ML19274E706
| ML19274E706 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 04/02/1979 |
| From: | Mcgaughy J MISSISSIPPI POWER & LIGHT CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| AECM-79-29, NUDOCS 7904170199 | |
| Download: ML19274E706 (1) | |
Text
r=5d MISSISSIPPI POWER & LIGHT COMPANY m
4.
7 k
i
~
4 L
u Helpin <j B uild Missis sipps JN 3 P. O. B O X 16 4 0, JdCKSON, MISSISSIPPI 39205 PRODUCTION D L P A H F tA L N T April 2, 1979 Office of Inspection & Enforcement U. S. Nuclear -Regulatory Co:=11ssion Region II 101 Marietta Street - Suite 3100 Atlanta, Georgia 30303 ATTENT10:::
Mr. J.
P.
O'Reilly, Director SUl3J ECT : Grand Gulf Nuclear 'tation S
, File 0260/15525/15526 Interim Report ';o. I for Potential Reportable De-ficiency No. 79/06 as Defined in 10CFR50.55(e)
AECM-79/29 on March 2, 1979, Mississippi Power & I.ight Company notified a
Mr. J. K.
Rausch of your office of a potential reportable deficiency at the Grand Gulf Nuclear Station construction site concerning the failure o f a Type I.2 Auxiilary Switch Assembly installed in the 4. 16
'V switch-y,ca r. Other switch assemblies of the same type installed equipment and sparen from stock were found to have cracked "end mouldings".
The f a iled swit ch assembly and one of the switch assemblies v'th a crack in the end moulding were returned to the equipment supplier for analysis.
The results of the analysis should enable us to make a final determination of reportability and submit a final report by May 30, 1979.
Yourn truly, c /
- l h( " v L
,~ f
[# J.
P. McGaughy, Jr.
Director of Power Production JRF:pa ec:
Mr. ".
I..
Stampley Mr.
R.
11. McGehee Mr. T.
13. Conner t.
Dr. Ernst Vo l f;ena u, Director
~ ^,
s.
Division of Inspection 6 Enforcement U. S. Nuclear Regulatory Commission
@0 m
b'ashington, D. C.
20555 y hVt I
7904170/1'/
Member Middle South Utilities System