Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19016A333 + (Instructions for AU 400 600 TE for Use by Applicants January 11, 2019)
- ML19016A331 + (Instructions for Anp T&E for Use by Applicants January 11, 2019)
- ML20204A280 + (Instructions for Calculation of Offsite Dose from Limiting Primary Sys Break Which Does Not Isolate Primary Containment Vent & Purge Valves)
- ML20002E400 + (Instructions for Completing Material Balance Report, Physical Inventory Listing & Concise Note Forms (Forms Doe/ NRC-742,742C & 740M))
- ML20149A914 + (Instructions for Completing Material Balance Report and Physical Inventory Listing (Forms DOE/NRC-742 and 742C))
- ML20151Z053 + (Instructions for Completing NRCs Uniform LOW-LEVEL Radioactive Waste Manifest)
- ML20083N434 + (Instructions for Completing NRCs Uniform LOW-LEVEL Radioactive Waste Manifest)
- ML20134E268 + (Instructions for Completing NRCs Uniform LOW-LEVEL Radioactive Waste Manifest)
- ML20149A937 + (Instructions for Completing Nuclear Material Transaction Reports and Concise Note Forms (Forms DOE/NRC-741,741A and 740M).Rept Undated)
- ML19341A987 + (Instructions for Completing Nuclear Material Transaction Reports.Forms DOE/NRC-741,741A & 740M)
- ML20073S500 + (Instructions for Completing Nuclear Material Transaction Reports.Forms DOE/NRC-741,741A and 740M)
- ML20073S493 + (Instructions for Completing Nuclear Material Transaction Reports.Forms DOE/NRC-741,741A and 740M)
- ML17338A700 + (Instructions for Insp & Tests of Lockout Relays)
- ML20074A265 + (Instructions for Inspecting,Adjusting &/Or Replacement of Parts for Obtaining Limit Switch Adjustments on Brown Boveri 7.5 Kv Through 15 kV,500 Through 750 MVA;5HK350,3000; All Hkv Breakers)
- ML20090A002 + (Instructions for Joining Skype Meeting-Framatome Inc)
- ML19254A947 + (Instructions for Operating & Repairing Consolidated Electromatic Relief Valve. B&W Instruction Book 620-0006)
- ML20062H320 + (Instructions for Preparation of Data Entry Sheets for LER File)
- ML20092L298 + (Instructions for Preparing Security Plans for Local Area Networks in Compliance with OMB Bulletin No. 90-08)
- ML19016A334 + (Instructions for RSO and ARSO T&E for Use by Applicants January 11, 2019)
- ML19016A042 + (Instructions for T&E for Final Rule; Instructions for RSO, ARSO, AMP and Opthalmic Physicists)
- ML20214C033 + (Instructions for Using Part 111131-0001 Wipe Test Kits for Ni-63 Detectors)
- ML23165A069 + (Instructions on How to Navigate Pay.Gov to Make Payments)
- 10 CFR 50 Appendix B Criterion V, Instructions, Procedures, and Drawings + (Instructions, Procedures, and Drawings)
- ML20094P659 + (Instructor Lesson Plan:Simulator Training for Senior Reactor Operators Operating Practices Training,Accident Analysis/Assessment Training)
- ML20094P669 + (Instructor Lesson Plan:Simulator Training for Reactor Operators)
- ML20041B066 + (Instructor Requalification)
- ML20195G329 + (Instructs B Warnick to Identify Status of Cprrg Recommendation 69 as Complete)
- ML18094B122 + (Instructs Util to Implement Procedures to Reduce Mortality of Impinged Marine Turtles.Util Should Also Statistically Study Turtle Impingement Correlation W/Factors Which May Help Predict When Impingement Most Likely)
- ML14135A284 + (Instrument & Test Procedure S01-II-1.74, Auxiliary Feedwater Sys,Refueling Interval)
- ML20039A244 + (Instrument & Test Procedure S01-II-1.76, Auxiliary Feedwater Sys (Surveillance). Procedure Change Notice Encl)
- ML20262C308 + (Instrument AC Power (Non Class IE Power System))
- ML20262A322 + (Instrument AC Power Non Class 1E Pwr System)
- ML20262C270 + (Instrument AC Power System - 115V Class IE Power System)
- ML20260D666 + (Instrument Aair to Yard Isolation Valve Logic Diagram System:Ia. Actual Drawing NUMBER:9Q-11-9-Z-40018 1)
- ML20042F255 + (Instrument Accuracy Calculation 1LT-63-176,-177,-178 & -179 (RB Sump Switch))
- ML20042F253 + (Instrument Accuracy Calculation 1LT-63-50,-51,-52 & -53 (RWST Switchover))
- 05000289/FIN-2009002-01 + (Instrument Accuracy Not Verified prior to Performing Containment Penetration Local Leak Rate Testing)
- ML20266C198 + (Instrument Air & Alternate N2 Supply System Inboard MSIV Supply Sheet 1)
- ML20266C203 + (Instrument Air & Alternate N2 Supply System Inboard MSIV Supply Sheet 2)
- ML20265A621 + (Instrument Air & Station Service Air.Sheet 2 of 3)
- ML20265A626 + (Instrument Air & Station Service Air.Sheet 3 of 3)
- 05000286/FIN-2009007-02 + (Instrument Air 10 CFR 50.65(a)(2) Performance Demonstration Not Met)
- ML20261J242 + (Instrument Air B21 Accumulator Isolation Valve F646. Sheet 11)
- ML20260D655 + (Instrument Air Compressors Logic Diagram System:Ia. Actual Drawing NUMBER:6Q-11-9-Z-40014 1)
- ML20264D397 + (Instrument Air Containment (Iac) Reactor Containment El 717 Ft. No Rev Date)
- ML20260D642 + (Instrument Air Containment Isolation Valve Logic Diagram SYSTEM:1A. Actual Drawing NUMBER:5Z-11-9-Z-40012 1)
- ML20261K207 + (Instrument Air Containment Isolation Valve Logic Diagram System:1A)
- ML20261J438 + (Instrument Air Distribution System P&I Flow Diagram. Sheet 3 of 5.No Revision Date)
- ML20261J442 + (Instrument Air Distribution System P&I Flow Diagram. Sheet 4 of 5.No Revision Date)
- ML20261J428 + (Instrument Air Distribution System P&I Flow Diagram. Sheet 1 of 5.No Revision Date)
- ML20261J433 + (Instrument Air Distribution System P&I Flow Diagram. Sheet 2 of 5.No Revision Date)