(Opened) Emergency Diesel Generator 1A-A I(Opened) Emergency Diesel Generator 1A-A Inoperable for Longer Than Allowed by Technical Specifications and Notice of Enforcement Discretion 16-2-01 Introduction: The inspectors opened an unresolved item associated with a potential noncompliance with TS 3.8.1 that occurred on October 15, 2016. Notice of Enforcement Discretion 16-2-01 was granted by the NRC staff agreeing not to enforce compliance with the TS completion time for an additional 130 hours. Description: At 6:32 a.m. on October 12, 2016, Watts Bar operations staff declared the 1A-A EDG inoperable when the output breaker to the 1A shutdown board opened unexpectedly due to phase overcurrent during performance of the load test required by procedure 0-SI-82-13, 24 Hour Load Run - DG 1A-A. The 1A-A emergency diesel generator was operating normally prior to the opening of the breaker. The licensees initial assessment determined the likely cause of the breaker trip was operation of the tap changer associated with the offsite power supply transformer. A subsequent 24 hour EDG load test was started at 12:35 a.m. on October 13, 2016. At 6:45 p.m. on October 13, 2016, operations staff noted mega volt amps (reactive) swings. During subsequent troubleshooting activities, it was determined that the mega volt amps (reactive) variance could be consistently reproduced by slight movement of a potentiometer on the 1A-A EDG voltage regulator. The licensee determined that an issue in the voltage regulator circuit was the most likely cause of the output breaker trip, and made preparations to replace and calibrate the voltage regulator on which the potentiometer was located. The licensee determined that it would require more than 72 hours to complete the removal and replacement of the voltage regulator and post-maintenance testing. The licensee requested a notice of enforcement discretion and an additional 144 hours to restore EDG 1A-A. A notice of enforcement discretion for an additional 130 hours was granted by the NRC staff at 9:30 p.m. on October 14, 2016. Consistent with NRC policy, the NRC agreed not to enforce compliance with the specific TSs in this instance, but will further review the cause(s) that created the apparent need for enforcement discretion to determine if there is a performance deficiency, if the issue is more than minor, or if there is a violation of requirements. This issue will be tracked as an unresolved item. (URI 05000390, 391/2016004-03, Notice of Enforcement Discretion 16-2-01 for Emergency Diesel Generator 1A-A Inoperable for Longer Than Allowed by Technical Specifications) This activity constitutes completion of one event follow-up sample, as defined in IP 71153t follow-up sample, as defined in IP 71153  
23:59:59, 31 December 2016  +
00390  +, 05000390  +  and 05000391  +
23:59:59, 31 December 2016  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
0.0015 d (0.0361 hours, 2.149471e-4 weeks, 4.9465e-5 months)  +, 2.777778e-4 d (0.00667 hours, 3.968254e-5 weeks, 9.132e-6 months)  +, 8.333333e-4 d (0.02 hours, 1.190476e-4 weeks, 2.7396e-5 months)  +  and 0.00167 d (0.04 hours, 2.380952e-4 weeks, 5.4792e-5 months)  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:55:31, 21 February 2018  +
23:59:59, 31 December 2016  +
Notice of Enforcement Discretion 16-2-01 for Emergency Diesel Generator 1A-A Inoperable for Longer Than Allowed by Technical Specifications  +