical Power Source W/Term Alternate Electrical Power Source)
- ML20063D784 + (Proposed TS 3.8,adopting LCO of Section 3/4.7.6, Sealed Source Contamination)
- ML20084Q578 + (Proposed TS 3.8.1.1 - Ac Power Sources,Operating,Increasing Allowed Outage Time Period for One EDG Being Inoperable from 72 H to 7 Days)
- ML20093M461 + (Proposed TS 3.8.1.1,replacing Words Except That for Cycle 13 Only W/During Millstone Unit 1 Refueling Outage 15 & Adding Footnote to TS Bases Section on Page B 3/4 8-1)
- ML17290A191 + (Proposed TS 3.8.1.1.b.2 & 3.8.1.2.b Re DG Fuel Storage Sys Capacity)
- ML18096A898 + (Proposed TS 3.8.2.1 Re Ac Distribution - Operating & 3.8.2.2 Re Ac Distribution - Shutdown)
- ML20035C179 + (Proposed TS 3.8.2.1, AC Distribution - Operating)
- ML20101B080 + (Proposed TS 3.8.2.5 Re Containment Penetration Conductor Overcurrent Protective Devices)
- ML20104A869 + (Proposed TS 3.9 & 4.9 Re Auxiliary Electrical Sys)
- ML20090E346 + (Proposed TS 3.9-1 & 3.9-4a Re Emergency Diesel Generators)
- ML20045F008 + (Proposed TS 3.9.12, Fuel Handling Bldg/Auxiliary Bldg Air Cleanup Sys)
- ML20126K985 + (Proposed TS 3.9.3 Re Control Rod Position,Stating That Spec Applicable Only During Loading of Fuel Assemblies Into Reactor Core)
- ML17332A413 + (Proposed TS 3.9.3 Re Refueling Operations Decay Time)
- ML20081J503 + (Proposed TS 3.9.4 Re Containment Airlock Doors to Be Open During Fuel Movement)
- ML20094P075 + (Proposed TS 3.9.4, Containment Bldg Penetrations & Bases Section,Allowing Containment Personnel Airlock Doors to Be Opened During Core Alterations & Movement of Irradiated Fuel in Containment & TS 4.9.4)
- ML20217D518 + (Proposed TS 3.9.8.1,3.9.8.2,TS Action 3.9.8.2a,3.8.1.2 & Bases 3/4.9.8)
- ML20102B248 + (Proposed TS 3.9.C & 4.9.C Re out-of-svc Times for Emergency Svc Water Sys)
- ML20072H057 + (Proposed TS 3.9.C,allowing Shutdown Operations W/Only One of Two Required EDGs Aligned to Corresponding Core or Containment Cooling Sys)
- ML18036A890 + (Proposed TS 3.9/4.9-19 & 3.9/4.9-20 Re DG Auxiliary Boards & Nonsafety Parts of 250-volt Dc Battery Sys & Nonsafety Related Unit Preferred & Plant Preferred Motor Generator Sets)
- ML17290A187 + (Proposed TS 3/4 0-3 Re Performance of ISI & Testing Activities,Per GL 88-01)
- ML20044G758 + (Proposed TS 3/4 4-12 Re Plugging of Repair Limit & TS 3/4 4-17 Re Limiting RCS primary-to-secondary Leakage Through All SGs)
- ML20087A118 + (Proposed TS 3/4 5-1 Re Verification That Each Safety Injection Tank Isolation Valve Open Will Not Be Required Due to Valve Being Mechanically Secured in Open Position)
- ML20149G130 + (Proposed TS 3/4 5-6 Re Charging Pump Runout Flow Limit)
- ML20035D367 + (Proposed TS 3/4 6-1 Re SR for Primary Containment Integrity & 3.6.1.2 Re LCO for Containment Leakage Rates)
- ML20095L012 + (Proposed TS 3/4 6-11 Re Surveillance Requirements for Containment sys,3/4 6-12 Re Limiting Condition for Operation for Containment Cooling Sys & 3/4 6-15 Re Surveillance Requirements for Containment Sys)
- ML20079A699 + (Proposed TS 3/4 6-2 Re Surveillance Requirements for Type a Tests Intervals)
- B14291, Proposed TS 3/4 6-3.d Increasing Type B & C Surveillance Testing Intervals from 24 Months to 34 Months for Cycle 4 Only + (Proposed TS 3/4 6-3.d Increasing Type B & C Surveillance Testing Intervals from 24 Months to 34 Months for Cycle 4 Only)
- ML20036C499 + (Proposed TS 3/4 8-11 Re Surveillance Interval for Battery Terminals & TS 3/4 8-2 Re Periodic Testing of DG Units Used as Onsite Electric Power Sys)
- ML20118C006 + (Proposed TS 3/4 8-4 Re Sampling New EDG Fuel Oil Prior to Addition to Storage Tanks)
- ML20044F960 + (Proposed TS 3/4 8-6 Re Surveillance Interval for EDGs)
- ML17348A765 + (Proposed TS 3/4.1 Re Boric Acid Concentration Reduction)
- ML18096A742 + (Proposed TS 3/4.1.1 Re Boration Control Shutdown Margin, Table 3.3-4 Re ESFAS Instrumentation Trip Setpoints & Table 3.3-5 Re ESF Response Times)
- A14108, Proposed TS 3/4.1.1,3/4.1.2 & 3/4.1.3 Re Reactivity Control Sys,Boration Sys & Movable Control Assemblies,Respectively + (Proposed TS 3/4.1.1,3/4.1.2 & 3/4.1.3 Re Reactivity Control Sys,Boration Sys & Movable Control Assemblies,Respectively)
- ML20065G147 + (Proposed TS 3/4.1.1.1 Re Applicable Bases for Reactivity Control Sys & Emergency Core Cooling Sys)
- ML20098C411 + (Proposed TS 3/4.1.2.8 Re Reactivity Control Sys - Borated Water Sources - Shutdown TS 3/4.1.2.8 Re Reactivity Control Sys - Operating & TS 3/4.5.1 Re ECCS - Core Flooding Tanks)
- ML20035F967 + (Proposed TS 3/4.1.3 Increasing Surveillance Intervals for Control Rod Operability from Once Per 7 Days to Once Per 31 Days)
- ML20094F424 + (Proposed TS 3/4.1.3 Re Movable Control Assemblies)
- ML20096C232 + (Proposed TS 3/4.1.3.1 Re Group Height - Safety & Regulating Rod Groups & TS 3/4.1.3.3 Re Position Indicator Channels)