Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "GE Nuclear Test Reactor Sar". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML003697192  + (GE Nuclear Energy - Amendment 26 to Gestar II - TAC No. MA6481)
  • ML021190458  + (GE Nuclear Energy - Funding for Fuel Conversion)
  • ML020780335  + (GE Nuclear Energy Annual Report No. 42 for the GE Nuclear Test Reactor Located at Vallecitos Nuclear Center in Sunol, CA)
  • ML20138N981  + (GE Nuclear Energy Business Operations Organization Chart)
  • ML022380417  + (GE Nuclear Energy Main Steam Line Valve Out-of-Service)
  • BSEP 02-0169, GE Nuclear Energy Report NEDO-33063, Safety Analysis Report for Brunswick Steam Electric Plant, Units 1 and 2, Maximum Extended Load Line Limit Analysis Plus  + (GE Nuclear Energy Report NEDO-33063, Safety Analysis Report for Brunswick Steam Electric Plant, Units 1 and 2, Maximum Extended Load Line Limit Analysis Plus)
  • ML041900426  + (GE Nuclear Energy Request for Withholding - Hope Creek Fuel Vendor Change Response to NRC Request for Additional Information (Docket No. 50-354))
  • ML040340225  + (GE Nuclear Energy, Organization Changes to the Vallecitos Nuclear Center)
  • ML022390607  + (GE Nuclear Energy, Revisions to Security Plan for Protection of Reactor Facilities Under License R-33, Dated March, 1998)
  • ML030770862  + (GE Nuclear Energy, Withholding from Public Disclosure, River Bend Station Surveillance Capsule Flux Calculation)
  • ML20072P396  + (GE Nuclear Test Reactor Annual Rept 23,1982)
  • ML20100E092  + (GE Nuclear Test Reactor Annual Rept 25 for 1984)
  • ML20211Q512  + (GE Nuclear Test Reactor Annual Rept 27)
  • ML20196E120  + (GE Nuclear Test Reactor Annual Rept 28, for 1987)
  • ML20033G476  + (GE Nuclear Test Reactor Annual Rept 30)
  • ML20091B995  + (GE Nuclear Test Reactor Annual Rept 32 for 1991)
  • ML20065B754  + (GE Nuclear Test Reactor Annual Rept 34)
  • ML20081J673  + (GE Nuclear Test Reactor Annual Rept 35)
  • ML20206U766  + (GE Nuclear Test Reactor Annual Rept Number 39 for Period Jan-Dec 1998. with)
  • ML20035B665  + (GE Nuclear Test Reactor Annual Rept Number 33, for Period 920101-1231)
  • ML040680507  + (GE Nuclear Test Reactor Compensatory Measures Implementation Plan, Revision 1, Dated September 25, 2003)
  • ML23054A319  + (GE Nuclear Test Reactor License Renewal Technical Specifications and Safety Analysis Report)
  • ML23054A320  + (GE Nuclear Test Reactor License Renewal Technical Specifications and Safety Analysis Report)
  • ML20217P565  + (GE Nuclear Test Reactor SAR & Tss)
  • ML23086C023  + (GE Nuclear Test Reactor Safety Analysis Report and Technical Specifications)
  • ML20083C019  + (GE Numac Leak Detection Sys Emi/Rfi Analysis Rept, for DCP 87-0725)
  • ML20083C030  + (GE Numac Leak Detection Sys Seismic Analysis Summary, for DCP 87-0725)
  • ML071450174  + (GE Order Approving Transfer of Licenses and Conforming Amendments)
  • ML20206P651  + (GE Owners Group Action Plan as Result of Davis-Besse Event, June 1986)
  • ML20260E201  + (GE Packaging Model 9136)
  • ML17164A097  + (GE Pcg Materials Acceptance)
  • ML17275A126  + (GE Pcg Reactor Acceptance)
  • ML120250133  + (GE Petition for Rulemaking Pursuant to 10 C.F.R. 2.802 on Behalf of GE Osmonics, Inc)
  • ML20094N789  + (GE Plant Piping Analysis Ii,Design Memo 150-96)
  • ML20247E986  + (GE Plant Telephone Directory Wilmington Mfg Dept (Nebg) Rotating Parts Operation (Aebbg) & Supporting Organizations)
  • ML22026A025  + (GE Precision Healthcare, LLC, Notice of License Expiration, 06-32815-01)
  • ML19318A253  + (GE Pressure Suppression Containment Analytical Model)
  • ML19318A246  + (GE Pressure Suppression Containment Analytical Model)
  • ML003688937  + (GE Proprietary Information Review (10 CFR 2.790 Letter) Regarding NEDC-32084P, Revision 1, TASC-03A, a Computer Program for Transient Analysis of a Single Channel)
  • LIC-05-0120, GE Proprietary Information Supporting Fort Calhoun Station (FCS) Containment Sump Pilot Plant Audit  + (GE Proprietary Information Supporting Fort Calhoun Station (FCS) Containment Sump Pilot Plant Audit)
  • ML003689009  + (GE Proprietary Licensing Topical Report NEDE-32177P, Revision 2, Tracg Qualification, Internal Generated Letter to Be Issued in Response to a Request to Withhold Proprietary Information Pursuant to (10 CFR 2.790))
  • ML061530052  + (GE Report GENE-0000-0038-6481-01-R1-NP, Exelon Steam Dryer Dynamic Time History Analyses: Dresden Unit 2 2004 Repair and Dresden Unit 3 2003 and 2004 Repair Dryer Configurations Using Loads from Plant Measurements)
  • ML18191A246  + (GE Report Nedo 24010-0 Technical Basis for the Use of the Square Root for the Sum of Squares (Srss) Method for Combining Dynamic Loads on Mark II Plants - July 1977)
  • ML18191A185  + (GE Report, Analytical Model for Estimating Drag Forces on Rigid Submerged Structures Caused by LOCA and Safety Relief Valve Ramshead Air Discharges, NEDO-21471, Dated Sept. 1977)
  • ML060880448  + (GE Report, GE-NE-0000-0020-9436-R1-NP, Revision 1, Constellation Energy Group, Nine Mile Point Nuclear Station, Unit 2, 7/24/03 Instability Event, OPRM Performance Evaluation, March 2006)
  • ML060880446  + (GE Report, GE-NE-0000-0041-0403-RI-NP, Revision 1, First Energy Corp, Perry Nuclear Power Plant, 12/23/04 Instability Event, OPRM Performance Evaluation, March 2006)
  • ML20150E877  + (GE Rept Mark II Containment Supporting Prog:Summary of 4-T Fluid-Struc Interaction Studies. Purpose of Study Was to Investigate Struc Characteristics of the 4T Facil & Examine Fluid/Struc Interactions Re Measurements)
  • ML19263B237  + (GE Rept NEDO-21888 Mark I Containment Program-Load Definition Rept Was Submitted to NRC on 781228.Rept Provides Info Defining Hydrodynamic Loads Produced on Containment Sys During LOCA & Should Be Included on Docket)
  • ML20147G372  + (GE Rept NEDO-21985: Functional Capability Criteria for Essential Mark II Piping. Criteria Were Selected to Be Conservative But Not Overly So,To Achieve Max Reliability of Pipe Design Fabrication,Insvc Inspec & Oper)
  • ML19325D332  + (GE Rept,Lasalle Unit 2 Spurious Scram)