Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20042C890 + (IPEC Emergency Plan Implementing Procedures)
- ML20063H547 + (IPEC Emergency Plan Implementing Procedures)
- ML18037A725 + (IPEC Emergency Plan Procedure)
- ML16166A059 + (IPEC Emergency Plan Procedures)
- ML18150A326 + (IPEC Emergency Plan Procedures)
- ML19289B140 + (IPEC Emergency Plan Procedures IP-EP-120, Rev. 13, IP-EP-210, Rev. 25, IP-EP-AD13, Rev. 20, EP-IP-02, Rev. 24)
- ML18109A046 + (IPEC Emergency Plan, Revision 21)
- ML19284A801 + (IPEC IP-EP-AD13, Rev. 20, Emergency Action Level Technical Bases)
- ML23242A275 + (IPEC LAR PDTS to Reflect Permanent Removal of Spent Fuel from SFPs)
- ML082420536 + (IPEC Site Emergency Plan Administrative Procedure IP-EP-AD12, Rev. 2)
- ML033530391 + (IPEC Site Management Manual, IP-SMM-AD-103, Revision 0)
- ML090540561 + (IPEC Site Management Manual, Radiological Ground Water Monitoring Program)
- ML042660161 + (IPEC Site Management Manual, Revision 0 to IP-SMM-AD-103)
- ML042720429 + (IPEC Site Management Manual, Revision 0, IP-SMM-AD-103)
- ML071500322 + (IPEC Site Management Manual, Technical Specification Bases Update 23-05/16/07)
- ML090540274 + (IPEC Status Report for October 5)
- ML090500282 + (IPEC Summary for Storm & Ground Water Releases (H-3, Ni-63, Sr-90), Compared to Site Limits Child)
- ML090500283 + (IPEC Summary for Storm & Ground Water Releases (H-3, Ni-63, Sr-90), Compared to Site Limits Teen)
- ML090410405 + (IPEC WO 00155804 01, App R Diesel Auxiliaries Transfer Switch Functional Test; Conduct Transfer Switch Functional Verification)
- ML090500263 + (IPEC Water Mass Balance and Dose Calculation from Groundwater and Storm Water)
- ML23242A218 + (IPEC – NRC Response to the Town of New Windsor, Ny Board Certified Motion Letter Regarding Treated Water Release from IP Site (Dockets 50-003, 50-247, 50-286))
- ML21144A192 + (IPEC-EP 21-02 Revision 29)
- ML11140A147 + (IPEC-EP, Revision 10, Indian Point Energy Center Emergency Plan)
- ML18151A188 + (IPEEE - Seismic USNRC GL 88-20 Suppl 4 & 5, for Surry Power Station Units 1 & 2)
- ML031070472 + (IPEEE Fire Analysis, Dated 04/08/2003)
- ML20117K895 + (IPEEE Plymouth,Ma)
- ML20070A561 + (IPEEE Submittal Rept)
- ML20069J359 + (IPEEE Submittal Rept)
- ML20132D922 + (IPEEE for Dbnp Station in Response to NRC GL 88-20, Suppl 4)
- ML20133B382 + (IPEEE for Severe Accident Vulnerabilities Submittal Rept Zion Nuclear Generating Station Units 1 & 2)
- ML20151K099 + (IPEEE for Severe Accident Vulnerabilities)
- ML20094D465 + (IPEEE, Vols 1 & 2)
- ML20141L838 + (IPEEEs - Seismic for North Anna Power Station Units 1 & 2, Per GL-88-20)
- ML20216D890 + (IPEEEs Technical Evaluation Rept High Winds,Floods & Other External Events)
- ML20135F942 + (IPIRG-2 Task 1 - Pipe System Experiments with Circumferential Cracks in STRAIGHT-PIPE Locations.Final Report.September 1991 - November 1995)
- IR 05000387/2004301 + (IR - Retake Exam Report 05000387-04-301 & 05000388-04-301, on 12/15 and 18/03 and 01/05/04, Susquehanna Steam Electric Units 1 and 2; Initial Operator Written Retake Licensing Examination; Two of Two SRO Upgrade Applicants Passed the Examin)
- IR 05000328/2004004 + (IR 02000327-04-004 and 05000328-04-004, on 06/27/2004 - 09/25/2004, Sequoyah Nuclear Power Plant, Operability Evaluations, Identification and Resolution of Problems, Event Followup)
- ML18159A152 + (IR 030-13426/2017-001; Providence Alaska Medical Center; Response to NRC Special Inspection Report 030-13426/2017-001 and Notice of Violation)
- ML18157A086 + (IR 030-13426/2017-001; Providence Alaska Medical Center; Supplemental Reply to a Notice of Violation (EA-17-182))
- ML18067A175 + (IR 030-13426/2017001, Reply to Notice of Violation, EA-17-182, Providence Alaska Medical Center)
- ML18142A424 + (IR 03013426/2017-001; Providence Health & Services Alaska; Reply to Notice of Violation; EA-17-182; NRC Inspection Report 030-13426-2017-001)
- ML103620753 + (IR 03020896-10-001, on 10/05/10 - 12/06/10, Geo Cim, Inc., Guaynabo, Pr (Transmittal Letter))
- ML22005A366 + (IR 03036550/2021001; 591M; Ground Engineering Consultants, Inc)
- ML103560822 + (IR 03037780-09-001, on 06/04/2009 - 11/30/2010, Texas Gamma Ray LLC, NRC Investigation Report 4-2009-066)
- ML18072A039 + (IR 03038913/2017005(DNMS) - Choice Letter, Narrative, Acuren Inspection, Inc. Adba/Wit Pipeline (Public))
- ML11081A009 + (IR 04000483-11-201, on 03/11/2011, Callaway Nuclear Plant Force-on-Force Inspection)
- ML072070266 + (IR 05-000289-07-003, on 4/1/2007 - 6/30/2007; Amergen Energy Company, LLC; Three Mile Island, Unit 1; Routine Integrated Report)
- ML13029A013 + (IR 05-277-12-005 and 05-278-12-005, on 10/01/2012 - 12/31/2012, Peach Bottom Atomic Power Station - NRC Integrated Inspection Report)
- IR 05000277/2012005 + (IR 05-277-12-005 and 05-278-12-005, on 10/01/2012 - 12/31/2012, Peach Bottom Atomic Power Station - NRC Integrated Inspection Report)
- IR 05000010/2007008 + (IR 050-00010-07-008; on 09/20/2007, Dresden Nuclear Power Station Unit 1, Routine Decommissioning Inspection)
- IR 05000016/2008010 + (IR 050-00016-08-010 (DNMS) on 09/30/08 and 12/19/08 for Fermi, Unit 1)