Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML003697192 + (GE Nuclear Energy - Amendment 26 to Gestar II - TAC No. MA6481)
- ML021190458 + (GE Nuclear Energy - Funding for Fuel Conversion)
- ML020780335 + (GE Nuclear Energy Annual Report No. 42 for the GE Nuclear Test Reactor Located at Vallecitos Nuclear Center in Sunol, CA)
- ML20138N981 + (GE Nuclear Energy Business Operations Organization Chart)
- ML022380417 + (GE Nuclear Energy Main Steam Line Valve Out-of-Service)
- BSEP 02-0169, GE Nuclear Energy Report NEDO-33063, Safety Analysis Report for Brunswick Steam Electric Plant, Units 1 and 2, Maximum Extended Load Line Limit Analysis Plus + (GE Nuclear Energy Report NEDO-33063, Safety Analysis Report for Brunswick Steam Electric Plant, Units 1 and 2, Maximum Extended Load Line Limit Analysis Plus)
- ML041900426 + (GE Nuclear Energy Request for Withholding - Hope Creek Fuel Vendor Change Response to NRC Request for Additional Information (Docket No. 50-354))
- ML040340225 + (GE Nuclear Energy, Organization Changes to the Vallecitos Nuclear Center)
- ML022390607 + (GE Nuclear Energy, Revisions to Security Plan for Protection of Reactor Facilities Under License R-33, Dated March, 1998)
- ML030770862 + (GE Nuclear Energy, Withholding from Public Disclosure, River Bend Station Surveillance Capsule Flux Calculation)
- ML20072P396 + (GE Nuclear Test Reactor Annual Rept 23,1982)
- ML20100E092 + (GE Nuclear Test Reactor Annual Rept 25 for 1984)
- ML20211Q512 + (GE Nuclear Test Reactor Annual Rept 27)
- ML20196E120 + (GE Nuclear Test Reactor Annual Rept 28, for 1987)
- ML20033G476 + (GE Nuclear Test Reactor Annual Rept 30)
- ML20091B995 + (GE Nuclear Test Reactor Annual Rept 32 for 1991)
- ML20065B754 + (GE Nuclear Test Reactor Annual Rept 34)
- ML20081J673 + (GE Nuclear Test Reactor Annual Rept 35)
- ML20206U766 + (GE Nuclear Test Reactor Annual Rept Number 39 for Period Jan-Dec 1998. with)
- ML20035B665 + (GE Nuclear Test Reactor Annual Rept Number 33, for Period 920101-1231)
- ML040680507 + (GE Nuclear Test Reactor Compensatory Measures Implementation Plan, Revision 1, Dated September 25, 2003)
- ML23054A319 + (GE Nuclear Test Reactor License Renewal Technical Specifications and Safety Analysis Report)
- ML23054A320 + (GE Nuclear Test Reactor License Renewal Technical Specifications and Safety Analysis Report)
- ML20217P565 + (GE Nuclear Test Reactor SAR & Tss)
- ML23086C023 + (GE Nuclear Test Reactor Safety Analysis Report and Technical Specifications)
- ML20003H133 + (GE Nuclear Test Reactor Sar)
- ML20083C019 + (GE Numac Leak Detection Sys Emi/Rfi Analysis Rept, for DCP 87-0725)
- ML20083C030 + (GE Numac Leak Detection Sys Seismic Analysis Summary, for DCP 87-0725)
- ML071450174 + (GE Order Approving Transfer of Licenses and Conforming Amendments)
- ML20206P651 + (GE Owners Group Action Plan as Result of Davis-Besse Event, June 1986)
- ML20260E201 + (GE Packaging Model 9136)
- ML17164A097 + (GE Pcg Materials Acceptance)
- ML17275A126 + (GE Pcg Reactor Acceptance)
- ML120250133 + (GE Petition for Rulemaking Pursuant to 10 C.F.R. 2.802 on Behalf of GE Osmonics, Inc)
- ML20094N789 + (GE Plant Piping Analysis Ii,Design Memo 150-96)
- ML20247E986 + (GE Plant Telephone Directory Wilmington Mfg Dept (Nebg) Rotating Parts Operation (Aebbg) & Supporting Organizations)
- ML22026A025 + (GE Precision Healthcare, LLC, Notice of License Expiration, 06-32815-01)
- ML19318A253 + (GE Pressure Suppression Containment Analytical Model)
- ML19318A246 + (GE Pressure Suppression Containment Analytical Model)
- ML003688937 + (GE Proprietary Information Review (10 CFR 2.790 Letter) Regarding NEDC-32084P, Revision 1, TASC-03A, a Computer Program for Transient Analysis of a Single Channel)
- LIC-05-0120, GE Proprietary Information Supporting Fort Calhoun Station (FCS) Containment Sump Pilot Plant Audit + (GE Proprietary Information Supporting Fort Calhoun Station (FCS) Containment Sump Pilot Plant Audit)
- ML003689009 + (GE Proprietary Licensing Topical Report NEDE-32177P, Revision 2, Tracg Qualification, Internal Generated Letter to Be Issued in Response to a Request to Withhold Proprietary Information Pursuant to (10 CFR 2.790))
- ML061530052 + (GE Report GENE-0000-0038-6481-01-R1-NP, Exelon Steam Dryer Dynamic Time History Analyses: Dresden Unit 2 2004 Repair and Dresden Unit 3 2003 and 2004 Repair Dryer Configurations Using Loads from Plant Measurements)
- ML18191A246 + (GE Report Nedo 24010-0 Technical Basis for the Use of the Square Root for the Sum of Squares (Srss) Method for Combining Dynamic Loads on Mark II Plants - July 1977)
- ML18191A185 + (GE Report, Analytical Model for Estimating Drag Forces on Rigid Submerged Structures Caused by LOCA and Safety Relief Valve Ramshead Air Discharges, NEDO-21471, Dated Sept. 1977)
- ML060880448 + (GE Report, GE-NE-0000-0020-9436-R1-NP, Revision 1, Constellation Energy Group, Nine Mile Point Nuclear Station, Unit 2, 7/24/03 Instability Event, OPRM Performance Evaluation, March 2006)
- ML060880446 + (GE Report, GE-NE-0000-0041-0403-RI-NP, Revision 1, First Energy Corp, Perry Nuclear Power Plant, 12/23/04 Instability Event, OPRM Performance Evaluation, March 2006)
- ML20150E877 + (GE Rept Mark II Containment Supporting Prog:Summary of 4-T Fluid-Struc Interaction Studies. Purpose of Study Was to Investigate Struc Characteristics of the 4T Facil & Examine Fluid/Struc Interactions Re Measurements)
- ML19263B237 + (GE Rept NEDO-21888 Mark I Containment Program-Load Definition Rept Was Submitted to NRC on 781228.Rept Provides Info Defining Hydrodynamic Loads Produced on Containment Sys During LOCA & Should Be Included on Docket)
- ML20147G372 + (GE Rept NEDO-21985: Functional Capability Criteria for Essential Mark II Piping. Criteria Were Selected to Be Conservative But Not Overly So,To Achieve Max Reliability of Pipe Design Fabrication,Insvc Inspec & Oper)
- ML19325D332 + (GE Rept,Lasalle Unit 2 Spurious Scram)