ML071360301
| ML071360301 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 05/16/2007 |
| From: | Widmann M Reactor Projects Region 2 Branch 6 |
| To: | Swafford P Tennessee Valley Authority |
| References | |
| Download: ML071360301 (6) | |
Text
May 16, 2007 Tennessee Valley Authority ATTN:
Mr. Preston D. Swafford, Interim Chief Nuclear Officer and Senior Vice President 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
SUBJECT:
FULL TRANSITION TO THE REACTOR OVERSIGHT PROCESS - BROWNS FERRY NUCLEAR PLANT UNIT 1
Dear Mr. Swafford:
On September 23, 2003, the NRC issued Inspection Manual Chapter (IMC) 2509, "Browns Ferry Unit 1 Restart Project Inspection Program." Included in this IMC were the guidelines and provisions the NRC used for regulatory oversight of Browns Ferry Unit 1 (BF1) during its five year recovery. However, after successful completion of the BF1 recovery project and subsequent startup, this letter documents the NRCs decision to transfer Unit 1 to the full regulatory oversight provided by the Reactor Oversight Process (ROP) for all safety cornerstones as delineated by IMC 2515, Light-Water Reactor Inspection Program -
Operations Phase, and IMC 0305, Operating Reactor Assessment Program.
The transition of BF1 to the full oversight provided by the ROP has been a gradual-phased approach on an individual cornerstone basis pursuant to the guidance of IMC 2509 until all safety cornerstones were deemed monitorable by the ROP. This phased in approach was necessary because the NRCs standard process for regulatory oversight (i.e., ROP) was only applicable for operating reactors, and not for a plant in an extended shutdown condition due to corrective action and performance based deficiencies that were outside the scope of IMC 2515.
By letter dated December 29, 2004, the NRC did transition the Occupational Radiation Safety, Public Radiation Safety, Emergency Preparedness, and Physical Protection safety cornerstones to the ROP. These cornerstones involved site-wide functions and responsibilities that were deemed ready to be monitored by the ROP. The other three remaining safety cornerstones (i.e., Initiating Events (IE), Mitigating Systems (MS), and Barrier Integrity(BI))
could not be transitioned at that time due to the numerous and complex BF1 specific issues that directly affected the capability of associated safety significant systems and components. The transition of these remaining cornerstones was not possible until all BF1 restart-related modifications and testing were completed and verified pursuant to IMC 2509.
During the BF1 Restart Project, the NRC dispositioned Unit 1 inspection findings in accordance with the traditional enforcement process for determining the significance of violations and any resultant enforcement actions. The BF1 Restart Project was not considered to fall within the
TVA 2
scope of the Commission's current Enforcement Policy. However, for each of the aforementioned BF1 safety cornerstones transitioned into the ROP, the NRC utilized the IMC 0609, "Significance Determination Process" (SDP), to characterize the significance of findings resulting from the routine inspection effort of IMC 2515 for that cornerstone. Additionally, the enforcement for any findings from NRC inspections of these cornerstones was administered in accordance with the Commissions current Enforcement Policy. Furthermore, for the BF1 cornerstones under the ROP, the IMC 0608, Performance Indicator Program, was also utilized to evaluate and process the Performance Indicator (PI) data submitted for that BF1 cornerstone.
After extensive reviews and inspections over the past several years, and completion of BF1 regulatory framework issues, the NRC authorized restart of BF1 on May 15, 2007. Furthermore, based on these reviews and inspections, the NRC also concluded that the remaining three safety cornerstones (i.e., IE, MS, BI) would be monitorable by the ROP once all outstanding BF1 restart issues were completed (see Enclosures 1, 2, and 3). Consequently, following the successful startup of BF1, the NRC oversight of BF1 for all cornerstones will now be conducted in accordance with the ROP. Effective at startup, BF1 is to now be considered fully transitioned to the ROP. All future oversight of BF1 will be conducted according to applicable IMCs (e.g.,
0305, 0608, 0609, 2515) instead of IMC 2509, and all future enforcement will be administered using the Commissions current Enforcement Policy.
Our ROP baseline inspection plans for this calendar year (CY) 2007, will be updated to reflect Browns Ferry as a site with three operating units. However, due to the lack of valid historical BF1 specific PI data for the IE, MS, and BI cornerstones, additional ROP baseline inspections will be necessary specifically for BF1. These inspections will augment the normal ROP baseline inspections for a three unit site, in order to compensate for the lack of valid PI data for the BF1 IE, MS, and BI cornerstones. Additional ROP baseline inspections of this nature are only an interim substitute for the applicable PIs. They will be conducted only until the NRC has determined that sufficiently accurate PI data exists to enable us to arrive at objective conclusions about the performance of BF1 in accordance with IMC 0305. In the mean time, even with these additional inspections, the PI data for the three BF1 cornerstones (i.e., IE, MS, and BI) should be submitted, according to IMC 0608 and industry guidance, commencing with the third quarter of CY 2007.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html the Public Electronic Reading Room).
TVA 3
Please contact me at 404-562-4550 or Thierry Ross, Senior Resident Inspector, at 256-729-6196, if you have any questions regarding full transition of BF1 safety cornerstones to the ROP.
Sincerely,
/RA/
Malcolm Widmann, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket No.: 50-259 License No.: DPR-33
Enclosure:
- 1. IP&S Report Transition Matrix-Mitigating Systems Cornerstone
- 2. IP&S Report Transition Matrix-Initiating Events Cornerstone
- 3. IP&S Report Transition Matrix-Barrier Integrity Cornerstone cc w/encl: (See page 4)
TVA 3
Please contact me at 404-562-4550 or Thierry Ross, Senior Resident Inspector, at 256-729-6196, if you have any questions regarding full transition of BF1 safety cornerstones to the ROP.
Sincerely,
/RA/
Malcolm Widmann, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket No.: 50-259 License No.: DPR-33
Enclosure:
- 1. IP&S Report Transition Matrix-Mitigating Systems Cornerstone
- 2. IP&S Report Transition Matrix-Initiating Events Cornerstone
- 3. IP&S Report Transition Matrix-Barrier Integrity Cornerstone cc w/encl: (See page 4)
OFFICE DRP/RII DRP/RII DRP/RII NRR DRP/RII NRR/DIRS DCI/RII SIGNATURE TMR /via email/
TXN /RA/
MTW /RA/
TJM /via email for/
JWS /RA/
EEC /via email/
MSL /via email/
NAME TRoss TNazario MWidmann CHaney JShea ECollins MLesser DATE 05/14/2007 05/15/2007 05/16/2007 05/08/2007 05/16/2007 05/08/2007 05/07/2007 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO PUBLIC DOCUMENT YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: C:\\FileNet\\ML071360301.wpd
TVA 4
cc w/encl:
Ashok S. Bhatnagar Senior Vice President Nuclear Operations Tennessee Valley Authority Electronic Mail Distribution Larry S. Bryant, Vice President Nuclear Engineering &
Technical Services Tennessee Valley Authority Electronic Mail Distribution Brian O'Grady Site Vice President Browns Ferry Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution Preston D. Swafford Senior Vice President Nuclear Support Tennessee Valley Authority Electronic Mail Distribution General Counsel Tennessee Valley Authority Electronic Mail Distribution John C. Fornicola, General Manager Nuclear Assurance Tennessee Valley Authority Electronic Mail Distribution Bruce M. Aukland, Plant Manager Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609 Electronic Mail Distribution Robert H. Bryan, Jr., General Manager Licensing & Industry Affairs Tennessee Valley Authority Electronic Mail Distribution William D. Crouch, Manager Licensing and Industry Affairs Browns Ferry Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution Beth A. Wetzel, Manager Corporate Nuclear Licensing and Industry Affairs Tennessee Valley Authority 4X Blue Ridge 1101 Market Street Chattanooga, TN 37402-2801 State Health Officer Alabama Dept. of Public Health RSA Tower - Administration Suite 1552 P. O. Box 303017 Montgomery, AL 36130-3017 Chairman Limestone County Commission 310 West Washington Street Athens, AL 35611 Masoud Bajestani, Vice President Browns Ferry Unit 1 Restart Browns Ferry Nuclear Plant Tennessee Valley Authority P. O. Box 2000 Decatur, AL 35609 Robert G. Jones, General Manager Browns Ferry Site Operations Browns Ferry Nuclear Plant Tennessee Valley Authority P. O. Box 2000 Decatur, AL 35609 Distribution w/encl: (See page 5)
TVA 5
Letter to Preston D. Swafford from Malcolm Widmann dated May 16, 2007.
SUBJECT:
FULL TRANSITION TO THE REACTOR OVERSIGHT PROCESS - BROWNS FERRY NUCLEAR PLANT UNIT 1 E-Mail Distribution PMNS Region II Administrators Secretaries DRP Division Secretary Region II Division Directors and Deputies J. Dyer, NRR C. Evans, Regional Counsel R. Trojanowski, Region II State Liaison Officer K. Clark, Region II Public Affairs Officers R. Hannah, Region II Public Affairs Officer J. Coleman, Region II Resource Management Branch Chief Region II Receptionist S. Campbell, Region II Regional Coordinator OEDO E. Brown, NRR T. Boyce, NRR Headquarters Operations Officer PUBLIC C. Haney, NRR M. Lesser, RII J. Shea, RII L. Mellen, RII T. Nazario, RII T. McGinty, NRR W. Bearden, RII T. Ross, RII C. Stancil, RII