Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20207A480 + (Partially Withheld Summary of Interview Re Tee Shirt Incident)
- ML20212G939 + (Partially Withheld Summary of Interview on 850307 Re Allegations Concerning Facility)
- ML20147E934 + (Partially Withheld Summary of Investigation Referral Board Meeting 1 on 861202 Re Decision or Recommendation on Referrals)
- ML20212G702 + (Partially Withheld Summary of K Elder 841022 Telcon W/Senior Resident Inspector Re Allegations That Drugs Planted in L Elder Car Because of Safety Issues Identified at Plant. Heroin Found in Car During 841012 Search)
- ML20195G730 + (Partially Withheld Summary of NRR Mgt Team 871006-09 Visits to Sites & Region III Ofcs.Region III Well Managed)
- ML20207Q128 + (Partially Withheld Summary of Util Quality Investigation Team 840417 Interview.Related Documentation Encl)
- ML20236U425 + (Partially Withheld Suppl to Vol I of Technical Assistance in Developing & Implementing Program & Procedures for Reactors Requiring Special Insp Resources, Proposal)
- ML20202B204 + (Partially Withheld Supplemental Assistance to Insp Rept A4-83-005 Re Allegations of Improper Const Practices by Brown & Root,Inc.Related Info Encl)
- ML20211M521 + (Partially Withheld Supplemental Response to Noncompliance Noted in Insp Rept 70-1113/85-01 (Ref 10CFR2.790(d)). Corrective Actions:Policy Adjusted on 850705 to Eliminate Delegations of Authority (Not Responsibility) Until Revised)
- ML20211M480 + (Partially Withheld Supplemental Response to Violations Noted in Insp Rept 70-1113/85-01 (Ref 10CFR2.790(d)).Corrective Actions:Policy Adjusted on 850708,eliminating Delegations of Authority (Not Responsibility) Until Time for Revs)
- ML20211M505 + (Partially Withheld Supplemental Response to Violations Noted in Insp Rept 70-1113/86-01 on 850114-17 (Ref 10CFR2.790(d)). Clarification of Phase, Provides Mechanism Provided)
- ML20155J641 + (Partially Withheld Supplemental Results of Joint Nrr/Ofc of Investigations Evaluation of Mv Cooper Re Leak Rate Testing Irregularities.Cooper Conducted Leak Rate Tests W/O Regard for Test Procedures.Mgt Attitudes Lax)
- ML20206C276 + (Partially Withheld Team Insp Rept 70-1113/88-13 on 880926-30 (Ref 10CFR2.790).One Violation Noted.Major Areas Inspected: Licensee Nuclear Matl Control & Accounting Program Used to Achieve Performance Objectives for Period Ending 880801)
- ML20236E415 + (Partially Withheld Technical Assistance for Design Insp Svcs, Technical Proposal)
- ML20211J848 + (Partially Withheld Technical Interview Transcript.Related Info Encl)
- ML20236U430 + (Partially Withheld Technical Mgt Proposal to NRC to Provide Technical Assistance in Developing & Implementing Programs & Procedures for Reactors Requiring Special Insp Resources)
- ML20151W214 + (Partially Withheld Technical Proposal RS-ARM-88-211, Proposal to Provide Operations & Maint of Nuclear Documentation Control Sys)
- ML20213F085 + (Partially Withheld Technical/Mgt Proposal in Response to USNRC RFP RS-OIE-85-156, `Technical Assistance in Developing & Implementing Programs & Procedures for Reactors Requiring Special Insp Resources)
- ML20213F090 + (Partially Withheld Technical/Mgt Proposal in Response to USNRC RFP RS-OIE-85-158, `Technical Assistance in Developing & Implementing Programs & Procedures for Insp of Operating Reactors During Major Outages)
- ML20199A543 + (Partially Withheld Testimony of Wj Collins Re Welding Fabrication Concerns)
- ML20056A334 + (Partially Withheld Topical Rept Evaluation of CEN-387-P, Pressurizer Surge Line Flow Stratification Evaluation. Rept Considered Inadequate to Justify Continued Operation for 40-yr Plant Life)
- ML20059B986 + (Partially Withheld Topical Rept Evaluation of Cen 387-P, Pressurizer Surge Line Flow Stratification Evaluation. Rept Found Inadequate to Justify Continued Operation for 40-yr Plant Life)
- ML20198L337 + (Partially Withheld Transcript of 821108 Interview W/J Ellis, D Tomlinson,R Stewart & R Herr in Arlington,Tx)
- ML20202C133 + (Partially Withheld Transcript of 830824 Investigative interview.Pp.1-29.Related Info Encl)
- IA-87-635, Partially Withheld Transcript of 831103 Closed Meeting in Washington,Dc Re Hearing Requests & Lifting of Suspension at Plant + (Partially Withheld Transcript of 831103 Closed Meeting in Washington,Dc Re Hearing Requests & Lifting of Suspension at Plant)
- ML20147D175 + (Partially Withheld Transcript of 831103 Closed Meeting in Washington,Dc Re Hearing Requests & Lifting of Suspension at Plant)
- IA-84-744, Partially Withheld Transcript of 840105 Interview.Pp 1-69 + (Partially Withheld Transcript of 840105 Interview.Pp 1-69)
- ML20237G414 + (Partially Withheld Transcript of 840105 Interview.Pp 1-69)
- ML20237G396 + (Partially Withheld Transcript of 840112 Interview.Pp 1-60)
- ML20237G369 + (Partially Withheld Transcript of 840113 Interview.Pp 1-60)
- ML20198H787 + (Partially Withheld Transcript of 840227 Investigative Interview in Arlington,Tx.Pp 1-79.Supporting Documentation Encl)
- ML20244A780 + (Partially Withheld Transcript of 840718 Telcon in Glen Rose, Tx.Pp 38,543-38,566)
- ML20244A786 + (Partially Withheld Transcript of 840718 in Camera Deposition in Glen Rose,Tx.Pp 55,500-55,733)
- ML20244A817 + (Partially Withheld Transcript of 840719 in Camera Discovery Deposition in Glen Rose,Tx.Pp 1-338)
- ML20244A792 + (Partially Withheld Transcript of 840719 in Camera Discovery Deposition in Glen Rose,Tx.Pp 1-99)
- ML20244A804 + (Partially Withheld Transcript of 840720 in Camera Discovery Deposition in Glen Rose,Tx.Pp 100-130)
- ML20244A829 + (Partially Withheld Transcript of 840720 in Camera Discovery Deposition in Glen Rose,Tx.Pp 339-564)
- ML20244A808 + (Partially Withheld Transcript of 840720 in Camera Deposition of Ld Howard in Glen Rose,Tx.Pp 56,500-56,509)
- IA-86-180, Partially Withheld Transcript of 840725 Deposition in Glen Rose,Tx + (Partially Withheld Transcript of 840725 Deposition in Glen Rose,Tx)
- ML20234B203 + (Partially Withheld Transcript of 840725 Deposition in Glen Rose,Tx)
- ML20198L431 + (Partially Withheld Transcript of 840802 Technical Interview in Fort Worth,Tx Re Welding Activities & Pipe Hangars Installation.Pp 1-43.Related Info Encl)
- ML20207H221 + (Partially Withheld Transcript of 840808 Technical Interview W/D Nisich Re Qa/Qc Activities at Plant.Pp 1-74)
- ML20207H225 + (Partially Withheld Transcript of 840823 Technical Interview W/D Nisich in Granbury,Tx Re Possible Intimidation,Upgrading of Matl & sign-off on Nonconformance Rept.Pp 1-41)
- ML20198K537 + (Partially Withheld Transcript of 840823 Technical Interview in Granbury,Tx Re Installation of Pipe Hanger & Use of Oxygen Analyzers During Pipe Welding.Pp 1-20.Related Info Encl)
- ML20199H135 + (Partially Withheld Transcript of 840917 Comanche Peak Technical Review Team Technical Interview of Witness Y in Granbury,Tx.Pp 1-22.Partially Deleted Interview Format & Record of Rc Tang 841025 Telcon Encl)
- ML20234B183 + (Partially Withheld Transcript of 841018 Investigative Deposition in Glen Rose,Tx)
- IA-88-229, Partially Withheld Transcript of 841022 Closed Meeting in Washington,Dc Re Status of near-term Ols.Pp 33-55 + (Partially Withheld Transcript of 841022 Closed Meeting in Washington,Dc Re Status of near-term Ols.Pp 33-55)
- ML20235W320 + (Partially Withheld Transcript of 841022 Closed Meeting in Washington,Dc Re Status of near-term Ols.Pp 33-55)
- ML20234B196 + (Partially Withheld Transcript of 841025 Investigative Interview in Glen Rose,Tx)
- ML20205Q738 + (Partially Withheld Transcript of 841107 Technical Interview in Fort Worth,Tx.Pp 1-90)
- ML20205Q742 + (Partially Withheld Transcript of 841107 Technical Interview in Fort Worth,Tx.Pp 91-180.Supporting Documentation Encl)
- ML20198H850 + (Partially Withheld Transcript of 841108 Telcon to Interview Miles in Washington,Dc.Pp 1-45)