ML25176A209

From kanterella
Jump to navigation Jump to search
Plan - Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000440/2025402
ML25176A209
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 06/25/2025
From: Lindsay Merker
NRC/RGN-III/DORS/EB2
To: Tony Brown
Vistra Operations Company
References
IR 2025402
Download: ML25176A209 (1)


See also: IR 05000440/2025402

Text

Terry Brown

Acting Site Vice President

Vistra Operations Company, LLC

Perry Nuclear Power Plant

10 Center Road

Perry, OH 44081

SUBJECT:

PERRY NUCLEAR POWER PLANT - INFORMATION REQUEST FOR THE

CYBER-SECURITY BASELINE INSPECTION, NOTIFICATION TO PERFORM

INSPECTION 05000440/2025402

Dear Terry Brown:

On September 22, 2025, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline

inspection in accordance with Inspection Procedure (IP) 71130.10 Cyber-Security, Revision 0

at your Perry Nuclear Power Plant. The inspection will be performed to evaluate and verify your

ability to meet the NRCs Cyber-Security Rule, Title 10, Code of Federal Regulations (CFR),

Part 73, Section 54, Protection of Digital Computer and Communication Systems and

Networks. The onsite portion of the inspection will take place September 22-26, 2025.

Experience has shown that baseline inspections are extremely resource intensive, both for the

NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site

and to ensure a productive inspection for both parties, we have enclosed a request for

documents needed for the inspection. These documents have been divided into four groups.

The first group specifies information necessary to assist the inspection team in choosing the

focus areas (i.e., sample set) to be inspected by the cyber-security IP. This information should

be made available electronically no later than July 28, 2025. The inspection team will review this

information and, by August 1, 2025, will request the specific items that should be provided for

review.

The second group of additional requested documents will assist the inspection team in the

evaluation of the critical systems and critical digital assets (CSs/CDAs), defensive architecture,

and the areas of the licensees Cyber-Security Plan (CSP) selected for the cyber-security

inspection. This information will be requested for review in the regional office prior to the

inspection by September 2, 2025, as identified above.

The third group of requested documents consists of those items that the inspection team will

review, or need access to, during the inspection. Please have this information available by the

first day of the onsite inspection, September 22, 2025.

June 25, 2025

T. Brown

2

The fourth group of information is necessary to aid the inspection team in tracking issues

identified as a result of the inspection. It is requested that this information be provided to the

lead inspector as the information is generated during the inspection. It is important that all of

these documents are up-to-date and complete in order to minimize the number of additional

documents requested during the preparation and/or the onsite portions of the inspection.

The lead inspector for this inspection is Lindsay Merker. We understand that our regulatory contact

for this inspection is George Dujanovic of your organization. If there are any questions about the

inspection or the material requested, please contact the lead inspector at 630-829-9621 or via

email at Lindsay.Merker@nrc.gov.

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget,

Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required

to respond to a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget control

number.

In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,

of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available

electronically for public inspection in the NRCs Public Document Room or from the

Publicly Available Records (PARS) component of the NRCs Agencywide Documents

Access and Management System (ADAMS). ADAMS is accessible from the NRC website

at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

Lindsay Merker, Senior Project Engineer

Technical Support Staff

Division of Operating Reactor Safety

Docket No. 50-440

License No. NPF-58

Enclosure:

Cyber-Security Inspection

Document Request

cc w/encl: Distribution via LISTSERV

Signed by Merker, Lindsay

on 06/25/25

T. Brown

3

Letter to Terry Brown from Lindsay Merker dated June 25, 2025.

SUBJECT:

PERRY NUCLEAR POWER PLANT - INFORMATION REQUEST FOR THE

CYBER-SECURITY BASELINE INSPECTION, NOTIFICATION TO PERFORM

INSPECTION 05000440/2025402

Distribution:

Tim Steadham

RidsNrrPMPerry Resource

RidsNrrDorlLpl3

RidsNrrDroIrib Resource

Jack Giessner

Mohammed Shuaibi

Diana Betancourt-Roldan

John Pelchat

David Curtis

Jared Heck

R3-DORS

ADAMS Accession Number: ML25176A209

Publicly Available

Non-Publicly Available

Sensitive

Non-Sensitive

OFFICE

RIII

NAME

LMerker:anm

DATE

06/25/2025

OFFICIAL RECORD COPY

PERRY CYBER-SECURITY INSPECTION DOCUMENT REQUEST

Enclosure

Inspection Report: 05000440/2025402

Inspection Dates: September 22-26, 2025

Inspection Procedure: IP 71130.10, Cyber-Security, Revision 0

NRC Inspectors: Lindsay Merker, Lead

Kevin Fay

630-829-9621

630-829-9866

Lindsay.Merker@nrc.gov

Kevin.Fay@nrc.gov

NRC Contractors: Alan Konkal

Trace Coleman

Alan.Konkal@nrc.gov

Trace.Coleman@nrc.gov

I.

Information Requested for In-Office Preparation

The initial request for information (i.e., first RFI) concentrates on providing the

inspection team with the general information necessary to select appropriate

components and Cyber-Security Plan (CSP) elements to develop a site-specific

inspection plan. The first RFI is used to identify the list of critical systems and critical

digital assets (CSs/CDAs) plus operational and management (O&M) security control

portions of the CSP to be chosen as the sample set required to be inspected by

the cyber-security IP. The first RFIs requested information is specified below in

Table RFI #1. The Table RFI #1 information is requested to be provided to the

regional office by July 28, 2025, or sooner, to facilitate the selection of the specific

items that will be reviewed during the onsite inspection weeks.

The inspection team will examine the returned documentation from the first RFI

and identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a

more focused follow-up request to develop the second RFI. The inspection team

will submit the specific systems and equipment list to your staff by August 1, 2025,

which will identify the specific systems and equipment that will be utilized to evaluate

the CSs/CDAs, defensive architecture, and the areas of the licensees CSP selected

for the cyber-security inspection. We request that the additional information provided

from the second RFI be made available to the regional office prior to the inspection,

by September 2, 2025.

The required Table RFI #1 information shall be provided electronically to the lead

inspector by July 28, 2025. If a compact disc (CD) is provided, please provide four

copies (one for each inspector/contactor). The preferred file format for all lists is a

searchable Excel spreadsheet file. These files should be indexed and hyperlinked

to facilitate ease of use. If you have any questions regarding this information,

please call the inspection team leader as soon as possible.

PERRY CYBER-SECURITY INSPECTION DOCUMENT REQUEST

2

Table RFI #1

Request:

IP Ref

1

A list of all Identified CSs/CDAs-highlight/note any additions,

deletions, reclassifications due to new guidance from white papers,

changes to NEI 10-04, 13-10, etc., since the last cyber-security

inspection

Overall

2

A list of Emergency Preparedness and Security onsite and offsite

digital communication systems

Overall

3

Network Topology Diagrams to include information and data flow for

critical systems in Levels 2, 3 and 4 (If available)

Overall

4

Ongoing Monitoring and Assessment program documentation

03.01(a)

5

The most recent effectiveness analysis of the Cyber-Security

Program

03.01(b)

6

Vulnerability screening/assessment and scan program documentation

03.01(c)

7

Cyber-Security Incident response documentation, including incident

detection, response, and recovery documentation as well as

contingency plan development, implementation and including any

program documentation that requires testing of security boundary

device functionality

03.02(a)

and

03.04(b)

8

Device Access and Key Control documentation

03.02(c)

9

Password/Authenticator documentation

03.02(c)

10

User Account/Credential documentation

03.02(d)

11

Portable Media and Mobile Device control documentation, including

kiosk security control assessment/documentation

03.02(e)

12

Design change/modification program documentation and a list of all

design changes that affected CDAs that have been installed and

completed since the last cyber-security inspection, including either a

summary of the design change or the 50.59 documentation of the

change

03.03(a)

13

Supply Chain Management documentation including security impact

analysis for new acquisitions

03.03(a),

(b) and

(c)

PERRY CYBER-SECURITY INSPECTION DOCUMENT REQUEST

3

14

Configuration Management documentation including any security

impact analysis performed due to configuration changes since the last

inspection

03.03(a)

and (b)

15

Cyber-Security Plan and any 50.54(p) analysis to support changes to

the plan since the last inspection

03.04(a)

16

Cyber-Security Metrics tracked (if applicable)

03.06 (b)

17

Provide documentation describing any cyber-security changes to the

access authorization program since the last cyber-security inspection

Overall

18

Provide a list of all procedures and policies provided to the NRC with

their descriptive name and associated number (if available)

Overall

19

Performance testing report (if applicable)

03.06 (a)

In addition to the above information please provide the following:

(1)

Electronic copy of the Updated Final Safety Analysis Report (UFSAR)

and Technical Specifications;

(2)

Name(s) and phone numbers for the regulatory and technical contacts; and

(3)

Current management and engineering organizational charts.

Based on this information, the inspection team will identify and select specific systems

and equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and

submit a list of specific systems and equipment to your staff by August 1, 2025, for the

second RFI (i.e., RFI #2).

II.

Additional Information Requested to be Available Prior to Inspection

As stated in Section I above, the inspection team will examine the returned

documentation requested from Table RFI #1 and submit the list of specific systems

and equipment to your staff by August 1, 2025, for the second RFI (i.e., RFI #2).

The second RFI will request additional information required to evaluate the

CSs/CDAs, defensive architecture, and the areas of the licensees CSP selected

for the cyber-security inspection. The additional information requested for the

specific systems and equipment is identified in Table RFI #2.

The Table RFI #2 information shall be provided electronically to the lead inspector

by September 2, 2025. If a CD is provided, please provide four copies (one for each

inspector/contactor). The preferred file format for all lists is a searchable Excel

spreadsheet file. These files should be indexed and hyperlinked to facilitate ease

of use. If you have any questions regarding this information, please call the inspection

team leader as soon as possible.

PERRY CYBER-SECURITY INSPECTION DOCUMENT REQUEST

4

Table RFI #2

Request

Items

For the system(s) chosen for inspection provide:

1

Ongoing Monitoring and Assessment activity performed on the

system(s)

03.01(a)

2

All Security Control Assessments for the selected system(s)

03.01(a)

All vulnerability screenings/assessments associated with or scans

3

performed on the selected system(s) since the last cyber-security

inspection

03.01(c)

Documentation (including configuration files and rules sets) for

Network-based Intrusion Detection/Protection Systems (NIDS/NIPS),

4

Host-based Intrusion Detection Systems (HIDS), and Security

Information and Event Management (SIEM) systems for system(s)

chosen for inspection

03.02(b)

Documentation (including configuration files and rule sets) for

5

intra-security level firewalls and boundary devices used to protect

the selected system(s)

03.02(c)

6

Copies of all periodic reviews of the access authorization list for the

selected systems since the last inspection

03.02(d)

7

Baseline configuration data sheets for the selected CDAs

03.03(a)

8

Documentation on any changes, including Security Impact Analyses,

performed on the selected system(s) since the last inspection

03.03(b)

9

Copies of the purchase order documentation for any new equipment

purchased for the selected systems since the last inspection

03.03(c)

10

Copies of any cyber-security drills performed since the last

inspection, along with any reports or assessments generated

03.02(a)

03.04(b)

Copy of the individual recovery plan(s) for the selected system(s)

11

including documentation of the results the last time the backups

were executed

03.02(a)

03.04(b)

Corrective actions taken as a result of cyber-security

12

incidents/issues to include previous NRC violations and Licensee

Identified Violations since the last cyber-security inspection

03.04(d)

PERRY CYBER-SECURITY INSPECTION DOCUMENT REQUEST

5

III.

Information Requested to be Available on First Day of Inspection

For the specific systems and equipment identified in Section II above, provide the

following RFI (i.e., Table 1ST Week Onsite) electronically by September 22, 2025,

the first day of the inspection.

Table 1ST Week Onsite

Request:

Items

1

Any cyber-security event reports submitted in accordance with

10 CFR 73.77 since the last cyber-security inspection

03.04(a)

Updated Copies of corrective actions taken as a result of

2

cyber-security incidents/issues, to include previous NRC violations

and Licensee Identified Violations since the last cyber-security

inspection, as well as vulnerability-related corrective actions

03.04(d)

In addition to the above information please provide the following:

(1)

Copies of the following documents do not need to be solely available to the

inspection team as long as the inspectors have easy and unrestrained access

to them.

a. UFSAR, if not previously provided;

b. Original Final Safety Analysis Report (FSAR) Volumes;

c.

Original Safety Evaluation Report (SER) and Supplements;

d. FSAR Question and Answers;

e. Quality Assurance (QA) Plan;

f.

Technical Specifications, if not previously provided; and

g.

Latest Individual Plant Examination and Probabilistic Risk

Assessment (IPE/PRA) Report.

(2)

Vendor Manuals, Assessment and Corrective Actions:

a. The most recent Cyber-Security QA audit and/or self-assessment; and

b.

Corrective action documents (e.g., condition reports, including status of

corrective actions) generated as a result of the most recent Cyber-

Security QA audit and/or self-assessment.

PERRY CYBER-SECURITY INSPECTION DOCUMENT REQUEST

6

IV.

Information Requested to be Provided Throughout the Inspection

(1) Copies of any corrective action documents generated as a result of

the inspection teams questions or queries during the inspection.

(2) Copies of the list of questions submitted by the inspection team members

and the status/resolution of the information requested (provided daily

during the inspection to each inspection team member).

If you have any questions regarding the information requested, please contact the inspection

team leader.