Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20199K260 + (Frowards CNWRA 97-007, Parametric Study of Drift Stability in Jointed Rock Mass,Phase Ii:Discrete Element Dynamic Analysis of Unbackfilled Drifts)
- ML20147E834 + (Frowards Certificate for Jp Claassen,Newly Licensed Individual at Veterans Affairs Med Ctr.W/O Encl)
- ML20138A632 + (Frowards Copy of Revised Erosion Protection,Diversion Channels & Copy of Associated Draft Bluelines for Umtra Projects Upper Burbank Repository Located at Uravan,Co. W/O Encls)
- ML20235W738 + (Frowards Endorsement 84 to Nelia Policy NF-226 & Endorsement 72 to Maelu Policy MF-87)
- ML17249A212 + (Frowards LER 79-019/03L-0)
- 05000244/LER-1979-019, Frowards LER 79-019/03L-0 + (Frowards LER 79-019/03L-0)
- NUREG/CR-5938, Frowards NUREG/CR-5938 Entitled, Natl Profile on Commercially Generated Low-Level Radioactive Mixed Waste. W/O Encl + (Frowards NUREG/CR-5938 Entitled, Natl Profile on Commercially Generated Low-Level Radioactive Mixed Waste. W/O Encl)
- BVY-93-124, Frowards Preliminary Intended Rev to FSAR Figure 2.2-5. Proposed Change 170 Submitted to NRC to Update Licensee Tech Specs W/Recent Changes to 10CFR20 + (Frowards Preliminary Intended Rev to FSAR Figure 2.2-5. Proposed Change 170 Submitted to NRC to Update Licensee Tech Specs W/Recent Changes to 10CFR20)
- ML20147D815 + (Frowards Rept of Proposed Activities in Non-Agreement States & Agreement State License.License Valid for Activities & Devices Described & for Time Frame Requested)
- ST-HL-AE-4993, Frowards Response to NRC Re Violations Noted in Insp Rept 50-498/94-35.Corrective Actions:Review of Surveillance Test Packages for Potentially Impacted Breakers Was Performed on 941209 + (Frowards Response to NRC Re Violations Noted in Insp Rept 50-498/94-35.Corrective Actions:Review of Surveillance Test Packages for Potentially Impacted Breakers Was Performed on 941209)
- ML19332G195 + (Frowards Rev 0 to Yankee Cycle 20 Core Operating Limits Rept)
- ML17228A835 + (Frowards Rev 1 to JNS-PSL-204, Second Ten-Yr ISI Interval IST Program for Pumps & Valves,St Lucie Nuclear Power Plant Unit 2. Response to Open Items Noted in 930823 SE of IST Program Also Encl)
- L-94-212, Frowards Rev 1 to JNS-PSL-204, Second Ten-Yr ISI Interval IST Program for Pumps & Valves,St Lucie Nuclear Power Plant Unit 2. Response to Open Items Noted in 930823 SE of IST Program Also Encl + (Frowards Rev 1 to JNS-PSL-204, Second Ten-Yr ISI Interval IST Program for Pumps & Valves,St Lucie Nuclear Power Plant Unit 2. Response to Open Items Noted in 930823 SE of IST Program Also Encl)
- ML20010H664 + (Frowards Status Rept on Open SER Items.Supplemental SER Input Requested by 810922.Importance of Financial Qualifications Stressed)
- NSD-NRC-98-5627, Frowards W Responses to Four ITAAC Meeting Open Items Re Comments from Plant Sys Branch on Rev 3 of AP600 Certified Design Matl + (Frowards W Responses to Four ITAAC Meeting Open Items Re Comments from Plant Sys Branch on Rev 3 of AP600 Certified Design Matl)
- 05000498/LER-2021-001, Frozen Common Sensing Line Results in Loss of Two Main Feedwater Pumps Leading to Automatic Reactor Protection and Auxiliary Feedwater Systems Actuations Due to Low Steam Generator Level + (Frozen Common Sensing Line Results in Loss of Two Main Feedwater Pumps Leading to Automatic Reactor Protection and Auxiliary Feedwater Systems Actuations Due to Low Steam Generator Level)
- ML17320A645 + (Frozen Ice Condenser Intermediate Deck Doors, AEOD Engineering Evaluation Rept)
- ML21314A200 + (Frt - Notice of Availability of the Draft Supplemental Environmental Impact Statement for Subsequent License Renewal of Point Beach Nuclear Plant, Units 1 and 2)
- ML19316C918 + (Frtr - NRC Staff Experience with Conceptual Site Models from Development and Testing to Lessons Learned)
- ML18172A194 + (Frwg Fee Exemption Request for Activities Performed for Review of Frwg 18-01)
- ML19093B766 + (Frwg Presentation for March 28, 2019 for Advanced Reactors Stakeholder Public Meeting)
- ML19209C280 + (Fsar,Amend 37, Fftf Tech Specs,Chapter 17 Revisions)
- ML15100A052 + (Fsaru R21 Drawings (Redacted). Part 1 of 2)
- ML15114A321 + (Fsaru R21 Drawings (Redacted). Part 2 of 2)
- ML15100A057 + (Fsaru R21 File B Cd Drawing (Redacted))
- ML061000687 + (Fsb Sample Log)
- ML16287A533 + (Fssfr Volume 6, Chapter 2: Groundwater Monitoring Results During Remediation)
- ML20116A466 + (Fsv Final Survey Exposure Rate Measurements)
- ML20112C153 + (Fsv Final Survey Exposure Rate Measurements)
- ML24340A113 + (Fsv License Amendment Request to Update the Licensee Designation of Authority Title - Acknowledgment of Submittal (Docket No. 72-0009; Materials License No. SNM-2504))
- ML19323F131 + (Ft Calhoun Cycle 6 Small Break ECCS Performance Evaluation at 1500MW)
- IR 05000285/2016201 + (Ft Calhoun Station - NRC Security Inspection Report 05000285/2016201)
- ML23256A279 + (Ft Calhoun Station Unit 1 - 2nd Set of RAI on LAR for Approval of License Termination Plan)
- ML021190162 + (Ft Calhoun, Amd 208, TS Pages Revising Technical Specifications 2.15(5) and 2.15(6), Instrumentation and Control System)
- ML060100141 + (Ft Calhoun, Letter, Response to Request for Extension to Completion Date for Corrective Action to GL 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors)
- ML20266F489 + (Ft St Vrain 2500 Kva Xfmr Foundations & Details. Sheet 2 of 2)
- ML20266F484 + (Ft St Vrain 2500 Kva Xfmr Foundations & Details. Sheet 1 of 2.No Rev Date)
- ML20262E589 + (Ft St Vrain Plot Plan. Sheet 1 of 1.Drawing Consists of Two Aperture Cards)
- ML042680277 + (Ft. Calhoun - Security Plan Provisions for Enhanced Owner Controlled Area Surveillance and Response)
- ML24107B127 + (Ft. Calhoun Meeting Summary of March 27, 2024 Meeting with Omaha Public Power District on Submittal of Phase 1 Final Status Surveys)
- LIC-10-0027, Ft. Calhoun Station Unit 1 Annual Report for 2009 Loss of Coolant Accident (Loca)/Emergency Core Cooling System (ECCS) Models Pursuant to 10 CFR 50.46 + (Ft. Calhoun Station Unit 1 Annual Report for 2009 Loss of Coolant Accident (Loca)/Emergency Core Cooling System (ECCS) Models Pursuant to 10 CFR 50.46)
- LIC-02-0042, Ft. Calhoun Station, Unit 1 - LRA Technical Information - Aging Management Review + (Ft. Calhoun Station, Unit 1 - LRA Technical Information - Aging Management Review)
- ML022180618 + (Ft. Calhoun Station, Unit 1 - License Renewal Application - Technical Information)
- ML023310684 + (Ft. Calhoun Station, Unit 1, Technical Specification Pages for Amendment 212, Steam and Feedwater Systems)
- ML072000416 + (Ft. Calhoun Surveillance Test Procedure Excerpts)
- ML060260548 + (Ft. Calhoun Unit 1 - Request for Additional Information Related to Extension Date for Corrective Actions GL 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors)
- ML040860157 + (Ft. Calhoun, RAI on License Amendment Request Related to Staggered Integrated Engineered Safety Features Testing)
- ML043170494 + (Ft. Calhoun, Request for Additional Information Regarding SG Inspections)
- ML12062A039 + (Ft. Calhoun, Single Positive Test Form, for Pre-Access, Collected on 11/21/2011)
- ML12062A036 + (Ft. Calhoun, Single Positive Test Form, for Pre-Access, Collected on 09/01/2011)
- ML12062A047 + (Ft. Calhoun, Single Positive Test Form, for Random, Collected on 04/11/2011)