MONTHYEARML24009A1152024-01-29029 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L 2023 LLE-0043 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML24022A0652024-01-22022 January 2024 Senior Reactor and Reactor Operator Initial License Examinations L-2024-003, NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2024-01-11011 January 2024 NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report ML23312A1822023-12-22022 December 2023 Issuance of Amendment No. 172 Revision to Cooling Tower Service Water Loop or Cell Requirements L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-180, Submittal of Changes to the Technical Specification Bases2023-12-13013 December 2023 Submittal of Changes to the Technical Specification Bases L-2023-177, Supplement to Seabrook Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Seabrook Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-160, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Final Rule ML23318A0772023-11-14014 November 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000443/2024011 IR 05000443/20234032023-11-0707 November 2023 Security Baseline Inspection Report 05000443/2023403 and Independent Spent Fuel Storage Installation 07200063/2023401 IR 05000443/20230032023-11-0606 November 2023 Integrated Inspection Report 05000443/2023003 IR 05000443/20230102023-10-19019 October 2023 Triennial Fire Protection Inspection Report 05000443/2023010 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23275A0522023-10-0202 October 2023 Requalification Program Inspection IR 05000443/20234012023-09-0808 September 2023 Cybersecurity Inspection Report 05000443/2023401 (Cover Letter Only) IR 05000443/20234202023-09-0505 September 2023 Security Baseline Inspection Report 05000443/2023420 IR 05000443/20230052023-08-31031 August 2023 Updated Inspection Plan for Seabrook Station (Report 05000443/2023005) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update IR 05000443/20233022023-08-16016 August 2023 Operator Licensing Retake Examination Report 05000443/2023302 IR 05000443/20230022023-08-0808 August 2023 Integrated Inspection Report 05000443/2023002 L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment L-2023-104, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-103, Inservice Inspection Examination Report2023-08-0303 August 2023 Inservice Inspection Examination Report ML23192A0782023-07-11011 July 2023 Operator Licensing Retake Examination Approval L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) SBK-L-23053, Radiological Emergency Plan (Ssrep), Revision 802023-06-22022 June 2023 Radiological Emergency Plan (Ssrep), Revision 80 ML23157A0722023-06-0606 June 2023 Notification of Conduct of a Fire Protection Team Inspection L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal IR 05000443/20233012023-05-15015 May 2023 Initial Operator Licensing Examination Report 05000443/2023301 L-2023-064, License Amendment Request 23-01, Revision 1, Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves2023-05-11011 May 2023 License Amendment Request 23-01, Revision 1, Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves IR 05000443/20230012023-05-11011 May 2023 Integrated Inspection Report 05000443/2023001 ML23129A0312023-05-0909 May 2023 Reactor Operator Retake License Examination ML23117A3652023-05-0404 May 2023 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request to Remove Period of Applicability from PTL and Low Temperature Over Pressure Protection Curves SBK-L-23044, 2022 Annual Radiological Environmental Operating Report2023-04-28028 April 2023 2022 Annual Radiological Environmental Operating Report SBK-L-23031, 2022 Annual Radioactive Effluent Release Report2023-04-28028 April 2023 2022 Annual Radioactive Effluent Release Report SBK-L-23033, 2022 Annual Environmental Operating Report2023-04-11011 April 2023 2022 Annual Environmental Operating Report L-2023-053, Core Operating Limits Report for Cycle 232023-04-0505 April 2023 Core Operating Limits Report for Cycle 23 ML23088A1522023-03-29029 March 2023 Summary of Meeting Between Nrc/Region I and C-10 - Questions Regarding Seabrook 4Q2022 Inspection Report L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications ML23073A1562023-03-23023 March 2023 Relief Request 4RA-22-01, Relief from the Requirements of the ASME Code L-2023-012, License Amendment Request 23-01, Remove Period of Applicability (Poa) from Pressure Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves2023-03-15015 March 2023 License Amendment Request 23-01, Remove Period of Applicability (Poa) from Pressure Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves L-2023-025, Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-12023-03-15015 March 2023 Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-1 L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2023-023, Revised Steam Generator Tube Inspection Report2023-03-0303 March 2023 Revised Steam Generator Tube Inspection Report ML23020A1002023-03-0303 March 2023 OEDO-22-00419 - 2.206 Petition for Seabrook Station Structure Concrete Concerns (EPID L-2022-CRS-0000)- Closure Letter 2024-01-29
[Table view] |
Text
September 28, 2021 EA-21-138 Mr. Robert Coffey Executive Vice President, Nuclear Division and Chief Nuclear Officer Florida Power & Light Company 700 Universe Blvd.
Mail Stop: EX/JB Juno Beach, FL 33408
SUBJECT:
NOTICE OF ENFORCEMENT DISCRETION (NOED) FOR SEABROOK STATION, UNIT NO. 1 (EPID: L-2021-LLA-0168)
Dear Mr. Coffey:
By letter (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21268A003) dated September 25, 2021, NextEra Energy Seabrook, LLC (NextEra, the licensee) requested the U.S. Nuclear Regulatory Commission (NRC) to exercise discretion to not enforce compliance with the actions required by Seabrook Station, Unit No. 1 (Seabrook),
Technical Specifications (TS) Limiting Condition for Operation (LCO) 3.7.4 - Service Water System/Ultimate Heat Sink.
This letter documents information previously discussed with the NRC in telephone conferences held on September 23, 2021, at 2:00 p.m. and 6:30 p.m. Eastern Standard Time (EST). The principal NRC staff members who participated in the telephone conferences are listed in the Enclosure. The NRC staff determined that the information contained in your letter requesting the NOED was consistent with your oral request.
The NRC first became aware of the potential for this NOED request on September 23, 2021, at approximately 6:00 a.m. EST through communication with the Seabrook Senior Resident Inspector. The licensee requested that an NOED be granted pursuant to the NRCs policy regarding exercise of discretion for an operating power reactor, set out in the NRC Enforcement Manual, Appendix F, Notices of Enforcement Discretion, and the NOED be effective for five days past the LCO 3.7.4, Action b expiration date of September 24, 2021 (i.e., until 4:56 a.m.
EST on Wednesday, September 29, 2021). This letter documents the event and our telephone conversation on September 23, 2021, when we orally granted this NOED request.
R. Coffey 2 On the morning of September 17, 2021, the Unit 1 B service water cooling tower fan experienced a failure while in service. At 4:56 a.m. EST, the licensee declared one cooling tower service water loop inoperable and entered TS LCO 3.7.4, Action b. Investigation found the fan driveshaft had sheared and the gearbox was leaking oil and both items were replaced.
During post-maintenance testing on Wednesday, September 22, the newly installed gearbox exhibited elevated vibrations. The licensee determined that the elevated vibrations on the newly installed gearbox were indications of an unsatisfactory gear mesh tolerance within the gearbox.
The licensee determined that the repair methods available to the station to correct the condition would exceed the TS LCO completion time and initiated the NOED process with the NRC.
During the teleconference held on September 23, 2021, the licensee requested enforcement discretion for the brief period of time that was required to process an emergency TS License Amendment Request (LAR) under the provisions of Title 10 of the Code of Federal Regulations (10 CFR) 50.91(a)(5). This TS LAR is expected to extend the TS LCO 3.7.4 Action b.
completion time to provide the necessary time to restore the service water cooling tower Unit 1 B fan to an operable status. Without this enforcement discretion, Unit 1 was required to be in MODE 3 by 10:56 a.m. EST on September 24, 2021, and Mode 5 by 4:56 p.m. EST on September 25, 2021. During internal NRC discussions, the Office of Nuclear Reactor Regulation, Division of Operating Reactor Licensing expressed confidence in completing the LAR review based on the straightforward nature of the change and the very low risk increase associated with the additional fan unavailability.
The licensee indicated that the calculated increase in Unit 1 incremental conditional core damage probability (ICCDP), using the zero-maintenance probability model, for the requested five day enforcement discretion period was 3.97E-9. The licensee also indicated that the increase in Unit 1 incremental conditional large early release probability (ICLERP) was 1.37E-12. These values were less than the 5E-7 ICCDP and 5E-8 ICLERP guidance thresholds specified in the NRC Enforcement Manual, Appendix F.
During the requested period of enforcement discretion, the licensee proposed to implement compensatory risk management measures to reduce the likelihood of risk significant initiating events and protect risk significant equipment and actions. These measures included but were not limited to:
- Protecting risk significant systems and areas;
- Restricting maintenance and surveillance activities;
- Monitoring weather and grid conditions; and
- Briefing operators on plant recovery procedures for a degraded ultimate heat sink The licensees Plant Health Committee (PORC) approved submission of the NOED request on September 23, 2021, prior to the verbal request for an NOED.
Based on the NRC staffs evaluation of the licensees request, the staff determined that granting this NOED was consistent with the NRCs Enforcement Policy and staff guidance. The NOED request met the criteria specified in Sections 2.2 and 2.5 of Appendix F, Notices of Enforcement Discretion, of the NRCs Enforcement Manual. Specifically, the NRC determined that it was appropriate to exercise discretion for the brief period of time required for the licensee and the NRC staff to process an emergency TS LAR under the provisions of 10 CFR 50.91(a)(5) and avoid an unnecessary shutdown of a reactor without a corresponding benefit to public health and safety or the environment. Therefore, as communicated orally to the
R. Coffey 3 licensee at approximately 7:30 p.m. EST on September 23, 2021, the NRC exercised discretion to not enforce compliance with TS LCO 3.7.4, Action b. for a period of five days, which would require a shutdown by 10:56 a.m. EST on September 24, 2021.
In accordance with the granted NOED, NextEra submitted the emergent TS LAR on September 25 (ADAMS Accession No. ML21268A004) to modify TS 3.7.4 Action b by extending the completion time on a one-time basis for a Service Water system cooling water cell from seven to 16 days to allow entry into Mode 5 during a planned refueling outage, which is scheduled to begin early October 2021. The NRC staff noted, subsequent to its verbal approval for enforcement discretion, that the condition causing the need for this NOED was corrected and Seabrook exited from TS LCO 3.7.4 at 4:47 a.m. EST on September 26, 2021. As a result, this NOED terminated at 4:47 a.m. EST on September 26, 2021, within the period of the enforcement discretion.
As stated in the NRC Enforcement Policy, enforcement action may be taken to the extent that violations were involved for the root cause that led to the noncompliance for which this NOED was necessary.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely, Digitally signed by Daniel Daniel S. S. Collins Date: 2021.09.28 Collins 15:14:54 -04'00' Daniel S. Collins, Director Division of Operating Reactor Safety Docket No. 05000443 License No. NPF-86
Enclosures:
- 1. List of Key NRC Personnel
- 2. Seabrook Station Notice of Enforcement Request cc w/ encl: Distribution via LISTSERV
ML21271A100 X Non-Sensitive X Publicly Available X SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DORS RI/DORS NAME BBickett EMiller CCarusone DCollins DATE 9/28 /21 9/28/21 9/28/21 9/28/21 LIST OF KEY NRC PERSONNEL NRC REGION I R. Felts, Director, Division of Operating Reactor Safety (DORS)
P. Krohn, Deputy Director, DORS B. Bickett, Branch Chief, DORS, Projects Branch 3 C. Newport, Seabrook Senior Resident Inspector, DORS, Projects Branch 3 F. Arner, Senior Reactor Analyst, DORS D. Werkheiser, Senior Reactor Analyst, DORS W. Cook, Senior Reactor Analyst, DORS Office of Nuclear Reactor Regulation C. Carusone, Deputy Director, Division of Operating Reactor Licensing (DORL)
J. Danna, Branch Chief, DORL, Plant Licensing Branch I J. Poole, Project Manager, DORL, Plant Licensing Branch I E. Miller, Senior Project Manager, DORL, Plant Licensing Branch II-1 M. Montecalvo, Senior Reactor Analyst, Division of Risk Assessment, PRA Licensing Oversight Branch B. Wittick, Branch Chief, Division of Safety Systems, Containment and Plant Systems Branch R. Vettori, Fire Protection Engineer, Division of Risk Assessment, PRA Licensing Branch B B. Lee, Safety and Plant Systems Engineer, Division of Safety Systems, Containment and Plant Systems Branch Enclosure 1