GE Report, GE-NE-0000-0041-0403-RI-NP, Revision 1, First Energy Corp, Perry Nuclear Power Plant, 12/23/04 Instability Event, OPRM Performance Evaluation, March 2006.
ML060880446
Person / Time
Site: Perry, PROJ0710  FirstEnergy icon.png
Issue date: 03/31/2006
From:
General Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
DRF 0000-0051-4286, MFN 06-089 GE-NE-0000-0041-R1-NP, Rev 1
Download: ML060880446 (29)


Text

ENCLOSURE 3 MFN 06-089 GE Report, GE-NE-0000-0041-0403-R1-NP, Revision 1, First Energy Corp, Perry NuclearPowerPlant, 12/23/04 Instability Event, OPRMPerformanceEvaluation, March 2006 Non-Proprietary Version IMPORTANT NOTICE This is a non-proprietary version of GE-NE-0000-0041-0403-R1-P, which has the proprietary information removed. Portions of the enclosure that have been removed are indicated by an open and closed bracket as shown here (( ))

GE Energy, Nuclear 1989 Little Orchard Road San Jose, CA 95125 GE-NE-0000-004 1-0403-RI-NP Revision 1 Class I DRF 0000-0051-4286 March 2006 NON-PROPRIETARY VERSION FIRSTENERGY CORP PERRY NUCLEAR POWER PLANT 12/23/04 INSTABILITY EVENT OPRM PERFORMANCE EVALUATION IC=

1-JI jN

. -IJ

GE-NE-0000-41-0403-Ri -NP Non-Proprietary Version NON-PROPRIETARY INFORMATION NOTICE This is a non-proprietary version of the document GE-NE-0000-0041-0403-R1-P, which has the proprietary information removed. Portions of the document that have been removed are indicated by an open and closed double brackets as shown here (( )).

IMPORTANT NOTICE REGARDING CONTENTS OF THIS REPORT Please Read Carefully The only undertakings of the General Electric Company (GE) respecting information in this document are contained in the contract between the customer and GE. Nothing contained in this document shall be construed as changing the contract. The use of this information by anyone other than the customer, or for any purpose other than that for which it is intended, is not authorized. With respect to any unauthorized use, GE makes no representation or warranty, express or implied, and assumes no liability as to the completeness, accuracy, or usefulness of the information contained in this document, or that its use may infringe privately owned rights.

ii

GE-NE-00004 1-0403-RI -NP Non-Proprietary Version Table of Contents

1. BACKGROUND ............................................... 1
2. ASSESSMENT OBJECTIVES ................................................ 2
3. SYSTEM DESIGN AND KEY INPUTS ................................................ 3
4. EVALUATION AND RESULTS ............................................... 4 4.1 Oscillation Mode Determination ................................................ 4 4.2 PBDA Cutoff and Averaging Filter ................................................ 4 4.3 Pre-Trip Alarms ............................................... 5 4.4 Leading OPRM Cells and Detection Algorithm Performance ..................................... 5 4.5 Oscillation Period and Period Tolerance ................................................ 6
5. CONCLUSIONS ............................................... 7
6. REFERENCES ............................................... 8 Hii

GE-NE-000041 -0403-RI -NP Non-Proprietary Version

1. BACKGROUND Perry has implemented Boiling Water Reactor Owners Group (BWROG) Long Term Stability Solution Option III, which is described in Reference 1. Reload evaluation of the OPRM system setpoints has been performed in accordance with Reference 3 and the Perry-specific OPRM system setpoints are established.

The OPRM system monitors core thermal-hydraulic instabilities by real-time interrogation of OPRM cells, which are composed of closely packed LPRM detectors. The OPRM cell signals are analyzed by three separate detection algorithms that test for neutron flux oscillations. These algorithms are the Period Based Detection Algorithm (PBDA), the Amplitude Based Algorithm (ABA), and the Growth Rate Algorithm (GRA). Automatic protection is actuated if any one of the three algorithms meets its trip conditions.

However, only the PBDA is required to provide protection of the Safety Limit Minimum Critical Power Ratio (SLMCPR) for anticipated reactor instabilities. The other two algorithms are included as defense-in-depth.

A December 23rd 2004 plant transient included unplanned recirculation pump transfer from fast to slow speed resulting in a power decrease from about 100% to 44% rated and a flow decrease from about 99% to 33% rated. As the feedwater temperature was reduced to equilibrium conditions, the power increased from about 44% to about 55% with little change in flow. The state condition just prior to the instability was in the upper left corner of the power/flow map, which may be susceptible to coupled thermal-hydraulic neutronic oscillations. Subsequently, an OPRM initiated scram occurred after the thermal-hydraulic instability (THI) event developed (see Figure 1).

The Perry core loading consists of 584 bundles of GE14 and 164 bundles of GE12, both bundles with a 10x10 fuel design. Perry is licensed to operate within the Maximum Extended Load Line Limit Analysis (MELLLA) domain.

1

GE-NE-0000-41 -0403-RI -NP Non-Proprietary Version

2. ASSESSMENT OBJECTIVES The objectives of the Perry 12/23/04 THI event evaluation are to:
  • Assess the functionality of the second-order Butterworth averaging and filtering algorithms
  • Analyze selected OPRM cells
  • Determine the characteristics of the reactor instability event (e.g., oscillation mode, oscillation frequency, period counts, oscillation amplitude)
  • Determine the algorithm that initiated the trip --- PBDA, ABA or GRA
  • Assess the adequacy of the as-designed OPRM functions - alarm history, trip timing, PBDA Successive Confirmation Count (SCC) setpoint, OPRM cell signal amplitude setpoint
  • Provide selected plots of OPRM cells SCC, Relative Signal (RS), and Oscillation Period (OP).

2

GE-NE-0000-41-0403-RI -NP Non-Proprietary Version

3. SYSTEM DESIGN AND KEY INPUTS The Perry OPRM system uses a 4BL configuration with 4 LPRMs assigned to each OPRM cell. Figures 2a through 2d illustrate the LPRM to OPRM assignment for the four channels, with 32 OPRM cells per channel for Channels 1 and 2, and 29 OPRM cells per channel for Channels 3 and 4. In this report, OPRM cells are designated as xyy, corresponding to OPRM cell yy of Channel x. Table 1 lists key parameters used by the OPRM system prior to the reactor trip and its assigned values.

The amplitude trip setpoint is the relative power level, or peak over average (P/A), at which the OPRM cell generates a trip signal, provided the required number of SCC has been reached. Two conditions must be met for the same OPRM cell in an OPRM channel to result in a PBDA-based channel trip:

1. The SCC reaches or exceeds the SCC setpoint (10 for Perry).
2. The cell signal P/A reaches or exceeds the OPRM trip amplitude setpoint (1.07 for Perry).

The OPRM performance evaluation consists of post-event analysis of the OPRM data from the plant computer. About 910 seconds of LPRM and OPRM data was collected. The OPRM data includes the following information, available for all OPRM cells:

  • Relative signal
  • Time-averaged base period.

Both the LPRM and OPRM data was available during the period, which provided useful data for thermal-hydraulic instability (THI) event off-line evaluation.

3

GE-NE-0000-4 1-0403-RI -NP Non-Proprietary Version

4. EVALUATION AND RESULTS The OPRM performance evaluation includes identification of:
  • Oscillation mode - core-wide or regional
  • PBDA cutoff and averaging filter
  • Pre-trip alarms
  • Leading OPRM Cells and detection algorithm performance
  • Period Tolerance and Oscillation period 4.1 Oscillation Mode Determination The relative signals for four selected OPRM cells from each core quadrant from Channel 1 are shown in Figure 3. For these nearly symmetric four OPRM cells (Cells 106, 109, 124 and 127), the oscillations are all in phase, indicating that the oscillations are in the fundamental core-wide mode.

4.2 PBDA Cutoff and Averaging Filter Based on the LPRM data provided, the LPRM signals for a few selected OPRM cells were examined.

Both the averaging filter and cutoff frequency employ the same second-order Butterworth filter with different frequency (]Q)values. The cutoff frequency is set at 1Hz. The averaging 4

GE-NE-00004 1-0403-RI-NP Non-Proprietary Version filter is implemented with a frequency corresponding to an average time constant of 5 seconds.

((

The use of a 5 second averaging time constant resulted in a relatively flat OPRM cell average signal and was adequate for this event since the growth rate was relatively low (growth rate < 1.10).

1))

))

The second-order Butterworth filter with a setting of 1Hz cutoff frequency is found to be very effective in removing residual high-frequency noise from the oscillation signal.

4.3 Pre-Trip Alarms Based on individual SCC plots, there were a few alarms during the event. There were several occasions when the SCC exceeded the alarm count of 20 while the P/A signal remained below 1.07. Figures 6a through 6c show a few cells that might have generated pre-trip alarms, which are consistent with the several alarms observed at the plant.

4.4 Leading OPRM Cells and Detection Algorithm Performance Table 2 lists the maximum SCC from the recorded data for all OPRM cells in Channels 1 and 3. Many cells were found to have exceeded the SCC threshold of 10 when the OPRM system tripped. The OPRM P/A signal was at about 1.070 for the leading OPRM cells when the RPS trip was actuated. (One leading OPRM cell in Channel 1 is Cell 120.)

Hence, the system worked as designed.

Figures 7a through 7c show three typical leading OPRM cells. These cells reached the SCC setpoint prior to reaching the OPRM trip amplitude setpoint. This is the expected sequence of instability detection and suppression for Option III.

5

GE-NE-0000-4 1-0403-RI -NP Non-Proprietary Version The general observation is that most of the OPRM cells were participating in the instability and approaching the OPRM trip setpoint around the same time. As the oscillation magnitude grew it overcame the interference from the noise and allowed fewer resets. In fact, there were very few resets in the counts once the oscillations were coherent in nature.

The other two defense-in-depth algorithms (ABA and GRA) did not generate a trip signal since the relative amplitude did not reach the 1.1 threshold. It is concluded therefore, that the OPRM system trip was generated by the PBDA algorithm and that the OPRM system provided its intended protection.

4.5 Oscillation Period and Period Tolerance

))

Based on the this THI event data, the use of a 100 msec period tolerance did not result in spurious resets and the setting is appropriate for the THI protection.

The core-wide mode reactor oscillations were initiated approximately 200 seconds prior to the reactor trip. At the instability threshold, the oscillation period tended to be less coherent. ((

))

6

GE-NE-00004 1-0403-Ri -NP Non-Proprietary Version

5. CONCLUSIONS The following conclusions can be drawn from the Perry OPRM instability event data analysis:
1. The oscillation mode is core-wide.
2. The reactor was tripped by the PBDA. The OPRM P/A was exactly at the cycle-specific amplitude setpoint of 1.07 when the trip occurred and the PBDA tripped as expected.
3. The Tmin and Tmax settings of 1.2 and 3.5 seconds, respectively, were appropriate for the specific Perry configuration.
4. The use of a 5 second time constant averaging filter was adequate for this event.
5. Selection of 1 Hz frequency for the condition filter cutoff is sufficient to remove high frequency noise from the OPRM cell signal to minimize SCC resets for a coherent oscillation.
6. Based on the MCPR assessment in the previous ODYSY report, the OPRM system SCC and amplitude setpoints were adequate for safety limit MCPR protection.
7. The design of 4 LPRMs per OPRM cell was adequate for this application since the OPRM cell signals did not exhibit any abnormal behavior.
8. Selection of the period tolerance at 100 msec or larger was sufficient to avoid SCC resets due to normal signal period variations, filtering residual effects that may distort the signal characteristic at peaks/valleys, and software digital processing inaccuracies.

The PBDA performed as expected since the OPRM P/A was at the amplitude trip setpoint when the reactor scram was initiated. Most of the OPRM cells performed as expected, exhibiting very few SCC resets. The Perry THI event did not produce any safety hazard and the SLMCPR was protected by the Option III OPRM system.

The lessons learned from the NMP2 THI event provided effective settings in this THI event and the OPRM system functioned and generated a trip signal as designed.

7

GE-NE-0000-41-0403-Ri-NP Non-Proprietary Version

6. REFERENCES
1. NEDO-3 1960-A, "BWR Owner's Group Long-Term Stability Solutions Licensing Methodology," November 1995.
2. Not Used.
3. NEDO-32465-A, "Reactor Stability Detect and Suppress Solutions Licensing Basis Methodology for Reload Application," August 1996.
4. Not Used.
5. Not Used.
6. Not Used.

8

GE-NE-0000-4 1-0403-Ri -NP Non-Proprietary Version Table 1. OPRM System Settings Parameter Setting Corner or cutoff 1 Hz frequency Period tolerance 100 msec OPRM P/A setpoint 1.07 OPRM CC alarm setpoint 20 OPRM CC trip setpoint 10 Tmin (Minimum 1.2 oscillation period check)

Tmax (Maximum 3.5 oscillation period check)

OPRM trip enabled > 23.8% rated power, region size < 60% rated flow Min LPRMs per 1 Operable OPRM cell Averaging filter time 5 seconds constant Reactor Protection One of two, taken twice System (RPS) trip logic 9

GE-NE-0000-41-0403-RI -NP Non-Proprietary Version Table 2. Maximum SCC for Selected OPRM channels OPRM Cell Channel 1 Channel 3 1 32 27 2 36 33 3 43 3**

4 33 30 5 22 44 6 36 33 7 36 42 8 33 40 9 _ _34 33 10 33 43 11 38 53 12 35 42 13 32 33 14 38 33 15 33 41 16 48 43 17 28 31 18 35 31 19 56 28 20 49 33 21 45 33 22 26 33 23 35 35 24 36 35 25 51 29 26 40 24 27 24 37 28 29 30 29 30 40 30 26 N/A 31 32 N/A 32 28 N/A

    • Might be defective. The base period was nev er reset after the runback. It stays as 5.5 seconds throughout the THI event.

10

GE-NE-0000-4 1-0403-RI -NP Non-Proprietary Version Figure 1. Event Power/Flow Path Two Loop Power- Flow Map I10 I

70-U.

i 45 - - - -

Q ,...,.. -.--- ----- ~

35 LK Is _- - - -

IO-ci 5 10 15 Z3 ZS 30 ID4046 SO E 65 70l 75 Ea 85 SO 1130 1135 Ila.

A" COREFLOW%rotd 11

GE-NE-0000-41-0403-RI -NP Non-Proprietary Version Figure 2a. Perry OPRM Channel 1 Assignment 12

GE-NE-0000-41 -0403-RI -NP Non-Proprietary Version Figure 2b. Perry OPRM Channel 2 Assignment 13

Al GE-NE-0000-41-0403-RI -NP Non-Proprietary Version Figure 2c. Perry OPRM Channel 3 Assignment 14

GE-NE-0000-41 -0403-RI -NP Non-Proprietary Version Figure 2d. Perry OPRM Channel 4 Assignment 15

GE-NE-0000-41-0403-RI -NP Non-Proprietary Version Figure 3. Core-Wide Mode Demonstration Core-Wide Oscillation 2.3 -

2.2 -.

  • 2.1 . . ii *I t  ; II I i i oil :Cell 109 2 -

X 2. II~~

i , l

-Cell 124 1.9 -  ! , i-iCell I , .8 106 1.8- , hv v . I Iv.'v T a 1.7-0 1.6 , ,

860 870 880 890 900 Time (seconds) 16

GE-NE-000041 -0403-RI -NP Non-Proprietary Version Figure 4 Cell 105 LPRM and OPRM Signals (1 Hz Cutoff) 11 1]

17

GE-NE-0000-4 1-0403-RI -NP Non-Proprietary Version Figure 5a. Cell 105 OPRM Signals (4 Cutoff Frequencies)

[I

))

18

GE-NE-000041-0403-R1 -NP Non-Proprietary Version Figure 5b. Cell 105 OPRM Signal (1.0 and 1.5 Hz Cutoff frequency) 1[

))

19

GE-NE-0000-4 1-0403-Ri -NP Non-Proprietary Version Figure 6a. Pre-Trip Alarm (Cell 119)

_ RS OPRM Cell 119 A OP(seconds) 0 Counts 2.00000 -&- I-, 60 1.80000-1.60000 M 50 1.40000-_ 40 IL 0

1.20000 -

0 1.00000 - 30=

a) 0 tw 0.80000 E 10 20 0.60000 -

0.40000 - 10 0.20000 -

0.00000 X 0 600 700 800 900 Time (s) 20

GE-NE-0000-41-0403-RI -NP Non-Proprietary Version Figure 6b. Pre-Trip Alarm (Cell 115)

OPRM Cell 115 2.00000 40 1.80000 36 1.60000W 32 1.40000 - - 28 n 1.20000 24 RS 0

o 1.00000 Wwfi~W' P 20 a Period i 0.80000 i I 0 Counts 0.60000 - 12 0.40000 - 8 0.20000 4 0.00000 0 700 750 800 850 900 Time (s) 21

GE-NE-0000-41-0403-RI -NP Non-Proprietary Version Figure 6c. Pre-Trip Alarm (Cell 128) 22

GE-NE-0000-4 1-0403-RI -NP Non-Proprietary Version Figure 7a. One Leading Cell Performance (Cell 120)

OPRM Cell 120 2.00000 - ' 40 1.80000 ' - -36 1.60000 - - Al -32 1.40000 - -28 0L 1.20000 - 24 c -RS 0

0 1.00000 ;_  :-- / 20 3 A Period wo a, 0 0.80000 - 16 o) Counts 0.60000 - i - I 12 0.40000 0.20000 - - -4 0.00000

  • 0 850 860 870 880 890 900 910 Time (s) 23

GE-NE-0000-41-0403-RI -NP Non-Proprietary Version Figure 7b. One Leading Cell Performance (Cell 131)

OPRM Cell 131 2 . 0_ = 0 0 C -. 40 2.80000C

_- DN--- 32 1.2000C D. -0eC--28 D ~f - 24 ., R 1.6000C DAA 1.0A 20 n Period m .2000C D < _12 0.6000C D -_ 8 850 860 870 880 890 900 910 Time (s) 24

GE-NE-00004 1-0403-Ri-NP Non-Proprietary Version Figure 7c. Leading Cell Performance (Cell 102)

OPRM Cell 102 2.00000 - 40 1.80000 -- ~ %_ - 36 1.60000 - A 32 1.40000 - 28 eL 1.20000 24 -RS 0 1.00000 _ V .  ; 20 00 E Period 0

W. 0.80000 - 16 U Counts 0.60000 - 12 0.40000 - 8 0.20000 4 0.00000 0 850 860 870 880 890 900 910 Timre (s) 25