Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20095J625 + (Permanent Change (Pc) PC-04 to Rev 7 to Procedure/Work Plan OP-1903.066, Emergency Response Facility Osc)
- ML20029E116 + (Permanent Change B to Rev 6 to General Test Procedure GTP-301, IST of Pumps Second 10-Yr Interval)
- ML20029E118 + (Permanent Change a to Rev 8 to General Test Procedure GTP-302, IST of Valves Second 10-Yr Interval)
- Information Notice 1989-43, Permanent Deformation of Torque Switch Helical Springs in Limitorque SMA-Type Motor Operators + (Permanent Deformation of Torque Switch Helical Springs in Limitorque SMA-Type Motor Operators)
- ML20038D083 + (Permanent Emergency Response Facilities Design Criteria & Description)
- ML20138B156 + (Permanent Exemptions Re Types a & C Leak Testing)
- ML20238D890 + (Permanent Hydrogen Water Chemistry Safety Analysis)
- RC-13-0037, Permanent ILRT Interval Extension Risk Impact Assessment + (Permanent ILRT Interval Extension Risk Impact Assessment)
- RIS 2013-10, Permanent Implant Brachytherapy Medical Event Reporting Under 10 CFR Part 35 + (Permanent Implant Brachytherapy Medical Event Reporting Under 10 CFR Part 35)
- 05000456/FIN-2011008-02 + (Permanent Lead Shielding added to Safety Injection and Chemical Volume and Control System Piping.)
- 05000498/FIN-2012004-03 + (Permanent Modification to Valve 1N122XSI0010A and Eight Others Without Prior NRC Approval)
- ML20058L004 + (Permanent Plant Changes to Accommodate Equilibrium Core Scram Reactivity Insertion Characteristics)
- ML20265B214 + (Permanent Reactor Cavity SEAL-ARRANGEMENT. Sheet 1 of 2)
- ML20265B218 + (Permanent Reactor Cavity SEAL-ARRANGEMENT. Sheet 2 of 2)
- ML13204A304 + (Permanent Removal of Fuel from the Reactor Vessel)
- ML13183A391 + (Permanent Removal of Fuel from the Reactor Vessel)
- ML20154M339 + (Permanent Repair Plan for Arkansas Nuclear One Unit 2 Pressurizer)
- ML070300178 + (Permanent Retention of BRP Exhibit Items Meeting October 24, 2006)
- ML20259D891 + (Permanent Roads,Grading & Drainage Plan Plant Area. Sheet 1)
- ML19319D136 + (Permanent Solution to ECCS Small Breaks Analysis Problem at Crystal River Unit 3)
- ML20046D590 + (Permanently Defueled EAL Bases Document)
- ML19029A154 + (Permanently Defueled Emergency Action Level Technical Bases)
- BVY 16-008, Permanently Defueled Emergency Plan Change, Revision 0 + (Permanently Defueled Emergency Plan Change, Revision 0)
- ML17173A188 + (Permanently Defueled Emergency Plan Emergency Action Levels Technical Bases Manual, Revision 2)
- ML24005A126 + (Permanently Defueled Emergency Plan Implementation Notification)
- 3F0916-02, Permanently Defueled Emergency Plan Implementing Procedures + (Permanently Defueled Emergency Plan Implementing Procedures)
- ML22292A257 + (Permanently Defueled Emergency Plan License Amendment RAI Letter)
- ML17361A080 + (Permanently Defueled Emergency Plan Manual of Emergency Events, Revision 2)
- ML18009A482 + (Permanently Defueled Emergency Plan Manual of Emergency Events Revision 2)
- ML18009A480 + (Permanently Defueled Emergency Plan Manual of Emergency Events Revision 2 Issued 12/12/2017)
- ML18009A419 + (Permanently Defueled Emergency Plan Manual of Emergency Events Revision 2 Issued 12/12/2017)
- BVY 15-039, Permanently Defueled Emergency Plan and Emergency Action Level Scheme - Supplement 3 + (Permanently Defueled Emergency Plan and Emergency Action Level Scheme - Supplement 3)
- ML14168A302 + (Permanently Defueled Emergency Plan and Emergency Action Level Scheme)
- BVY 14-070, Permanently Defueled Emergency Plan and Emergency Action Level Scheme - Supplement 1 + (Permanently Defueled Emergency Plan and Emergency Action Level Scheme - Supplement 1)
- BVY 15-045, Permanently Defueled Emergency Plan and Emergency Action Level Scheme - Supplement 4 + (Permanently Defueled Emergency Plan and Emergency Action Level Scheme - Supplement 4)
- ML16098A473 + (Permanently Defueled Emergency Plan, (Volume 1, PDEP-1))
- 3F0716-02, Permanently Defueled Emergency Plan, Revision 3 and Implementing Procedure, Permanently Defueled Emergency Action Level Bases Manual, Revision 1 + (Permanently Defueled Emergency Plan, Revision 3 and Implementing Procedure, Permanently Defueled Emergency Action Level Bases Manual, Revision 1)
- ML20126E760 + (Permanently Defueled Tech Specs)
- ML17027A165 + (Permanently Defueled Tech Specs Amendment 254 Section 5.0)
- ML17027A164 + (Permanently Defueled Tech Specs Amendment 254, Section 4.0)
- ML17027A163 + (Permanently Defueled Tech Specs Amendment 254, Table of Contents)
- ML20059L476 + (Permeability Test Results & Their Implication as to Bathtub Potential for Estes Gulch Disposal Site,Umtra Project - Rifle,Colorado,Oct 1993. (3885-RFL-R-01-05012-01))
- ML20215N498 + (Permeameter Studies of Water Flow Through Cement and Clay Borehole Seals in Granite,Basalt and Tuff)
- ML20040G433 + (Permissible Radionuclide Loading for Organic Ion Exchange Resins from Nuclear Power Plants, Draft Rept)
- ML20081C113 + (Permissible Radionuclide Loading for Organic Ion Exchange Resins from Nuclear Power Plants)
- ML19337D529 + (Permission Granted to Framatome to Receive Data and Data Reports for Rocom Testing Conducted as Part of the PKL2 Project)
- ML020940148 + (Permission to Issue an Analysis Report on PTS -- SMSAB-02-01)
- ML17252B592 + (Permission to Make a Limited Appearance and Present Testimony in Morris, Illinois Dec 7 on Dresden 2 Project)
- LIC-15-0010, Permission to Use Copyrighted Graphics and Materials + (Permission to Use Copyrighted Graphics and Materials)
- ML14099A354 + (Permissive Circuitry I & Command Control Circuitry Ii. Sheet 3)
- ML20262B903 + (Permissive Relay Circuits for Scram Bkr Trip Annunciator & Event Recorder)