Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19140A381 + (Phase 2 Chapter 3 Design of Structures, Components, Equipment, and Systems)
- ML18102A604 + (Phase 2 Draft Test Plan 4-11-18)
- LIC-25-0010, Phase 2 Final Status Survey Report to Support Approved License Termination Plan + (Phase 2 Final Status Survey Report to Support Approved License Termination Plan)
- JAFP-15-0149, Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying License with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109) + (Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying License with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109))
- L-MT-15-090, Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order EA-13-109) Including Phase 1 + (Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order EA-13-109) Including Phase 1)
- IR 05000341/2024013 + (Phase 2 Post Approval License Renewal Report 05000341/2024013)
- IR 05000454/2024011 + (Phase 2 Post- Approval License Renewal Report 05000454/2024011)
- ML19102A109 + (Phase 2 SER-MEB 3.9.2 - Chapter 3)
- ML16256A639 + (Phase 2 Supplemental - License Amendment Request - Digital Power Range Neutron Monitoring (Prnm) System Upgrade)
- ML091760764 + (Phase 3 Potential Loss of RHR Due to Inadequate Cooling of Suction Line During Mode 4 to Mode 3 Transition at Wolf Creek)
- ML040360416 + (Phase 3 SDP Analysis)
- ML040050112 + (Phase 3 SDP Analysis with Handwritten Notes)
- ML040050117 + (Phase 3 SDP Analysis: Arkansas Nuclear One Unit 1)
- ML19170A126 + (Phase 4 - NuScale DC SER with No Open Items (Complete SE Chapters)/Chapter 9 SE with No Open Items)
- ML19170A089 + (Phase 4 - NuScale DC SER with No Open Items (Complete SE Chapters)/Chapter 3 SE with No Open Items)
- ML19171A299 + (Phase 4 - NuScale DC SER with No Open Items (Complete SE Chapters)/Chapter 14 SE with No Open Items)
- ML19170A115 + (Phase 4 - NuScale DC SER with No Open Items (Complete SE Chapters)/Chapter 7 SE with No Open Items)
- ML19171A312 + (Phase 4 - NuScale DC SER with No Open Items (Complete SE Chapters)/Chapter 17 SE with No Open Items)
- ML19060A271 + (Phase 4 Audit Plan for the Audit of NuScale Power, Llc., Documents Related to Reactor Internals Comprehensive Vibration Assessment Program)
- ML19267A086 + (Phase 4 Chapter 14 SER)
- IR 05000254/2022010 + (Phase 4 Post-Approval License Renewal Inspection Report 05000254/2022010 and 05000265/2022010)
- IR 05000315/2023010 + (Phase 4 Post-Approval License Renewal Inspection Report 05000315/2023010 and 05000316/2023010)
- IR 05000282/2022011 + (Phase 4 Post-Approval Site Inspection for License Renewal Report 05000282/2022011 and 05000306/2022011)
- ML19337A787 + (Phase 4 SE Input for Chapter 3 (Public))
- ML19218A037 + (Phase 4 SER - Chapter 10)
- ML19343A027 + (Phase 4 SER - Chapter 6)
- ML19319A684 + (Phase 4 SER - Chapter 8)
- ML21210A174 + (Phase B Covid Assessment Public Meeting Presentation August 3, 2021)
- ML21203A324 + (Phase B Covid Assessment Public Meeting Presentation July 26, 2021)
- ML20063A192 + (Phase I Consolidated Emergency Planning Contention. Certificate of Svc Encl)
- ML20091D437 + (Phase I Cultural Resources Survey & Assessment on Residual Lands at Union Electric Co Callaway Nuclear Plant,Callaway County,Mo, Cultural Resources Mgt Rept 52)
- ML23083B826 + (Phase I Cultural Resources Survey of the Cimarron Environmental Response Trust Property, Logan County, Oklahoma)
- ML18054A393 + (Phase I Cultural Resources Survey of the Kingston-Oak Ridge National Laboratory 161-KV Transmission Line Project, Anderson and Roane Counties, Tennessee; Revised Draft Report (Redacted))
- ML20206P941 + (Phase I Discovery Re Third Request for Production of Documents.W/Certificates of Svc.Related Correspondence)
- ML15027A043 + (Phase I Environmental Site Assessment Stevens Point, Wi, Rev. 1, Appendix C)
- ML15027A042 + (Phase I Environmental Site Assessment Stevens Point, Wi, Rev. 1, Appendix B)
- ML15027A046 + (Phase I Environmental Site Assessment Stevens Point, Wi, Rev. 1, Appendix D)
- ML15027A045 + (Phase I Environmental Site Assessment Stevens Point, Wi, Rev. 1, Appendix a)
- ML15027A044 + (Phase I Environmental Site Assessment Stevens Point, Wi, Rev. 1)
- ML20098E014 + (Phase I Final Report - Systems Analysis (Project Vii). Seismic Safety Margins Research Program)
- ML20211C493 + (Phase I Groundwater Compliance Action Plan for Tuba City, Az,Umtra Site)
- LIC-93-0301, Phase I Rept on IPEEE for FCS Re Tornado,Flooding, Transportation & Nearby Facilities Accidents & Others + (Phase I Rept on IPEEE for FCS Re Tornado,Flooding, Transportation & Nearby Facilities Accidents & Others)
- ML20214S550 + (Phase I Rept, Improved Fatigue Life Evaluation Methods for LWR Components)
- ML030080495 + (Phase I of the Large Area Open Land Survey for FSS)
- ML20034D865 + (Phase I/Stage 3 GDC-2 Temporary Exemption Request,Svc Water Sys Restoration Project,North Anna Units 1 & 2. W/Three Oversize Drawings)
- ML20154M746 + (Phase II - Title I Engineering Assessment of Inactive U Mill Tailings Mexican Hat Site,Mexican Hat,Ut)
- ML20154M797 + (Phase II - Title I Engineering Assessment of Inactive U Mill Tailings Tuba City Site Tuba City,Az)
- ML20154M733 + (Phase II - Title I Engineering Assessment of Inactive U Mill Tailings Riverton Site,Riverton,Wy)
- ML20195J688 + (Phase II Decontamination Rept of Jc Haynes Site,Newark,Oh, Final Rept)
- ML19308B996 + (Phase II Draft Order by Nj Board of Public Utils Denying Jcp&L Petition for Rate Increase Excepting Certain Tariffs)
- ML20059G598 + (Phase II Human Reliability Analysis Notebook Vol 2,Rev 1)