Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- W3P84-2581, Interim Rept of Significant Const Deficiency 61 Re Linear Crack in Stainless Steel Tubing.Issue Reopened Pending Completion of Issues Identified in DG Eisenhut . Next Rept Expected by 841005 + (Interim Rept of Significant Const Deficiency 61 Re Linear Crack in Stainless Steel Tubing.Issue Reopened Pending Completion of Issues Identified in DG Eisenhut . Next Rept Expected by 841005)
- W3P84-2647, Interim Rept of Significant Deficiency 78 Re American Bridge Structural Steel Deficiencies.Corrective Action & Documentation Reviews Continuing.Final Rept Expected by 841030 + (Interim Rept of Significant Deficiency 78 Re American Bridge Structural Steel Deficiencies.Corrective Action & Documentation Reviews Continuing.Final Rept Expected by 841030)
- ML20064D247 + (Interim Rept of Significant Deficiency 9 Re Noncompliance W/ Weld Requirements for HVAC Seismic Support Hangers to Embedded Plates & Lack of Preheating)
- ML20064G714 + (Interim Rept of Significant Deficiency 9 Defective Emergency Diesel Generator Roller Pin Describing Abnormal Wear on Surface of Roller Pin Valve Crosshead in Some Pwr Cylinder Subassemblies)
- ML20009G163 + (Interim Rept of Significant Deficiency SD-413/81-10, Initially Reported on 810615.Due to Complexities of Training & Number of People Involved,Corrective Actions 4 & 5 Will Be Completed by 810814)
- ML20024A992 + (Interim Rept of TMI-2 Occurrence,Technical Review Committee)
- ML20024A991 + (Interim Rept of TMI-2 Occurrence,Technical Review Committee)
- ML20126B475 + (Interim Rept of Third Party Review of Tmi,Unit 1,Steam Generator Repair)
- ML20083L842 + (Interim Rept of Third-Party Review of Tmi,Unit 1,Steam Generator Repair)
- ML20128M859 + (Interim Rept on Accident Sequence Likelihood Reassessment (Accident Sequence Evaluation Program))
- ML20247K998 + (Interim Rept on Confirmatory Survey of Portions of Sequoyah Fuels Corp Cimarron Plant Crescent,Ok)
- ML19289C645 + (Interim Rept on Discrepancies Found in Inboard Terminal Box Electrical Penetration Assemblies.Recommends Determining If There Was Breakdown in Vendor QC Program.Another Rept Will Be Transmitted on or Before 790131.Related Correspondence)
- ML20205P163 + (Interim Rept on Fallout Situation in Finland from 860426- 0504)
- ML19210B371 + (Interim Rept on Fuel Densification for Met Ed TMI-1)
- ML20054L623 + (Interim Rept on Involvement of Science Applications,Inc & NUS as NRC Contractors & Possible Conflicts of Interest as Applicant Contractors.Investigation Continuing.Certificate of Svc Encl)
- ML20235L162 + (Interim Rept on McGuire Reactor Trip Breaker 2B Failure Evaluation & Recommended Corrective Actions from Westinghouse)
- ML20091E302 + (Interim Rept on ORNL Assistance in Evaluating Licensing Request - Amend of Fort St Vrain Reactor Tech Spec Limiting Condition for Operation 4.1.9)
- ML15239A093 + (Interim Rept on Oconee Emergency Electrical Power Sys & Other Related Matters)
- ML20100M126 + (Interim Rept on Palo Verde Nuclear Generating Station Reactor Coolant Pumps)
- ML20082D004 + (Interim Rept on Potential Deficiency 55-82-11 Re Incorrect Identification of Base Matl & Improper Weld Procedures on Pipe Hanger Travelers.Initially Reported on 821020.Final Rept Will Be Submitted within 90 Days)
- ML20076A818 + (Interim Rept on Potential Deficiency 55-82-11 Re Incorrect Identification of Base Matl & Weld Procedures on Pipe Hanger Travelers.Initially Reported on 821020.Travelers Will Identify Correct or Alternate Base Matls)
- ML19263C084 + (Interim Rept on Potential Deficiency in Design & Const of Westinghouse AR-40 Relay Installed in Facility Solid State Protection Sys)
- ML20030C505 + (Interim Rept on Potential Reportable Deficiency Re Pipe Hanger Stiff Clamps,Initially Reported on 810611.Significant Tie Rod Bending on Stiff Clamp Assembly Noticed When Installed Per Instructions.Final Rept by 811001)
- ML19274E706 + (Interim Rept on Potential Reportable Deficiency Re Failed Type 12 Auxiliary Switch Assembly.Failed Switch Assembly & One Other Assembly W/Crack in End Moulding Were Returned to Supplier for Analysis.Will Submit Final Rept by 790530)
- ML19347E084 + (Interim Rept on Potential Substantial Safety Hazard or Potential Signinficant Deficiency Re Corroded Plug Assemblies Associated W/Solenoid Valves.Metallurgist Will Identify Cause & Corrective Action.Final Rept in 2 Months)
- ML20091B588 + (Interim Rept on Protective Coatings)
- ML19199A366 + (Interim Rept on Recent Accident at Tmi.Finds Operator Has Difficulty in Understanding & Properly Controlling Course of Small Break Accident.Provides Technical Recommendations)
- ML20062C525 + (Interim Rept on Reportable Deficiency Re Dimensional Error in Base Slab of mech-elec Auxiliary Bldg.Necessary Safety Eval Will Be Completed in About 6 Months & at That Time a Final Rept Will Be Submitted)
- ML19225A191 + (Interim Rept on Results of ATWS Vertification Analyses)
- ML20204D160 + (Interim Rept on SER Review Re Fire Protection Program Covering Review of Fire Prevention,Detection & Suppression Capabilities.Present Program Gives Reasonable Assurance That Public Health & Safety Is Not Endangered)
- ML20204D162 + (Interim Rept on SER Review Re Fire Protection Program. Inadequately Covered Items:Lube Oil Fire in Turbine Bldg, Control Valves Subj to Human Failure,Effect of Seismic Damage,Smoke Removal by Ducts & Wiring in Signaling Sys)
- ML20076C154 + (Interim Rept on Significant Const Deficiency 55 Re Incorrect Structural Calculations for Holdup & Boric Acid Makeup Tanks.Initially Reported on 830623.Final Rept Will Be Submitted by 830907)
- ML20072T746 + (Interim Rept on Significant Const Deficiency 64 Re Safety Injection Tank Discharge Flow Rates.Ebasco Engineering Reviewing Plant Safety Analyses Performed by C-E.Final Rept Will Be Delayed Until 830427)
- ML19289F201 + (Interim Rept on Significant Deficiency 79-01,Stop Work Directive for Bingham-Willamette Co)
- ML20082E370 + (Interim Rept on Significant Deficiency 85 Re Possible Operational Defect in Reactor Water Cleanup Sys Isolation Valve Control Circuit.Evaluation of Reportability Continuing.Determination Rept Expected by 840103)
- ML19261B448 + (Interim Rept on Significant Deficiency:S&M Constructors, Inc QA Program Breakdown Regarding Control of S&M Subcontractor,Halvorsen Boiler & Engineering Co)
- ML19261E182 + (Interim Rept on Status of Component Qualification Test Documentation re-review.Initial Reviews Indicate Discrepancies May Exist Similar to Those Found in Procurements Made by Bechtel.Addl Info Will Be Submitted)
- ML19305A130 + (Interim Rept on Structural Steel Design Deficiency.Interior Structural Steel Beams Design by Brown & Root Fails to Consider Certain Postulated Loads.Only 1 Case Requires Addl Structural Members)
- ML19246A397 + (Interim Rept on TMI-2 Accident)
- ML19274D232 + (Interim Rept on Trip to Observe & Discuss Japans gas-cooled Reactor Experimental Facilities for Very High Temp Reactor Development for Steel Mfg.Describes Itinerary of U.S.-Japan Seminar on HTGR Safety Technology)
- ML20082H973 + (Interim Rept on Water Seepage at Station 58 of Wolf Creek Generating Station Main Dam. W/One Oversize Figure. Aperture Card Is Available in PDR)
- ML19296B958 + (Interim Rept to Congress on Feasibility of Conducting Epidemiologic Research on Health Effects of Low Level Ionizing Radiation)
- ML20084K350 + (Interim Rept, Containment Dome Concrete Investigation)
- ML19341A968 + (Interim Rept, Investigation of Fuel Rod Failures in CT Yankee Reactor)
- ML20126H801 + (Interim Rept, Subcooled Flow Boiling Model Assessment & Development)
- ML20038A678 + (Interim Rept,Der 80-42,Revision 1 Re Tx Bolt Matl Not Meeting ASME Section 3,initially Reported 810109.TX Bolt Co Suspended from Bechtel Corp Evaluated Suppliers List for Supplying Improperly Sized Matl.Final Rept Due 820130)
- ML18030A130 + (Interim Rept,Per 10CFR50.55(e) & Part 21,re Premature Time Out & Drifting Set Points for Pneumatic Time Delay Relays Associated W/Agastat 7000 & GE CR 2820 Relays.Bechtel & Util Analyzing Safety Impact)
- ML20032A074 + (Interim Rept,Results of Detailed Geologic Excavation Mapping)
- ML20148A668 + (Interim Rept.In Nov 1978,personnel Identified Embed Assemblies Not Fabricated or Installed IAW Design Drawing. Reeval of Affected Assemblies Is in Progress)
- ML20147H625 + (Interim Rept:Dev of the Mod 7 CHF Correlation Using a Regression Analysis of the Applicable Steady State Critical Heat Flux Data)
- ML19289C007 + (Interim Rept:Quarterly Progress Rept Covering Period 780401 Thru 780630 - for Study of PuO2 Leak Rates from Shipping Containers.Provides Interim Info on Tasks in Progress)