REGULATORY FORMATION DISTRIBUTI004 SY M (RIDS)
ACCESSION NBR:8007180434 DOCRDATE: 80/07/11 NOTARIZED:
NO FAG IL Susaus hanna Steam Electric Stationi Unit li Pennsylva 50 388 squehanna Steam Electric Stationi Unit 2i Pennsylva A
T
~,
AUTHOR AFFILIATION C RTIS,IV ~ W ~
Pennsylvania Poser 8 Light Co ~
REC IP NAME REC1P IENT AFFILIATION
~~li DOCKET 05000387 05000388
SUBJECT:
Interim rept'er 10CFR50.55(e) 8 Part 21Pr e pr ematur e time out 8, drifting set points for pneumatic time delay relays associated w/Agastat 7000 8
GE CR 2820 relays,Bechtel util analyzing safety
- impact, OISTRISUTION COOS:
SOI90 COPIES RECEIVES:LTR g ENCL Q SIZE:
TI TI.E: Construction Oe f i c i ency Report
( 10CFR50
~ 55E)
NOTES:Send I8E 3 copies FSAR 8 all amends'5000387 05000388 ACTION:
REC IP IEN T ID CODE/NAME A/D LICENSNG 21 RUSHBROOKPM, 20 STARKgR ~
14 COPIES LTTR ENCL 1
1 1
1 RECIPIENT ID CODE/NAME YOUtIIGBLOOOiB 15 SERV ICED IUI ~
20 COP IES LTTR ENCI.
1 1
IN TERN AL:
AO/RCI/IE 0/DIR HUM FAC S
EDO 4
STAFF 07 F IELO COOR/I E13 LIC QUAL BR NRC PDR 02 PR REV BR G
F IL 01
~
RDS DEV 11 1
1 1
1 1
1 1
1 1
1 1
1 1
1 AEOO DIRPHUM FAC SFY EQUIP QUaL BR16 IKE 05 i4IP A 08 OELO 23 QA BR 10 RUTHERFORD i 00 0 IE 1
1 1
1 1
1 2
2 1
1 1
1 1
1 1
1 EXTERNAL; ACRS NSIC 24 04 16 ie 1
1 LPOR JVL P > )q80 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 41 ENCL 41
P Pal TWO NORTH NINTH STREET, ALLENTOWN, PA.
18101 PHONER t215) 821-5151 NORMAN W. CURTIS Vice President-Engineedng 8 Construction-Nuclear 821-5381 July 11, 19 80 Mr. Boyce H. Grier Director, Region I U.
S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 SUSQUEHANNA STEAM ELECTRIC STATION INTERIM REPORT OF A DEFICIENCY ON AGASTAT AND GENKM, ELECTRIC TIMING RELAYS ERs 100450/100508 FILE 840-4/900-10 PLA-508
Dear Mr. Grier:
This letter serves to confirm information provided by telephone to NRC Inspector Mr. R. Gallo by Mr. A. R.
Sabol of PP&L on April 28, 1980.
During that conversation, Mr. Gallo was advised that the subject condition was under evaluation for reportability under the provisions of 10CFR50.55(e).
The deficiency involves premature time out and driftfag set points for penumatic tMe delay relays.
PP&L and Bechtel are studying the deficiencies associated with both Agastat 7000 series and General Electric CR 2820 relays.
l These 'relays are used in saf ety related systems and hence their improper operation could affect the saf e operation of the nuclear power plant.
Therefore, the deficiency has been determined to be reportable under the provisions of 10CmSO. SS (e)
Becht el and PP&L are in the process of analyzing the safety 'pact of the deficiency and are formulating a corrective action plan.
Bechtel has issued MCAR 1-54 to document the deficiency and effect correction.
Since the details of this report provide information relevant to the reporting requirements of 10CFR21, this correspondence is considered to also discharge any formal responsibility PP &L may have for report ing in comp 1iance thereto.
We will advise the Commission of a date by which a final report will be made available.
0 q)o S00IT380 I5~
P.NNEYLYANIA POWER P
LIGHT COMPANY
Mr. Boyce H. Grier July 11, 1980 Very truly yours, N.
W. Curtis Vice president Eng-dneering S Ccnstructicn-guclesr FLW/ARS:mcb cc:
Mr. Victor Stello (15)
DirectorWffice of Inspection
& Enforcement U.
S, Nuclear Regulatory Commission Washington, D.C.
20555 Mr. G. McDonald, Director Office of Management Xnformation
& Program Control U.
S. Nuclear Regulatory Commission Washington, D.C.
20555 Mr. Robert M. Gallo U.
S. Nuclear Regulatory Commission P. 0.
Box 52 Shickshinny, Pennsylvania 18655