Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "IR-00-001 Peachbottom Unit 1". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20034E491  + (IR 89-23 Some Follow Up)
  • ML103620633  + (IR 99990001-10-004, on 11/22/10, QSA Global, Inc., Burlington, Ma; Cover Letter Dtd December 22, 2010)
  • IR 05000334/2002301  + (IR Beaver Valley Unit 1 Reactor Operator & Senior Reactor Operator Initial Examination Report No. 50-334/02-301)
  • IR 05000318/2004301  + (IR Calvert Cliffs, Units 1 & 2, Operator and Senior Reactor Operator Initial Examination Report No. 05/000317/2004301 and 05000318/2004301)
  • ML063040661  + (IR Dresden 2006-010 Attachment 3)
  • IR 05000293/2002301  + (IR Exam Report 50-293/02-301; July 26 - August 2, 2002; Pilgrim Nuclear Power Station; Initial Operator Licensing Examination Report. Seven of Seven Applicants (3 ROs and 4 SRO Instants) Passed the Examination)
  • IR 05000286/2004301  + (IR Indian Point Station Operator and Senior Reactor Operator Initial Examination Report No. 05000286/2004301)
  • IR 05000352/2002302  + (IR Limerick Generating Station Reactor Operator and Senior Reactor Operator Initial Examination Report No. 50-352/02-302; 50-353/02-302)
  • IR 05000336/2003302  + (IR Millstone Unit 2 Senior Reactor Operator Initial Examination Rpt. No. 05000336/03-302 Dtd 11/12/2003)
  • ML033160484  + (IR Millstone Unit 2 Senior Reactor Operator Initial Examination Report No. 05000336/2003-302)
  • IR 05000410/2002303  + (IR Nine Mile Point 2 Senior Reactor Operator Initial Retake Examination Report No. 50-410/02-303 Dtd 12/18/02)
  • ML023460494  + (IR Nine Mile Point Unit 1 Operator and Senior Reactor Operator Initial Examination Report No. 50-220/02-302 Dtd 12/12/02)
  • IR 05000182/2008202  + (IR No. 05000182-08-202, Purdue University Research Reactor Facility, NRC Security Inspection Conducted on 06/02-05/2008)
  • IR 05000277/2002302  + (IR Peach Bottom, Units 1 and 2, Reactor Operator and Senior Reactor Operator Initial Examination Report No. 50-277/02-302; 50-278/02-302 Dtd 11/6/02)
  • IR 05000293/2003301  + (IR Pilgrim Nuclear Power Station Operator and Senior Reactor Operator Initial Examination Report No. 05000293/2003-301, Dtd 11/18/03)
  • ML092580151  + (IR Point Beach 2009-404, OUO Cover Letter Banano)
  • ML19112A203  + (IR Reactive 03002271/2019001(DNMS) Washington University in St. Louis)
  • IR 05000354/2003301  + (IR Report No. 50-354/03-301dtd 5/20/03)
  • IR 05000272/2002301  + (IR Salem, Units 1 & 2 - Operator and Senior Reactor Operator Initial Exam Rep No. 50-272/02-301 & 50-311/02-301 Dtd 12/12/02)
  • IR 05000443/2003301  + (IR Seabrook Station Operator and Senior Reactor Operator Initial Examination Report No. 50-443/03-301)
  • IR 05000443/2004301  + (IR Seabrook Station, Senior Reactor Operator Retake Examination Report No. 05000443/04-301 Dtd 1/20/04)
  • IR 05000387/2003301  + (IR Susquehanna, Units 1 and 2 Station Operator and Senior Reactor Operator Initial Examination Report 05000387/03-301 and 05000388/03-301)
  • IR 05000271/2003301  + (IR Vermont Yankee Nuclear Power Station Operator and Senior Reactor Operator Initial Examination Report No. 50-271/03-301)
  • IR 05000271/2002301  + (IR Vermont Yankee Senior Reactor Operator Upgrade Initial Operator Examination Report No. 50-271/02-301)
  • IR 05000282/2012404  + (IR- PINGP, ISFSI - NRC Security IR05000282-12-404; 05000306-12-404; and 07200010-12-401(DNMS)-publicly Available Cover Letter)
  • ML003711781  + (IR-00-004, Oconee NRC Special Inspection)
  • ML112690256  + (IR-05000003-11-008, on 09/01/11, Entergy Nuclear Operations, Inc., Buchanan, New York Site (Transmittal Letter))
  • IR 05000010/2013008  + (IR-05000010-13-008, April 24-26 and October 29, 2013; In-office Review Through December 6, 2013, Dresden Nuclear Power Station, Unit 1)
  • IR 05000128/2003201  + (IR-05000128-03-201, on 06/23-26/03 for Nuclear Science Center Reactor, Regarding Licensees Programs Concerning Operations, Emergency Preparedness, Security and Safeguards, and Radiation Protection)
  • IR 05000254/2013409  + (IR-05000254-13-409(DNMS); 05000265-13-409(DNMS); & 07200053-13-401(DNMS) - Quad Cities 2013 ISFSI Security Cover Ltr)
  • IR 05000259/2005005  + (IR-05000259-05-005, 05000260-05-005,05000296-05-005; 10/01/05 - 12/31/05 Browns Ferry Nuclear Plant, Units 1,2 & 3; Licensed Operator Requalification, Operator Performance During Non-Routine Evolutions and Events)
  • IR 05000269/2007005  + (IR-05000269-07-005, 05000270-07-005, 05000287-07-005 on 10/10/2007 - 12/31/07 for Ocenee, Units 1,2 & 3; Refueling & Outage Activities)
  • IR 05000295/2013405  + (IR-05000295-13-405 and 05000304-13-405(DNMS), 07201037-14-401- Zion (Permanently Shutdown)Isfsi Public Initial Security Inspection SRI)
  • IR 05000305/2005005  + (IR-05000305-05-005; Dominion Energy Kewaunee, Inc.; on 11/28/2005 - 12/16/2005; Kewaunee Power Station; Biennial Baseline Inspection of the Identification and Resolution of Problems)
  • IR 05000305/2006012  + (IR-05000305-06-012, on 08/31/06, Kewaunee Nuclear Power Station)
  • IR 05000317/2009002  + (IR-05000317-09-002 and 05000318-09-002, on 01/01/09 to 03/31/09, Calvert Cliffs Station Integrated Inspection Report Dated May 12, 2009)
  • IR 05000327/2008401  + (IR-05000327-08-401, IR 05000328-08-401, on 08/14/2008, Sequoyah Nuclear Plant - NRC Physical Security Inspection)
  • IR 05000331/2013404  + (IR-05000331-13-404,07200031-13-401,4/24/2013,Duane Arnold ISFSI - Cover Letter)
  • IR 05000395/2007005  + (IR-05000395-07-005, on 10/01/2007 - 12/31/2007, Virgil C. Summer Nuclear Station, Examination of Activities Conducted Under License as Related to Safety and Compliance with Commission Rules and Regulations and License Conditions)
  • IR 05000397/2006010  + (IR-05000397-06-010, on 03/13/2006 - 03/23/2006; Columbia Generating Station. Inspection Procedure 95001 Supplemental Inspection)
  • IR 05000483/2009009  + (IR-05000483-09-009 on 06/22/2009 - 08/27/2009 for Callaway Plant; Preliminary White Finding)
  • ML060520435  + (IR-06-009 Regulatory Conference, Enclosure 2 - Ppoint Redacted Version)
  • IR 05000315/2011010  + (IR-07200072-11-001 (Dnms), 05000315-11-010, 05000316-11-010, 7/30/2012. D.C. Cook Nuclear Plant, Units 1 and 2)
  • ML20198C802  + (IR-100 Portable Exposure Sys Horizontal Shock Test)
  • ML15020A594  + (IR-Kewaunee Power Station (Permanently Shut Down) - NRC Security Inspection Report Nos. 05000305/2014401(DNMS) and 07200064/2014401(DNMS)(public))
  • ML11133A384  + (IR-LaCrosse SFP Inspection Report 11)
  • IR 05000456/2012002  + (IR0 5000456-12-002, 05000457-12-002; Exelon Generation Company, LLC; 01/01/2012 ?03/31/2012; Braidwood Station, Units 1 & 2, Fire Protection, Flood Protection Measures Maintenance Effectiveness, Operability Determinations and Functional ass)
  • IR 05000275/2015003  + (IR05000275/2015003, 05000323/2015003, and 07200026/2015001 July 1, 2015 Through September 30, 2015, Diablo Canyon Power Plant - NRC Integrated Inspection Report)
  • IR 05000315/2014007  + (IR05000315-14-007, 05000316-14-007, on 03/03/2014 - 03/21/2014; D.C. Cook Nuclear Power Plant, Units 1 and 2; Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications)
  • IR 05000346/2003016  + (IR05000346-03-016, Firstenergy Nuclear Operating Company, Davis-Besse Nuclear Power Station, Final Signifiance Determination for Red Finding, Control Rod Drive Mechanism Penetration Cracking and Reactor Pressure Vessel Head Degradation)