ML19316C918

From kanterella
Jump to navigation Jump to search
Frtr - NRC Staff Experience with Conceptual Site Models from Development and Testing to Lessons Learned
ML19316C918
Person / Time
Issue date: 11/13/2019
From: Andrea George
Division of Decommissioning, Uranium Recovery and Waste Programs
To:
References
Download: ML19316C918 (19)


Text

George Alexander Risk and Technical Analysis Branch &

Uranium Recovery and Materials Decommissioning Branch Division of Decommissioning, Uranium Recovery, and Waste Programs Office of Nuclear Material Safety and Safeguards U.S. NRC Staff Experience with Conceptual Site Models from Development and Testing to Lessons Learned November 13, 2019

Adapted from NUREG 1757 Vol 2. Rev.1 Development of conceptual models is a subjective process based on interpretation of often limited site data. Key issues in developing the conceptual site model:

(a) identifying the important site features, events, and processes that need to be included in the conceptual model; (b) deciding among possible competing interpretations of the site data; and (c) determining the level of detail needed to describe those features and processes Adapted from ASTM E1689.6648 Conceptual Site Model - a written or pictorial representation of an environmental system and the biological, physical, and chemical processes that determine the transport of contaminants from sources through environmental media to environmental receptors within the system.

Definition and Development of Conceptual Site Models 2

Outline of Conceptual Site Model

  • Site Information - Historical and Current Site-Related Activities
  • Determination of Background Concentrations for Contaminants of Concern
  • Characterization of Source Term
  • Transport pathways to the accessible environment
  • Potential Receptors 3

Adapted from ASTM E1689.6648 Standard Guide for Developing Conceptual Site Models for Contaminated Sites

4 Site Information: Site Layout Site history o Mill operated from 1958-1990 o Groundwater restoration began in 1977 Large and small tailings piles Network of injection and extraction wells Three Evaporation Ponds (EP1, EP2, EP3)

Two collection ponds Reverse Osmosis (RO) and Zeolite groundwater treatment facilities Adjacent communities Adapted from Google Earth

5 Often limited historical data (i.e., pre-operational)

Natural variability of hydrogeologic parameters and geochemistry Collection of information Determination of Background Adapted from USGS Publications:

Harte et al., 2019 (ADAMS Accession No. ML19050A424)

Blake et al., 2019 (ADAMS Accession NO. ML19289C422)

Review of background concentrations by EPA with USGS field studies & analyses Concurrent review by Homestake of the data Geophysical and geochemical analyses by USGS Upgradient sources

7 Differentiating between natural vs anthropogenic sources Monitoring wells o

Location o

Quantity o

Completion records o

Integrity Determination of Background Adapted from 2018 Annual Monitoring Report/Performance Review for Homestakes Grants Project (ADAMS Accession No. ML19101A370)

8 Determination of Background Bluewater Site Adapted from 2017 Uranium Plumes in the San Andres-Glorieta and Alluvial Aquifers At the Bluewater, New Mexico, Disposal Site (ADAMS Accession No. ML19081A121)

9 Source Term Historical placement can affect site stability and contaminant release Composition of tailings can affect contaminant release and transport Slimes consolidation and seepage is a long-term process Uncertainties o

Infiltration rate o

Chemical composition o

Solubilities o

Seepage/drainage rate with time Adapted from 2018 Annual Monitoring Report/Performance Review for Homestakes Grants Project (ADAMS Accession No. ML19101A370)

Site Characterization 10 Complex subsurface Series of underlying aquifers Paleochannels Differing flow directions Subcropping of aquifers Mixing of aquifers Faulting Adapted from 2018 Annual Monitoring Report/Performance Review for Homestakes Grants Project (ADAMS Accession No. ML19101A370)

Site Characterization 11 Adapted from 2018 Annual Monitoring Report/Performance Review for Homestakes Grants Project (ADAMS Accession No. ML19101A370)

Site Characterization 12 Adapted from 2018 Annual Monitoring Report/Performance Review for Homestakes Grants Project (ADAMS Accession No. ML19101A370)

13 Site Characterization Adapted from 2016 Expanded TPP Pilot Test in the Alluvial Aquifer: Summary Report for Grants Reclamation Project (ADAMS Accession No. ML16351A351)

Heterogeneity of the alluvium Characterization -

How much?

Abstraction/

Simplification -

To what extent?

Representation of key features Effective continuum vs Dual porosity/

permeability

Groundwater Restoration 14 Transport pathways Restoration began in 1977 NRC approved Groundwater Corrective Action Plan in 1989 Communities o

Involvement o

Public water supply o

Well prohibition Upcoming revision to the Groundwater Correction Action Plan Adapted from 2018 Annual Monitoring Report/Performance Review for Homestakes Grants Project (ADAMS Accession No. ML19101A370)

Groundwater Restoration - Source & Plume Control Alluvial Groundwater Collection and Injection Wells 15 Adapted from 2018 Annual Monitoring Report/Performance Review for Homestakes Grants Project (ADAMS Accession No. ML19101A370)

  • Five Components o Source control o Plume control o Reverse Osmosis o Evaporation o Land Application
  • Evolution of activities o Injection wells o Extraction wells o Monitoring wells o Zeolite systems o Evaporative Capacity
  • Performance Monitoring o Groundwater plume o Radon o Evaporation Pond leakage o Erosion

Operational Flows Adapted from 2018 Annual Monitoring Report/Performance Review for Homestakes Grants Project (ADAMS Accession No. ML19101A370) 16

Alluvial Groundwater Uranium Concentration 1999 17 Adapted from 2018 Annual Monitoring Report/Performance Review for Homestakes Grants Project (ADAMS Accession No. ML19101A370)

Alluvial Groundwater Uranium Concentration 2014 18 Adapted from 2018 Annual Monitoring Report/Performance Review for Homestakes Grants Project (ADAMS Accession No. ML19101A370)

Alluvial Groundwater Uranium Concentration 2018 19 Adapted from 2018 Annual Monitoring Report/Performance Review for Homestakes Grants Project (ADAMS Accession No. ML19101A370)

Lessons Learned The impacts due to conceptual model uncertainty can significantly exceed those due to parameter uncertainty Iterative process of collecting data, identifying potential scenarios, developing conceptual and numerical models, and analyzing results Obtain key data to support each conceptual site model and update as needed Communicate uncertainties with each conceptual site model The use of multiple independent modelers and reviewers (i.e., a structured peer review) can help to identify conceptual model uncertainty All conceptual site models that are consistent with available information should be evaluated Interactions with local communities provide information for the modelers as well as the stakeholders and help to build confidence.

20