I GE Nuclear Energy David W. Turner Manager, Regulatory Compliance & EHS Vallecitos Nuclear Center 6705 Vallecitos Rd M/C V-1 8 Sunol, CA 94586 January 29, 2004 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Subj: R-33 (NTR) Organization Changes RE: (1) License R-33, Docket 50-73 (2) NEDO-32765 Technical Specifications for Ref (1)

Encl: (1) Current Implementation of Fig 6-1 of Ref (2)

On December 3 15, 2003, Chuck Bassett filled the position of Facilities Maintenance &

Quality Assurance. To support this, I was assigned responsibility for the remainder of the Regulatory Compliance Function. Formal turnover of the Radiation Safety and Criticality Safety Functions is to occur on January 30th.

The second organizational change replaces Louis Quintana with Scott Bump as the Site Manager, effective February 2 3r. Mr. Bump will take on Mr. Quintana's responsibilities for the Vallecitos Nuclear Center Operations. Mr. Bump has been designated by the General Managers of the General Electric divisions represented at VNC as the manager responsible for the nuclear safety, industrial safety and environmental compliance for the entire site.

These positions are detailed in section 6 of Reference (2.) Enclosure (1) details the current implementation of Figure 6-1 in Ref 2.

Please contact me at the address above, david.tumer~gene.ge.com or by phone at 925.862.4360 if there are any further questions in this matter.

Sincerely yours, David W. Turner Manager, Regulatory Compliance & EHS cc: Attention: Marvin Mendonca, 012-G13 U.S. Nuclear Regulatory Commission (DCA

)C One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738

I'7 General Electric Company ll Upper Level Management it lji~~~~~~~

Scott Bump **

Manager, Vallecitos (Level 3 Manager)

+

l David Turner l Manager, Regulatory Edward Ehrlich Chuck Bassett Compliance & EHS l Manager, NTR Vallecitos Technological (Nuclear Safety and l (Level 2 Facility Manager) Safety Council Chairman Regulatory Compliance)

Nuclear Nuclear Safety Safety FunctI Func~tion] l NTR Operators I Change from Chuck Bassett to David Turner, Effective 1/30/2004

' Change From L.Quintana to Scott Bump Effective 3/1/2004 Enclosure 1 Page I of I of DWT-2004-06R-33 Organization Changes.pdf