MONTHYEARML20211K6241999-08-31031 August 1999 Proposed Tech Specs,Changing ISFSI License Conditions 6,7 & 8 & TS 3/4.1 by Permitting Inclusion of Bpras & Thimble Plug Devices in Sf Assemblies Stored in TN-40 Casks ML20206R0621999-05-13013 May 1999 Proposed Tech Specs,Removing Plant Organization Structure Requirement ML20205S3331999-04-20020 April 1999 Proposed Tech Specs Changing Implementation Date for Relocation from TS to UFSAR of Requirements in TS 3.1.E & Flooding Shutdown Requirements in TS 5.1 ML20205Q0351999-04-12012 April 1999 Proposed Tech Specs,Relocating Shutdown Margin Requirements from TS to COLR ML20204H3601999-03-19019 March 1999 Proposed Tech Specs Removing Dates of Two NRC SERs & Correcting Dates of One SER Listed in Section 2.C.4, Fire Protection ML20207F2901999-03-0101 March 1999 Proposed Revised Tech Specs Incorporating Combustion Engineering SG Welded Tube Sleeve TR Rev ML20203A2181999-02-0505 February 1999 Proposed Tech Specs,Changing TS 4.12, SG Tube Surveillance to Incorporate Changes to Abb C-E Sleeve Design Assumptions & Installation Techniques ML20196B9721998-11-25025 November 1998 Proposed Tech Specs,Allowing Limited Inoperability of Bast Level Channels & Transfer Logic Channels to Provide for Required Testing & Maint of Associated Components ML20155G6321998-11-0303 November 1998 Proposed Tech Specs B.3.1-7 & B.3.1-7a,rev 133A Re Reactor Coolant Sys ML20154S2101998-10-23023 October 1998 Proposed Tech Specs Clarifying Conditions That Constitute Operable Irpi Sys Channels ML20151U3651998-09-0404 September 1998 Proposed Tech Specs TS.3.1-5,TS.4.18-1 & B.4.18-1,clarifying SRs & LCOs for Operability for Reactor Coolant Vent Sys ML20237B5061998-08-12012 August 1998 Proposed Tech Specs Re Conformance of Administrative Controls Section 6 to Guidance of Std Tech Specs ML20236T6041998-07-20020 July 1998 Proposed Tech Specs Incorporating Elevated F* SG Tube Repair Criteria ML20249A7641998-06-11011 June 1998 Proposed Tech Specs Re Conformance of Administrative Controls Section 6 to Guidance of Std ML20216G0371998-04-13013 April 1998 Proposed Tech Specs 3.3 Re Engineered Safety Features ML20216D0591998-03-0606 March 1998 Proposed Tech Specs Updating Heatup & Cooldown Rate Curves, Incorporating Use of Pressure & Temp Limits Rept & Changing Pressurizer PORVs Operability Temp ML20217P0061998-03-0404 March 1998 Proposed Tech Specs Re Status of Relocated Requirements ML20217N9771998-03-0202 March 1998 Proposed Tech Specs 3.8.D Re Spent Fuel Pool Special Ventilation Sys ML20217P1431998-03-0202 March 1998 Proposed Tech Specs Re Conformance of Administrative Controls Section 6 to Guidance of Std ML20202E5691998-02-10010 February 1998 Proposed Tech Specs 1-1 Re One Time Reduction of Mode 6 Reactor Coolant Sys Boron Concentration ML20198N8301998-01-15015 January 1998 Proposed Tech Specs Pages Allowing Use of Moveable Incore Detector Thimble Reduction for Unit 1,cycle 19 ML20198P0791998-01-0808 January 1998 Proposed Tech Specs Pages Re Suppl 5 to 951214 LAR on Conformance of Administrative Controls Section 6 to Guidance of STS ML20198B1471997-12-29029 December 1997 Proposed TS marked-up & Revised Pages,Incorporating Changes Associated w/951214 LAR ML20212F0471997-10-28028 October 1997 Proposed Tech Specs Pages Revising TS Section 4.12,allowing Use of voltage-based SG Tube Repair Criteria ML20217F4761997-10-0303 October 1997 Suppl Proposed Tss,Allowing Use of New SG Tube Sleeve Designs & Installation & Exam Techniques ML20211H7581997-10-0101 October 1997 Proposed Tech Specs Re Physical Mods to Turbine Bldg Cooling Water Header Isolation Logic ML20217C5861997-09-26026 September 1997 Proposed Tech Specs Changes to TS 3.4.B to Change Minimum Conditions for AFW & Permit Startup Operations to Continue W/Inoperable Turbine Driven AFW Pump or Associated Sys Valves Due to Inability to Complete IST Requirements ML20216E4561997-09-0404 September 1997 Proposed Tech Specs,Supporting Conformance to TS Overtime Controls to NRC Guidance Issued 950409 ML20216D1141997-09-0202 September 1997 Proposed Tech Specs,Incorporating Use of New SG Tube Sleeve Designs & Installation & Exam Techniques ML20217M6191997-08-15015 August 1997 Proposed Tech Specs Incorporating C-E SG Welded Sleeve TR, CEN-629-P,Rev 1 ML20149J0251997-06-30030 June 1997 Tech Spec Change Pages B.3.8-2 & B.3.8-5 to Amend Re Spent Fuel Pool Personnel Access Doors ML20141F5011997-05-15015 May 1997 Proposed Tech Specs 3.1.C, Reactor Coolant Sys Leakage & 4.12, SG Tube Surveillance ML20141A0871997-05-0707 May 1997 Proposed Tech Specs Re Spent Fuel Pool Special Ventilation Sys ML20137T2081997-04-10010 April 1997 Proposed Tech Specs,Clarifying Amend Request Re Conformance of Administrative Controls Section 6 to Guidance of STS ML20135F7481997-03-0707 March 1997 Proposed Tech Specs Re Cooling Water Sys Emergency Intake Design Basis ML20135A9401997-02-21021 February 1997 Proposed Tech Specs,Allowing Use of Credit for Soluble Boron in Spent Fuel Pool Criticality Analyses ML20134L8901997-02-12012 February 1997 Proposed Tech Specs 3.3-3 Re Safety Injection Pump Low Temp Operations ML20134J6281997-02-0606 February 1997 Proposed Tech Specs 3.3 Re Engineered Safety Features ML20134E9421997-01-29029 January 1997 Proposed Tech Specs Revising Prairie Island Design Bases Re Cooling Water Emergency Intake ML20135A8251996-11-27027 November 1996 Proposed Tech Specs Incorporating New SG Tube Sleeve Designs & Installation & Exam Techniques ML20135A5091996-11-25025 November 1996 Proposed Tech Specs Implementing Mods Proposed by Suppl to License Amend Request & Revising TS Pp in Final Form to Reflect Changes Proposed by Suppl ML20134H3771996-11-0606 November 1996 Proposed Tech Specs of Appendix a Re Cooling Water Sys ML20134E4551996-10-25025 October 1996 Proposed Tech Specs Changing TS 4.4.A, Containment Leakage Tests, Bases to TS Section B.4.4, Containment Sys Tests & Adding TS.6.5.J, Containment Leakage Rate Testing Program ML20129E2591996-09-24024 September 1996 Proposed Tech Specs,Changing TS 4.12 to Incorporate Revised Acceptance Criteria for SG Tubes W/Degradation in Tubesheet Region ML20117P4311996-09-11011 September 1996 Proposed Tech Specs,Revising Plant TS Governing Cw Sys ML20117B2381996-08-15015 August 1996 Proposed Tech Specs 3.3.B.2 Re Containment Cooling Sys & Bases to Conform to Supporting Analyses ML20115G8121996-07-15015 July 1996 Proposed Tech Specs Re Moveable Incore Detector Thimble Reduction ML20095J7951995-12-14014 December 1995 Proposed Tech Specs for Conformance of Administrative Controls Section 6 to Guidance of STS ML20094S2791995-11-28028 November 1995 Proposed Tech Specs Re Radiological Effluent TS Conformance ML20087F3571995-08-0909 August 1995 Proposed Tech Specs Table TS 3.15-1,Pages 1 & 2 & Bases Page B.3.15-1 Marked Up to Implement License Amend Request 1999-08-31
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211K6241999-08-31031 August 1999 Proposed Tech Specs,Changing ISFSI License Conditions 6,7 & 8 & TS 3/4.1 by Permitting Inclusion of Bpras & Thimble Plug Devices in Sf Assemblies Stored in TN-40 Casks ML20206R0621999-05-13013 May 1999 Proposed Tech Specs,Removing Plant Organization Structure Requirement ML20205S3331999-04-20020 April 1999 Proposed Tech Specs Changing Implementation Date for Relocation from TS to UFSAR of Requirements in TS 3.1.E & Flooding Shutdown Requirements in TS 5.1 ML20205Q0351999-04-12012 April 1999 Proposed Tech Specs,Relocating Shutdown Margin Requirements from TS to COLR ML20204H3601999-03-19019 March 1999 Proposed Tech Specs Removing Dates of Two NRC SERs & Correcting Dates of One SER Listed in Section 2.C.4, Fire Protection ML20207F2901999-03-0101 March 1999 Proposed Revised Tech Specs Incorporating Combustion Engineering SG Welded Tube Sleeve TR Rev ML20203A2181999-02-0505 February 1999 Proposed Tech Specs,Changing TS 4.12, SG Tube Surveillance to Incorporate Changes to Abb C-E Sleeve Design Assumptions & Installation Techniques ML20196B9721998-11-25025 November 1998 Proposed Tech Specs,Allowing Limited Inoperability of Bast Level Channels & Transfer Logic Channels to Provide for Required Testing & Maint of Associated Components ML20155G6321998-11-0303 November 1998 Proposed Tech Specs B.3.1-7 & B.3.1-7a,rev 133A Re Reactor Coolant Sys ML20154S2101998-10-23023 October 1998 Proposed Tech Specs Clarifying Conditions That Constitute Operable Irpi Sys Channels ML20195F1391998-10-0808 October 1998 Non-proprietary Version of Rev 1 to NSPNAD-97002, Steam Line Break Methodology ML20151U3651998-09-0404 September 1998 Proposed Tech Specs TS.3.1-5,TS.4.18-1 & B.4.18-1,clarifying SRs & LCOs for Operability for Reactor Coolant Vent Sys ML20237B5061998-08-12012 August 1998 Proposed Tech Specs Re Conformance of Administrative Controls Section 6 to Guidance of Std Tech Specs ML20151Z9181998-08-0303 August 1998 Rev 0 to 5AWI 6.1.2, Design Outputs,Review & Verification ML20151Z9011998-08-0303 August 1998 Rev 2 to 5AWI 6.1.0, Design Change General ML20236T6041998-07-20020 July 1998 Proposed Tech Specs Incorporating Elevated F* SG Tube Repair Criteria ML20249A7641998-06-11011 June 1998 Proposed Tech Specs Re Conformance of Administrative Controls Section 6 to Guidance of Std ML20216G0371998-04-13013 April 1998 Proposed Tech Specs 3.3 Re Engineered Safety Features ML20248M1421998-04-0606 April 1998 Draft NRC Insp Manual Temporary Instruction 2515/XXX Fire Protection Functional Insp (Fpfi) ML20216D0591998-03-0606 March 1998 Proposed Tech Specs Updating Heatup & Cooldown Rate Curves, Incorporating Use of Pressure & Temp Limits Rept & Changing Pressurizer PORVs Operability Temp ML20217P0061998-03-0404 March 1998 Proposed Tech Specs Re Status of Relocated Requirements ML20217N9771998-03-0202 March 1998 Proposed Tech Specs 3.8.D Re Spent Fuel Pool Special Ventilation Sys ML20217P1431998-03-0202 March 1998 Proposed Tech Specs Re Conformance of Administrative Controls Section 6 to Guidance of Std ML20202E5691998-02-10010 February 1998 Proposed Tech Specs 1-1 Re One Time Reduction of Mode 6 Reactor Coolant Sys Boron Concentration ML20198N8301998-01-15015 January 1998 Proposed Tech Specs Pages Allowing Use of Moveable Incore Detector Thimble Reduction for Unit 1,cycle 19 ML20198P0791998-01-0808 January 1998 Proposed Tech Specs Pages Re Suppl 5 to 951214 LAR on Conformance of Administrative Controls Section 6 to Guidance of STS ML20151Z9561998-01-0505 January 1998 Rev 0 to 5AWI 6.1.7, Design Change Work Orders ML20198B1471997-12-29029 December 1997 Proposed TS marked-up & Revised Pages,Incorporating Changes Associated w/951214 LAR ML20212F0471997-10-28028 October 1997 Proposed Tech Specs Pages Revising TS Section 4.12,allowing Use of voltage-based SG Tube Repair Criteria ML20151Z9441997-10-20020 October 1997 Rev 0 to 5AWI 6.1.6, Design Review & Approval ML20217F4761997-10-0303 October 1997 Suppl Proposed Tss,Allowing Use of New SG Tube Sleeve Designs & Installation & Exam Techniques ML20211H7581997-10-0101 October 1997 Proposed Tech Specs Re Physical Mods to Turbine Bldg Cooling Water Header Isolation Logic ML20217C5861997-09-26026 September 1997 Proposed Tech Specs Changes to TS 3.4.B to Change Minimum Conditions for AFW & Permit Startup Operations to Continue W/Inoperable Turbine Driven AFW Pump or Associated Sys Valves Due to Inability to Complete IST Requirements ML20216E4561997-09-0404 September 1997 Proposed Tech Specs,Supporting Conformance to TS Overtime Controls to NRC Guidance Issued 950409 ML20216D1141997-09-0202 September 1997 Proposed Tech Specs,Incorporating Use of New SG Tube Sleeve Designs & Installation & Exam Techniques ML20217M6191997-08-15015 August 1997 Proposed Tech Specs Incorporating C-E SG Welded Sleeve TR, CEN-629-P,Rev 1 ML20149J0251997-06-30030 June 1997 Tech Spec Change Pages B.3.8-2 & B.3.8-5 to Amend Re Spent Fuel Pool Personnel Access Doors ML20141F5011997-05-15015 May 1997 Proposed Tech Specs 3.1.C, Reactor Coolant Sys Leakage & 4.12, SG Tube Surveillance ML20141A0871997-05-0707 May 1997 Proposed Tech Specs Re Spent Fuel Pool Special Ventilation Sys ML20137T2081997-04-10010 April 1997 Proposed Tech Specs,Clarifying Amend Request Re Conformance of Administrative Controls Section 6 to Guidance of STS ML20137W3621997-03-17017 March 1997 Rev 2 to Test Procedure TR-228, Three Hour Fire Test of One and Three Hour Versawrap Raceway Fire Barrier Sys for Conduits & Cable Trays ML20135F7481997-03-0707 March 1997 Proposed Tech Specs Re Cooling Water Sys Emergency Intake Design Basis ML20135A9401997-02-21021 February 1997 Proposed Tech Specs,Allowing Use of Credit for Soluble Boron in Spent Fuel Pool Criticality Analyses ML20134L8901997-02-12012 February 1997 Proposed Tech Specs 3.3-3 Re Safety Injection Pump Low Temp Operations ML20134J6281997-02-0606 February 1997 Proposed Tech Specs 3.3 Re Engineered Safety Features ML20134E9421997-01-29029 January 1997 Proposed Tech Specs Revising Prairie Island Design Bases Re Cooling Water Emergency Intake ML20136H0101997-01-29029 January 1997 Rev 12 to Abnormal Procedure AB-3, Earthquakes ML20135A8251996-11-27027 November 1996 Proposed Tech Specs Incorporating New SG Tube Sleeve Designs & Installation & Exam Techniques ML20135A5091996-11-25025 November 1996 Proposed Tech Specs Implementing Mods Proposed by Suppl to License Amend Request & Revising TS Pp in Final Form to Reflect Changes Proposed by Suppl ML20138G8751996-11-0808 November 1996 Rev 2 to TN-40 Cask Unloading Procedure 1999-08-31
[Table view] |
Text
____ _.
4 Exhibit A I Prairio Island Nuclear Generating Plant i
Suppleu.cnt to License Amendment Request Dated March 20, 1992 Revised Technical Specifications Pages Exhibit C consists of revised pages for the Prairic Island Nuclear Generating Plant Technical Specifications with the proposed changes incorporated. The revised pages are listed below:
TS.3.7-2 TS,4.6 2 l
l 9200000013 920'723 2 PDR ADOCK 0500 P
, , -. , , - . - .- - - - - . ~ . ~ - - _ . . . ~ -
f, 1
+ '
l 5l -
TS.3J/-2 .
f3.7[B. -During STARTUP OPERATION'or' POWER OPELATION, any of thenfollowing-conditions of inor crbility may exist for the. times specified, ~l provided STARTUP Otr.KATION is discontinued until OPERABILITY is ;
restored _ If' OPERABILITY is not' restored within the time. specified,
.i place the ~affected unit (s) in at least 110T SilUTDOWN within the next 6 !
. hours and be'in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
- 1. Onediesel-generatormaybeinoperablefor7daysprovided(a)the-l OPERABILITY of the other dieaal generator is demonstrated
- by performance of surveillance requirement 4'.6. A.1.e within. 24 1 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> **, (b) all engineered safety features' equipment associated
- with the operablo-diesel generator is OPERABLE, (c) the two re. quired' paths from~ the grid to the unit 4 kV safeguards - l distribution system are OPERABLE.and (d) the OPERABILITY of.the-two_ required paths:from the grid-shall be verified OPERABLE within 1 -hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereaf ter.
2s One of the two required paths from the grid to-the unit 4 kV l safegucrds.-distribution system may be inoperahlo for 7 days provided (a) D1 and D2L(Unit 2: DS and D6).dfesel generators are l
- _ < -already operating or are demonstrated to be OPERABLE by sequentially performing surveillance requirement 4.6. A.l.e on each diesel generator within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and (b) the OPERABLE path from l
the grid:shall be verified OPEPABLE within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and~at least once per'8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter.
- 3. One of the:two required paths from the grid to the unit 4'kV l-1 safeguards distribution system and one diesel' generator may be inoperable for.12-hours provided, (a) the OPERABILITY of the other
-diesel generator.is-demonstrated
- by performance'of Surveillance Require' ment 4.6.A.1.e within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> **, (b) allLengineered- safety features equipment associated =with the OPERABLE dieset-generator is OPERABLE, ~ and (c) the OPERABLE path from the ' grid shall be verified OPERABLE within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> t_herea f te r.
- 4 '. = Both ofs theltvo required paths from the grid to the unit 4 kV-. l-safeguards distribution system may be inoperable for 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> J provided the-D1 and D2 (Unit 2: D5 and D6) diesel generators are l
- already operating or:are demonstrated to be OPERABLE by sequentially performing Surveillance requLrement 4.6. A.1.e on each diesel generator within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
- J - The OPERABILITY of. the other diesel generator need not be demonstrated if i
' the diesel. generator inoperability was due to preplanned preventative maintenance or: testing.
l
- This test is required to be completed regardless of when the inoperable diesel; generator is restored'to OPERABILITY.
f E
4:
, )? _ t - \,
4 + f e. . . 3 -
, e - -
- w. --v- g - m --
a
TS.4.6 2 i.'
4.6.A.2. At least once each 6 months, for each diesel generator:
- a. Verify the diesel generator starts and accelerates to at least synchronous speed in less than or equal to 10 se.conds. l
- b. Verify the generator voltage and frequency to be 4160 t 420 volts and 60 i 1.2 Hz within 10 seconds after the start signal.
- c. Manually synchronize the generator, load to at least 1650 kW (Unit 2: 5100 kW to 5300 kW) in less than or equal to 60 seconds and operate for at least one hour,
- d. This test should be conducted in accordance with the _
manufacturer's recoremendations regarding engine prelube and shutdown procedures where possible.
- 3. At least once each 18 months:
- a. Subject each diesel generat.or to a thorough inspection in accordance with procedures prepared in conjunction with the manufacturer's rtcommendations for this class of standby service,
- b. For each unit, simulate a lose of of fsite power in conjunction witii a safety injection signal, and:
- 1. Verify de energization of the emergency bur.es and load shedcing from the emergency buses.
- 2. Verify the diesels start on the auto start signal and energize thc emergency buses in one min te. This test should be conducted in accordance with the reanuf acturer's recommendations l 7 regarding engine prelube and shutdown procedures where -
possible.
- 3. Verify that the auto-connected loads do not exceed 3000 kv (Unit 2: 5100 kW). l
~
- 4. Verify that the diesel generator system trips, except those for engine overspeed, greund fault, and generator differential current, are automatically bypassed. ,
- c. Demonstrate full-load carrying capability for an interval of not less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, of which 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> are at a load equal to 105 to 110 percent of the continuous rating of the emergency diesel (
generator, and 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> are at a load equal to 90 to 100 percent of its continuous rating. Verify the generator voltage and frequency to be 4160 1 420 volts and 60 t 1.2 Hz.
- d. Verify the espability of each generator to reject a load of at j least 650 kw (Unit 2: 860 kw) without tripping. l
- e. During this test, operation of the emergency lighting system shall be ar.certained.