Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML21097A084 + (Plain Writing Act Compliance Annual Report - April 2021)
- ML22094A130 + (Plain Writing Act Compliance Annual Report - April 2022)
- ML20105A409 + (Plain Writing Act Compliance Annual Report April 2020)
- ML19289G006 + (Plaintiffs First Set of Interrogatories in Civil Action 79-1185,US District Court for Eastern District,Pa)
- ML20259B128 + (Plan & Details Duct Line Sh 1, as-built.Issue 12)
- ML20259D596 + (Plan & Details:Primary Auxiliary Bldg. Sheet 11)
- ML20259D600 + (Plan & Details:Primary Auxiliary Bldg. Sheet 15)
- ML20259D592 + (Plan & Details:Primary Auxiliary Bldg. Sheet 4)
- ML20259D588 + (Plan & Details:Primary Auxiliary Bldg. Sheet 7)
- ML20261D190 + (Plan & Sections High Pressure Coolant Injection Reactor Bldg - Unit 1 & 2.Sheet 1.No Document Date)
- ML13289A094 + (Plan (SQN) NPDES Permit No. TN0026450 - Application for Renewal)
- ML20128H049 + (Plan (VEGP) Unit 2 Cycle 6 COLR)
- ML022200491 + (Plan (WBN) - Revisions to Emergency Plan Implementing Procedures, Including Revision 20 to EPIP-1, Revision 19 to EPIP-2, Revision 22 to EPIP-3 & Revision 23 to EPIP-4)
- ML092740149 + (Plan - Bellefonte Nuclear Plant Units 1 and 2 - Staff Plan for Assessment of Transition to Deferred Plant Status (Tac Nos. ME1904 and ME1905))
- ML040980500 + (Plan - Emergency Plan Changes, Revision 19)
- IR 05000483/2025010 + (Plan - Fire Protection Team Inspection Report 05000483/2025010)
- ML25176A209 + (Plan - Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000440/2025402)
- ML15149A166 + (Plan - Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection (Mxg))
- IR 05000263/2024001 + (Plan - Integrated Inspection Report 05000263/2024001)
- IR 05000483/2024004 + (Plan - Integrated Inspection Report 05000483/2024004)
- ML19347D107 + (Plan - Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection)
- ML20261B598 + (Plan - Onsite PMF Barrier S1 + 95 to S17 + 00. Sheet 2 of 7)
- ML20261B604 + (Plan - Onsite PMF Barrier S17 + 00 to S29 + 56. Sheet 3 of 7)
- ML20261B609 + (Plan - Onsite PMF Barrier S29 + 56 to S39 + 48. Sheet 4 of 7)
- JAFP-19-0011, Plan - Physical Security Plan, Revision 20 + (Plan - Physical Security Plan, Revision 20)
- ML20266F240 + (Plan - Plant Column Grid)
- ML24298A068 + (Plan - Regulatory Audit in NRC Staff’S Support of Review of EPRI Report 3002028939, Risk-informed High Energy Line Break Evaluation Requirements)
- IR 05000263/2021011 + (Plan - Temporary Instruction 2515/194 Inspection; Ibspection Report 05000263/2021011)
- ML20261B921 + (Plan Above Basement Floor Reactor Containment Vessel)
- ML20045C474 + (Plan Annual Exercise,930609)
- ML20266C888 + (Plan Arrangement of Spent Fuel Storage Pool (Removable Poison/Poison Wall))
- ML20260J942 + (Plan Arrangement of Spent Fuel Storage Pool)
- ML20263S322 + (Plan Arrangement:New Fuel Storage Racks)
- ML14030A284 + (Plan Completion Report for the VB 1 Area)
- RS-14-029, Plan Completion Report for the VB 1 Area + (Plan Completion Report for the VB 1 Area)
- ML14030A285 + (Plan Completion Report for the VB 2/3 and Pond Area)
- RS-14-029, Plan Completion Report for the VB 2/3 and Pond Area + (Plan Completion Report for the VB 2/3 and Pond Area)
- ML14030A286 + (Plan Completion Report for the VB 4 Area)
- RS-14-029, Plan Completion Report for the VB 4 Area + (Plan Completion Report for the VB 4 Area)
- ML14030A287 + (Plan Completion Report for the VB 6 Area)
- RS-14-029, Plan Completion Report for the VB 6 Area + (Plan Completion Report for the VB 6 Area)
- ML14030A288 + (Plan Completion Report for the VB 7 Area)
- RS-14-029, Plan Completion Report for the VB 7 Area + (Plan Completion Report for the VB 7 Area)
- ML20260L116 + (Plan El 152 Ft 6 Inches Outline & Rebar Standby Service Water Pumphouse & Cooling Tower 1)
- ML17334B630 + (Plan Elec Equipment Cdts & Cbl Troughs Aux Bldg Below El 624 0 & 625 10)
- ML17334B631 + (Plan Elect Equip Cdts & Cable Troughs Aux Bldg Below El 609 O)
- ML032600170 + (Plan Heat-Up for Reactor Coolant System Pressure Test Suspended Because of Emergent Issues)
- NL-04-1042, Plan Joseph M. Farley Nuclear Plant, and Vogtle Electric Generating Plant, 10 CFR 50.46 ECCS Evaluation Model Annual Reports for 2003 + (Plan Joseph M. Farley Nuclear Plant, and Vogtle Electric Generating Plant, 10 CFR 50.46 ECCS Evaluation Model Annual Reports for 2003)
- ML061180057 + (Plan Management Changes)
- IR 05000324/2024402 + (Plan Material Control and Accounting Program Inspection Report 05000324/2024402 and 05000325/2024402 - Cover Letter)
- ML023100563 + (Plan Operating Manual, Emergency Plan Implementing Procedure)