Phase 3 SDP Analysis Performance Deficiency

- ANO Unit 1 fire zone 99-M (North Electrical Switchgear Room) did not meet regulatory requirements for separation of electric cables and equipment of redundant trains of systems necessary to achieve post-fire safe shutdown, and there was lack of adequate procedures for manual actions to achieve post-fire safe shutdown following a fire in fire zone 99-M (or other identified fire zones equivalent to 99-M)

  • Assumptions

- Red train cables are not protected with one-hour rated barrier, and are not separated from the Green train cables by a minimum of 20 feet distance free of intervening combustibles

- No automatic fixed fire suppression system

- Ionization detection system provides alarm in Main Control Room w Credit for fire brigade response and arrival at fire zone 100-N, which is adjacent to fire zone 99-M Heat release rates of 200-500 kW in fire modeling of duration and severity I.),-