Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Interim Rept on Protective Coatings". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • W3P84-2581, Interim Rept of Significant Const Deficiency 61 Re Linear Crack in Stainless Steel Tubing.Issue Reopened Pending Completion of Issues Identified in DG Eisenhut . Next Rept Expected by 841005  + (Interim Rept of Significant Const Deficiency 61 Re Linear Crack in Stainless Steel Tubing.Issue Reopened Pending Completion of Issues Identified in DG Eisenhut . Next Rept Expected by 841005)
  • W3P84-2647, Interim Rept of Significant Deficiency 78 Re American Bridge Structural Steel Deficiencies.Corrective Action & Documentation Reviews Continuing.Final Rept Expected by 841030  + (Interim Rept of Significant Deficiency 78 Re American Bridge Structural Steel Deficiencies.Corrective Action & Documentation Reviews Continuing.Final Rept Expected by 841030)
  • ML20064D247  + (Interim Rept of Significant Deficiency 9 Re Noncompliance W/ Weld Requirements for HVAC Seismic Support Hangers to Embedded Plates & Lack of Preheating)
  • ML20064G714  + (Interim Rept of Significant Deficiency 9 Defective Emergency Diesel Generator Roller Pin Describing Abnormal Wear on Surface of Roller Pin Valve Crosshead in Some Pwr Cylinder Subassemblies)
  • ML20009G163  + (Interim Rept of Significant Deficiency SD-413/81-10, Initially Reported on 810615.Due to Complexities of Training & Number of People Involved,Corrective Actions 4 & 5 Will Be Completed by 810814)
  • ML20024A992  + (Interim Rept of TMI-2 Occurrence,Technical Review Committee)
  • ML20024A991  + (Interim Rept of TMI-2 Occurrence,Technical Review Committee)
  • ML20126B475  + (Interim Rept of Third Party Review of Tmi,Unit 1,Steam Generator Repair)
  • ML20083L842  + (Interim Rept of Third-Party Review of Tmi,Unit 1,Steam Generator Repair)
  • ML20128M859  + (Interim Rept on Accident Sequence Likelihood Reassessment (Accident Sequence Evaluation Program))
  • ML20247K998  + (Interim Rept on Confirmatory Survey of Portions of Sequoyah Fuels Corp Cimarron Plant Crescent,Ok)
  • ML19289C645  + (Interim Rept on Discrepancies Found in Inboard Terminal Box Electrical Penetration Assemblies.Recommends Determining If There Was Breakdown in Vendor QC Program.Another Rept Will Be Transmitted on or Before 790131.Related Correspondence)
  • ML20205P163  + (Interim Rept on Fallout Situation in Finland from 860426- 0504)
  • ML19210B371  + (Interim Rept on Fuel Densification for Met Ed TMI-1)
  • ML20054L623  + (Interim Rept on Involvement of Science Applications,Inc & NUS as NRC Contractors & Possible Conflicts of Interest as Applicant Contractors.Investigation Continuing.Certificate of Svc Encl)
  • ML20235L162  + (Interim Rept on McGuire Reactor Trip Breaker 2B Failure Evaluation & Recommended Corrective Actions from Westinghouse)
  • ML20091E302  + (Interim Rept on ORNL Assistance in Evaluating Licensing Request - Amend of Fort St Vrain Reactor Tech Spec Limiting Condition for Operation 4.1.9)
  • ML15239A093  + (Interim Rept on Oconee Emergency Electrical Power Sys & Other Related Matters)
  • ML20100M126  + (Interim Rept on Palo Verde Nuclear Generating Station Reactor Coolant Pumps)
  • ML20082D004  + (Interim Rept on Potential Deficiency 55-82-11 Re Incorrect Identification of Base Matl & Improper Weld Procedures on Pipe Hanger Travelers.Initially Reported on 821020.Final Rept Will Be Submitted within 90 Days)
  • ML20076A818  + (Interim Rept on Potential Deficiency 55-82-11 Re Incorrect Identification of Base Matl & Weld Procedures on Pipe Hanger Travelers.Initially Reported on 821020.Travelers Will Identify Correct or Alternate Base Matls)
  • ML19263C084  + (Interim Rept on Potential Deficiency in Design & Const of Westinghouse AR-40 Relay Installed in Facility Solid State Protection Sys)
  • ML20030C505  + (Interim Rept on Potential Reportable Deficiency Re Pipe Hanger Stiff Clamps,Initially Reported on 810611.Significant Tie Rod Bending on Stiff Clamp Assembly Noticed When Installed Per Instructions.Final Rept by 811001)
  • ML19274E706  + (Interim Rept on Potential Reportable Deficiency Re Failed Type 12 Auxiliary Switch Assembly.Failed Switch Assembly & One Other Assembly W/Crack in End Moulding Were Returned to Supplier for Analysis.Will Submit Final Rept by 790530)
  • ML19347E084  + (Interim Rept on Potential Substantial Safety Hazard or Potential Signinficant Deficiency Re Corroded Plug Assemblies Associated W/Solenoid Valves.Metallurgist Will Identify Cause & Corrective Action.Final Rept in 2 Months)
  • ML19199A366  + (Interim Rept on Recent Accident at Tmi.Finds Operator Has Difficulty in Understanding & Properly Controlling Course of Small Break Accident.Provides Technical Recommendations)
  • ML20062C525  + (Interim Rept on Reportable Deficiency Re Dimensional Error in Base Slab of mech-elec Auxiliary Bldg.Necessary Safety Eval Will Be Completed in About 6 Months & at That Time a Final Rept Will Be Submitted)
  • ML19225A191  + (Interim Rept on Results of ATWS Vertification Analyses)
  • ML20204D160  + (Interim Rept on SER Review Re Fire Protection Program Covering Review of Fire Prevention,Detection & Suppression Capabilities.Present Program Gives Reasonable Assurance That Public Health & Safety Is Not Endangered)
  • ML20204D162  + (Interim Rept on SER Review Re Fire Protection Program. Inadequately Covered Items:Lube Oil Fire in Turbine Bldg, Control Valves Subj to Human Failure,Effect of Seismic Damage,Smoke Removal by Ducts & Wiring in Signaling Sys)
  • ML20076C154  + (Interim Rept on Significant Const Deficiency 55 Re Incorrect Structural Calculations for Holdup & Boric Acid Makeup Tanks.Initially Reported on 830623.Final Rept Will Be Submitted by 830907)
  • ML20072T746  + (Interim Rept on Significant Const Deficiency 64 Re Safety Injection Tank Discharge Flow Rates.Ebasco Engineering Reviewing Plant Safety Analyses Performed by C-E.Final Rept Will Be Delayed Until 830427)
  • ML19289F201  + (Interim Rept on Significant Deficiency 79-01,Stop Work Directive for Bingham-Willamette Co)
  • ML20082E370  + (Interim Rept on Significant Deficiency 85 Re Possible Operational Defect in Reactor Water Cleanup Sys Isolation Valve Control Circuit.Evaluation of Reportability Continuing.Determination Rept Expected by 840103)
  • ML19261B448  + (Interim Rept on Significant Deficiency:S&M Constructors, Inc QA Program Breakdown Regarding Control of S&M Subcontractor,Halvorsen Boiler & Engineering Co)
  • ML19261E182  + (Interim Rept on Status of Component Qualification Test Documentation re-review.Initial Reviews Indicate Discrepancies May Exist Similar to Those Found in Procurements Made by Bechtel.Addl Info Will Be Submitted)
  • ML19305A130  + (Interim Rept on Structural Steel Design Deficiency.Interior Structural Steel Beams Design by Brown & Root Fails to Consider Certain Postulated Loads.Only 1 Case Requires Addl Structural Members)
  • ML19246A397  + (Interim Rept on TMI-2 Accident)
  • ML19274D232  + (Interim Rept on Trip to Observe & Discuss Japans gas-cooled Reactor Experimental Facilities for Very High Temp Reactor Development for Steel Mfg.Describes Itinerary of U.S.-Japan Seminar on HTGR Safety Technology)
  • ML20082H973  + (Interim Rept on Water Seepage at Station 58 of Wolf Creek Generating Station Main Dam. W/One Oversize Figure. Aperture Card Is Available in PDR)
  • ML19296B958  + (Interim Rept to Congress on Feasibility of Conducting Epidemiologic Research on Health Effects of Low Level Ionizing Radiation)
  • ML20084K350  + (Interim Rept, Containment Dome Concrete Investigation)
  • ML19341A968  + (Interim Rept, Investigation of Fuel Rod Failures in CT Yankee Reactor)
  • ML20126H801  + (Interim Rept, Subcooled Flow Boiling Model Assessment & Development)
  • ML20038A678  + (Interim Rept,Der 80-42,Revision 1 Re Tx Bolt Matl Not Meeting ASME Section 3,initially Reported 810109.TX Bolt Co Suspended from Bechtel Corp Evaluated Suppliers List for Supplying Improperly Sized Matl.Final Rept Due 820130)
  • ML18030A130  + (Interim Rept,Per 10CFR50.55(e) & Part 21,re Premature Time Out & Drifting Set Points for Pneumatic Time Delay Relays Associated W/Agastat 7000 & GE CR 2820 Relays.Bechtel & Util Analyzing Safety Impact)
  • ML20032A074  + (Interim Rept,Results of Detailed Geologic Excavation Mapping)
  • ML20148A668  + (Interim Rept.In Nov 1978,personnel Identified Embed Assemblies Not Fabricated or Installed IAW Design Drawing. Reeval of Affected Assemblies Is in Progress)
  • ML20147H625  + (Interim Rept:Dev of the Mod 7 CHF Correlation Using a Regression Analysis of the Applicable Steady State Critical Heat Flux Data)
  • ML19289C007  + (Interim Rept:Quarterly Progress Rept Covering Period 780401 Thru 780630 - for Study of PuO2 Leak Rates from Shipping Containers.Provides Interim Info on Tasks in Progress)