ONTROLLED COPY 3/4.8 ELECTRICAL POWER SYSTEMS 3/4. 8. 1 A, C. SOURCES A.C. SOURCES " OPERATING LIMITING CONOITION FOR OPERATION 3.8.1. 1 As a minimum, the following A. C. electrical power sources shall be OPERABLE:

a, Two physically independent circuits between the offsite transmission network and the onsite Class 1E distribution system, and

b. Three separate and independent diesel generators, each with:

I

1. Separate day fuel tanks containing a minimum of 1400 gallons uel, 55 sco 2.

A

~~l7 separa ga lons fuel storage system containing a of fuel for diesel. generator minimum of 1 (OG-1) and ss s'oo ~9@t g ons of fuel for diesel generator 2 (OG-2), and 33,000 g lons of fuel for diesel generator 3 (OG-3).

arate fuel transfer pumo.

APPLICABILITY: OPERATIONAL CONOITIONS 1, 2, and 3.

ACTION:

With either one offsite circuit or OG-1 or OG-2 of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.C. sources by performing Surveillance Requirements 4.8. 1. 1. 1. a. within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and 4.8. 1. 1. 2.a. 4., for one diesel generator at a time, within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> therafter; restore at least two offsite circuits and OG-1 and OG-2 to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT SHUTOOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLO SHUTOOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

b. With one offsite circuit and OG-1 or OG-2 of the above required A.C..

electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.C. sources by performing Surveillance Require" ments 4.8. 1. 1. 1a. within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and 4.8.1. 1.2a.4., for one diesel generator at a time, within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; restore at least one of the inoperable A.C. sources to OPERABLE status within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or be in at least HOT SHUTOGWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLO SHUTOOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Restore at least two offsite circuits and OG-1 and OG-2 to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from time of initial loss or be in at least HOT SHUTOOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLO SHUTOOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

WASHINGTON NUCLEAR " UiVIT 2 3/4 8-3.

930OXOaOS0 m'Oeoz PDR ADOCK 05000397 P PDR ,, )

4 El

A

~

~

I ELECTRICAL POWER SYSTEHS A.C. SOURCES - SHUTDOWN LIHITIHG COHDITIOH FOR OPERATION 3.8.1.2 As a minimum, the following A.C. electrical power sources shall be OPERABLE:

a~ One circuit between the offsite transmission network and the onsite Class 1E distribution system, and

b. Diesel generator 1 or 2 (DG-1 or DG-2), and diesel generator 3 (DG-3) when the HPCS system is required to be OPERABLE, with each diesel generator having:
1. Day fuel tanks containing a minimum of 1400 ga f fuel.

2.

I A fuel storage system containing a minimum fuel for DG-1 and DG"2, and 33,000 gallons of

~K allons of or DG-3.

3. A fuel transfer pump.

APPLICABILITY: OPERATIONAL CONDITIONS 4, 5, and ".

ACTION:

a. With less than the offsite circuits and/or OG-1 or OG-2 of"the above required A.C. electrical power sources OPERABLE, suspend CORE ALTERATIONS, handling of irradiated fuel in the secondary containment, operations with a potential for draining the reacto~ vessel'nd crane operations over the spent fuel storage pool when fuel assemblies are stored therein. In addition, in OPERATIONAL CONDITIOH 5, with the water level less than 22 feet above the reactor pressure vessel flange, immediately initiate corrective action to restore the required power sources to OPERABLE status as soon as practical.
b. With DG-3 of the above required A. C. electrical power sources inoperable, restore the inoperable diesel generator 1C to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or declare the HPCS system inoperable and take the ACTIOH required by Specification 3.5.2 and 3.5.3 C. The provisions of Specification 3. 0.3 are not applicable.

SUR'/EILLANCE REQUIREMENTS 4.8.1.2 At least the above required A.C. electrical power sources shall be demonstrated OPERABLE per Surveillance Requirements 4.8.1.1.1, 4.8.1.1.2, and 4.8.1.1.3, except for the requirement of 4.8.1.1.2.a.5.

"When handling irradiated fuel in the secondary containment.

WASHINGTON NUCLEAR - UNIT 2 3/4 8" 10

LPI 5.0 Rev. 1 Attachment 7.5 Tech Spec Submittal Check List Item Resolved Comment

1. checked previously submitted requests for AoaC same affected pages.
2. Establish need for additional formatting guidance to NRC.
3. Generic NRC SER reviewed to confirm An~a it covers total scope of the change request.
4. Identify need for separate NRC review or activity to support request (if so, clearly call out in letter).
5. Review similar submittals on other Now Dockets for applicability. cy e Aw~ 4 J greet

+u<+4'05as 8 J cewc~ . Pg crt@~

6. Review Zyindex for AS ~ *~ P o~ ~*+

impact of change on FSAR g Per N~'lo~ pf~$ c~g L PCZ 4avtwEEN L,V<X': <l~~