Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML050960033 + (Notice of End-of-Cycle Public Meeting with Southern California Edison Company; San Onofre Nuclear Generating Station)
- ML081440391 + (Notice of End-of-Cycle Public Meeting with Energy Northwest to Present and Discuss Performance Results of the Columbia Generating Station for the Period of January 1 Through December 31, 2007)
- ML100670614 + (Notice of End-of-Cycle Public Meeting with Southern California Edison to Discuss the Performance Results for Period January 1 Through December 31, 2009)
- ML030770790 + (Notice of End-of-cycle Meeting with Amerenue/Union Electric Company Callaway Plant Performance Results for Period of 01/01/2002 - 12/31/2002)
- ML030770807 + (Notice of End-of-cycle Meeting with Entergy Operations, Inc. River Bend Station Performance Results for Period of 01/01/2002 - 12/31/2002)
- ML081000114 + (Notice of End-of-cycle Public Meeting Between the NRC and Entergy to Present and Discuss Performance Results of the Arkansas Nuclear One, Units 1 and 2, Facility for the Period of January 1 Though December 31, 2007)
- ML19312C628 + (Notice of Energy Reorganization Act Enactment on 741011, Transferring AEC Regulatory & Licensing Functions to Nrc. Certificate of Svc Encl)
- ML20246G988 + (Notice of Enforcement Conference W/Util on 890323 in Arlington,Tx)
- ML20057G518 + (Notice of Enforcement Conference with Waterford 3 Steam Generating Station to Discuss Apparent Violations of NRC Requirements Related to Waterford 3 Steam Electric Stations Radiation Safety and Security Program)
- ML113560359 + (Notice of Enforcement Discretion (NOED) 11-2-004)
- ML110630276 + (Notice of Enforcement Discretion (NOED) Request Technical Specification (TS) 3.8.1, AC Sources - Operating (Primary TS) TS 3.7.8, Nuclear Service Water System (Nsws) (Secondary TS))
- ML13107B507 + (Notice of Enforcement Discretion (NOED) for Brunswick Steam Electric Plant, Unit 1 (NOED No. 13-2-001))
- ML110620718 + (Notice of Enforcement Discretion (NOED) for Catawba Nuclear Station (NOED No. 11-2-002))
- ML16069A341 + (Notice of Enforcement Discretion (NOED) for Brunswick Steam Electric Plant Unit 2 (CAC No. MF7427, NOED No. 16-2-001))
- ML030520647 + (Notice of Enforcement Discretion (NOED) for Energy Northwest Columbia Generation Station (NOED 03-4-001))
- ML14204A652 + (Notice of Enforcement Discretion (NOED) for Florida Power and Light Company Regarding Turkey Point Nuclear Generating Station Units 3 and 4 (NOED No. 14-2-001))
- 05000482/FIN-2013003-07 + (Notice of Enforcement Discretion (NOED) 13-4-002 for a Non-Functional Class 1E Air Conditioning Unit)
- ML030520302 + (Notice of Enforcement Discretion (NOED) Request Technical Specifications (TS) 3.7.5 - Auxiliary Feedwater System & TS 3.6.3 - Containment Isolation Valves)
- ML23158A133 + (Notice of Enforcement Discretion (NOED) for Fermi Power Plant, Unit Two (EPID L-2023-LLD-0000) – Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/ Emergency Equipment Service Water (EESW) System and Ultimate Heat Sink)
- ML111570484 + (Notice of Enforcement Discretion (NOED) for Duke Energy Carolinas Regarding Oconee Nuclear Station Units 2 and 3 NOED No. 11-2-003))
- ML031330799 + (Notice of Enforcement Discretion (NOED) for Duke Energy Corp. Catawba, Unit 1)
- ML032880456 + (Notice of Enforcement Discretion (NOED) Request Technical Specification (TS) 3.6.6 Containment Spray System (CSS))
- ML031340383 + (Notice of Enforcement Discretion (NOED) Request Technical Specification (TS) 3.6.6 Containment Spray System (CSS))
- ML030651019 + (Notice of Enforcement Discretion (NOED) for Tennessee Valley Authority Regarding Sequoyah Unit 2)
- ML12228A623 + (Notice of Enforcement Discretion (NOED) for Surry Power Station, Units 1 and 2, Technical Specification 3.16 Emergency Power System, Specific to Emergency Diesel Generator (EDG) 02-EE-EG-1 (NOED No. 12-2-003))
- CNS-18-031, Notice of Enforcement Discretion (NOED) Request + (Notice of Enforcement Discretion (NOED) Request)
- ML032330091 + (Notice of Enforcement Discretion (NOED) for Duke Energy Corporation Re Catawba Unit 2)
- ML14071A568 + (Notice of Enforcement Discretion (NOED) for Catawba Nuclear Station Unit 1 (NOED No. 14-2-001))
- ML12208A344 + (Notice of Enforcement Discretion (NOED) for Shearon Harris Nuclear Power Plant, Unit 1 (NOED No. 12-2-001))
- ML11356A241 + (Notice of Enforcement Discretion (NOED) Request Technical Specification (TS) 3.7.11, Control Room Area Chilled Water System (Cracws). TS Limiting Condition for Operation (LCO) 3.0.3)
- ML18171A033 + (Notice of Enforcement Discretion (NOED) for Catawba Nuclear Station, Unit 2, NOED 18-2-001)
- 05000250/FIN-2014004-02 + (Notice of Enforcement Discretion (NOED) due to Exceeding Ultimate Heat Sink Temperature)
- ML082760667 + (Notice of Enforcement Discretion (NOED) for Tennessee Valley Authority Regarding Sequoyah Nuclear Plant, Units 1 and 2 (TAC No. MD9719 & MD9720, NOED No. 08-2-001))
- ML060540337 + (Notice of Enforcement Discretion (NOED) for Florida Power and Light Regarding St. Lucie Unit 2)
- ML060540308 + (Notice of Enforcement Discretion (NOED) for Florida Power and Light Regarding St. Lucie Unit 2)
- ML052900499 + (Notice of Enforcement Discretion (NOED) for Duke Power Regarding McGuire Nuclear Station Unit 2)
- ML21271A100 + (Notice of Enforcement Discretion (NOED) for Seabrook Station, Unit No. 1)
- ML032880163 + (Notice of Enforcement Discretion (Noed) for Duke Energy Coprortaion Regarding Catawba, Unit 1)
- 05000327/FIN-2008004-01 + (Notice of Enforcement Discretion 08-2-001 For Both Control Room Air Conditioning System Trains Inoperable)
- ML092870014 + (Notice of Enforcement Discretion 09-3-002)
- ML110260461 + (Notice of Enforcement Discretion 11-2-001)
- 05000445/FIN-2013005-03 + (Notice of Enforcement Discretion 13-4-004 for a Loss of Both Required Offsite Power Circuits)
- 05000275/FIN-2014004-05 + (Notice of Enforcement Discretion 14-4-001 for a Loss of Both Required Offsite Power Circuits)
- 05000482/FIN-2014005-02 + (Notice of Enforcement Discretion 14-4-02 for Emergency Diesel Generator B Exciter Cabinet Fire)
- 05000446/FIN-2015003-03 + (Notice of Enforcement Discretion 15-4-02 for One Inoperable Train of Emergency Core Cooling Systems)
- 05000390/FIN-2016004-03 + (Notice of Enforcement Discretion 16-2-01 for Emergency Diesel Generator 1A-A Inoperable for Longer Than Allowed by Technical Specifications)
- L-2006-056, Notice of Enforcement Discretion Excessive Containment Purge Valve Leakage + (Notice of Enforcement Discretion Excessive Containment Purge Valve Leakage)
- ML11157A063 + (Notice of Enforcement Discretion Granted for Severe Weather)
- 05000414/FIN-2018002-03 + (Notice of Enforcement Discretion Granted from Technical Specifications Related to the Failure of the 2A EDG During Post-Maintenance Test)
- NL-12-1571, Notice of Enforcement Discretion Regarding Unforeseen Emergent Plant Condition, the Mechanical Failure of 1B Diesel Generator + (Notice of Enforcement Discretion Regarding Unforeseen Emergent Plant Condition, the Mechanical Failure of 1B Diesel Generator)
- ML110320066 + (Notice of Enforcement Discretion Request (Noed), Technical Specification (TS) Limiting Condition for Operation (LCO) 3.0.3)