Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML22244A217 + (Full Fee Exemption Request for Industry Guidance Proposal - Weather Related Administrative Controls During Transient Outdoor Dry Cask Operations)
- ML22244A214 + (Full Fee Exemption Request for Industry Guidance Proposal – Weather Related Administrative Controls During Transient Outdoor Dry Cask Operations)
- 05000237/FIN-2006010-04 + (Full Flow Testing of the Diesel Driven Flood Pump at Design Conditions)
- PMNS20180887, Full Implementation Cyber Security Inspections + (Full Implementation Cyber Security Inspections)
- NOC-AE-04001811, Full Implementation of the STP Security Plan and Full Compliance with NRC Orders Related to the Revised Design Basis Threat and Security Force Personnel Training + (Full Implementation of the STP Security Plan and Full Compliance with NRC Orders Related to the Revised Design Basis Threat and Security Force Personnel Training)
- ML043210115 + (Full Implementation of the STP Security Plan and Full Compliance with NRC Orders Related to the Revised Design Basis Threat and Security Force Personnel Training)
- ML23270A956 + (Full Materials License Signature Authority for Laura B. Cender for All Categories of Materials Licenses Including But Not Limited to: Broad Scope Use (Academic, Research and Development, Veterinary and In-Vitro - Testing, Nuclear Pharmacies)
- ML18302A299 + (Full Metrics for FY2018)
- ML061510112 + (Full Operating License Pages Associated with License Transfer)
- 05000259/LER-2023-002, Full Reactor Scram Due to an Oscillation Power Range Monitor (OPRM) Confirmation Density Algorithm (CDA) Trip + (Full Reactor Scram Due to an Oscillation Power Range Monitor (OPRM) Confirmation Density Algorithm (CDA) Trip)
- ML20133P905 + (Full Scale Measurements of Smoke Transport and Deposition in Ventilation System Ductwork)
- ML061310445 + (Full Scope Alternate Source Term - Supplemental Information, Description of Meteorological Data)
- ET 13-0023, Full Scope Implementation of the Alternative Source Term + (Full Scope Implementation of the Alternative Source Term)
- ML24220A029 + (Full Speaker Bios)
- ML20073D022 + (Full Structural Weld Overlay Design for Peach Bottom Unit 2 RWCU Weld 12-I-1D)
- ML20090A951 + (Full Structural Weld Overlay Design for Oyster Creek Shutdown Cooling & Core Spray Sys)
- NL-16-0421, Full Structural Weld Overlays on Reactor Recirculation and Residual Heat Removal Systems, Nondestructive Examination Results - Spring 2016 Outage (1R27) + (Full Structural Weld Overlays on Reactor Recirculation and Residual Heat Removal Systems, Nondestructive Examination Results - Spring 2016 Outage (1R27))
- ML16326A210 + (Full Transition to the Reactor Oversight Process and Assessment Letter - Docket No. 50-0391)
- ML071360301 + (Full Transition to the Reactor Oversight Process - Browns Ferry Nuclear Plant Unit 1)
- ML23138A118 + (Full Written Explanation)
- ML12125A298 + (Full Written Explanation)
- ML20215B016 + (Full-Flow Filter Recovery & Equipment Assessment)
- ML16224A794 + (Full-Height, Full Pressure Integral System Testing for the Westinghouse AP600 Passive Plant Design)
- ML20203J325 + (Full-Scale Buttress Test for Prestressed Nuclear Containment Structures)
- ML20148C207 + (Full-Scale Fire Test 1,Cable Tray Fire Test. Results of Tests of Cable Sys,Including Mineral Wool Fire Barriers & Automatic Fixed Detection & Suppression Sys Used in Typical Vertical Tray Presented)
- ML20052C650 + (Full-Scale Joint Emergency Exercise,820201-02)
- ML20133D892 + (Full-Scale Plant Safety & Availability Assessment: Demonstration of Go Sys Analysis Methodology, Vol 1, Plant-Level Models, Final Rept)
- ML20133D931 + (Full-Scale Plant Safety & Availability Assessment - Demonstration of Go Sys Analysis Methodology, Vol 2, App - Sys-Level Detailed Models, Final Rept)
- ML16274A260 + (Full-Term Operating License for the Dresden Nuclear Power Station, Unit 2)
- ML16253A142 + (Full-Term Operating License for the Oyster Creek Nuclear Generating Station)
- ML16274A263 + (Full-Term Operating License for the Palisades Nuclear Plant)
- ML16253A282 + (Full-Term Operating License for the San Onofre Nuclear Generating Station, Unit 1)
- ML023010523 + (Full-scale Emergency Planning Zone Exercise of the Offsite Radiological Emergency Response Plans Site-specific to the Quad Cities Nuclear Power Station)
- ML20081L947 + (Full-term License DPR-16 Issued to Gpu & Jersey Central Power & Light Co)
- ML20132F664 + (Fully Executed Notification of Contract Execution,Mod 10,to Geotechnical Engineering Case Review. Contractor:Army Corps of Engineers)
- ML20129E656 + (Fully Executed Notification of Contract Execution,Mod 2,to Piping Inelastic Fracture Mechanics Analysis. Contractor: Naval Research Lab)
- PMNS20221291, Fully Virtual (No Face-to-Face) Industry / U.S. Nuclear Regulatory Commission (NRC) Nondestructive Examination (NDE) Technical Information Exchange Public Meeting + (Fully Virtual (No Face-to-Face) Industry / U.S. Nuclear Regulatory Commission (NRC) Nondestructive Examination (NDE) Technical Information Exchange Public Meeting)
- ML20238A344 + (Fulton Generating Statio Regional Environs Radiation Monitoring Program,1975)
- ML20081C313 + (Fumigation Potential at Inland and Coastal Power Plant Sites)
- ML20083P561 + (Function & Task Analysis Control Room Design Review, Per Suppl 1 to NUREG-0737)
- ML17277B309 + (Function & Task Analysis of Emergency Operating Procedures)
- ML25175A110 + (Function Allocation: Myths, Process, and Emerging Methods (Paper))
- ML25175A100 + (Function Allocation: Myths, Process, and Emerging Methods (Presentation))
- ML19113A092 + (Functional Arrangement ITAAC Acceptance Criteria R1)
- ML20126E950 + (Functional Capability of Piping Systems)
- ML20052E799 + (Functional Contract Spec for Rcs)
- ML20261G542 + (Functional Control Diag:High Pressure Core Spray Power Supply. Sheet 1)
- ML20261G533 + (Functional Control Diag:High Pressure Core Spray Power Supply. Sheet 3)
- ML20261G537 + (Functional Control Diag:High Pressure Core Spray Power Supply. Sheet 4)
- ML20261G528 + (Functional Control Diag:High Pressure Core Spray Power Supply. Sheet 4)
- ML20261G524 + (Functional Control Diag:High Pressure Core Spray Power Supply. Sheet 5)