Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20044D731 + (Fourteen-Day Rept of Reportable Event Re Inadvertent Mod of Univ of Virginia Reactor Console)
- BSEP-80-2121, Fourteen-day Rept:On 801215,failure to Install Particulate Filter Holder Rendered Reactor Bldg Exhaust Monitor Inoperable.Caused by Personnel Error.Holder Replaced & Operating Procedures Revised to Ensure Monitor Checks + (Fourteen-day Rept:On 801215,failure to Install Particulate Filter Holder Rendered Reactor Bldg Exhaust Monitor Inoperable.Caused by Personnel Error.Holder Replaced & Operating Procedures Revised to Ensure Monitor Checks)
- NLS2025024, Fourteenth Biennial Report on Financial Assurance for Decommissioning in Accordance with 10 CFR 50.75(0(1) + (Fourteenth Biennial Report on Financial Assurance for Decommissioning in Accordance with 10 CFR 50.75(0(1))
- L-13-190, Fourteenth Inservice Inspection Summary Report + (Fourteenth Inservice Inspection Summary Report)
- NL-08-1592, Fourteenth Maintenance/Refueling Outage Steam Generator Tube Inspection Report + (Fourteenth Maintenance/Refueling Outage Steam Generator Tube Inspection Report)
- ML20071A247 + (Fourteenth Motion for Summary Disposition of Contention Necnp I.D.3 Re Compliance W/Gdc 30.No Genuine Issue of Matl Fact Exists & Applicant Entitled to Favorable Decision. Related Correspondence)
- ML20198K635 + (Fourteenth Partial Response to FOIA Request for Documents. Forwards Documents Listed in App T.Documents Will Be Placed in Pdr.Documents in App U Will Be Maintained in PDR Under Stated Request Number)
- ML20234C897 + (Fourteenth Partial Response to FOIA Request for Documents Re Allegations at Plant.Documents Listed in App M Already Available in Pdr.Documents Listed in Apps N & O Withheld in Entirety (Ref FOIA Exemption 7))
- ML20147H297 + (Fourteenth Partial Response to FOIA Request for Documents. Forwards Documents Listed in App W.Documents Will Be Placed in Pdr.App B Documents Being Withheld Completely (Ref FOIA Exemption 5.))
- ML20148G497 + (Fourteenth Partial Response to FOIA Request for Documents on Allegations Re Plant Operation.Encl App U & V Documents Also Available in PDR & Lpdr Located in San Luis Obispo,Ca.App V Documents Partially Withheld (Ref FOIA Exemption 6))
- ML20148G500 + (Fourteenth Partial Response to FOIA Request for Documents on Allegations Re Plant Operation.Encl App U & V Documents Also Available in PDR & Lpdr Located in San Luis Obispo,Ca.App V Documents Partially Withheld (Ref FOIA Exemption 6))
- ML20059E883 + (Fourteenth Quarterly Rept,Cleveland Electric Illuminating Co Seismic Monitoring Network,Jan-June 1990. W/Three Oversize Drawings)
- CP-201401268, Fourteenth Refueling Outage (2RF14) Steam Generator 180 Day Report + (Fourteenth Refueling Outage (2RF14) Steam Generator 180 Day Report)
- L-10-020, Fourteenth Refueling Outage Inservice Inspection Report + (Fourteenth Refueling Outage Inservice Inspection Report)
- PLA-6078, Fourteenth Refueling Outage Owners Activity Report + (Fourteenth Refueling Outage Owners Activity Report)
- ML061780167 + (Fourteenth Refueling Outage Reactor Head Visual Inspection Results)
- BW090068, Fourteenth Refueling Outage Steam Generator Inservice Inspection Summary Report + (Fourteenth Refueling Outage Steam Generator Inservice Inspection Summary Report)
- ML20073R699 + (Fourteenth Set of Interrogatories & Requests to Produce. Related Correspondence)
- ML20112C917 + (Fourteenth Set of Interrogatories,Pertaining to Issue 16 Re Tdi Diesel Generators & Request for Production of Documents. Certificate of Svc Encl.Related Correspondence)
- ND-20-1003, Fourteenth Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049) + (Fourteenth Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049))
- ML20244A156 + (Fourteenth Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049))
- ML20244A157 + (Fourteenth Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049))
- ML20203J447 + (Fourth & Final Response to FOIA Request for Documents. Records in App K Already Available in PDR & App L Records Being Made Available in PDR & Encl)
- ML22027A804 + (Fourth (Post-Audit) Supplement to Request for License Amendment and Regulatory Exemptions for a Risk-Informed Approach to Address GSI-191 and Respond to GL 2004-02 (LDCN 19-0014))
- ML22027A805 + (Fourth (Post-Audit) Supplement to Request for License Amendment and Regulatory Exemptions for a Risk-Informed Approach to Address GSI-191 and Respond to GL 2004-02 (LDCN 19-0014))
- NL-05-0847, Fourth 10 -Year Interval IST Program Update + (Fourth 10 -Year Interval IST Program Update)
- SBK-L-21126, Fourth 10 Year Interval - Inservice Inspection (ISI) Program Plan + (Fourth 10 Year Interval - Inservice Inspection (ISI) Program Plan)
- L-2008-181, Fourth 10 Year Interval Inservice Inspection Program, Response to Request for Additional Information for Risk Informed Inservice Inspection (RI-ISI) Relief Requests 3 and 4 + (Fourth 10 Year Interval Inservice Inspection Program, Response to Request for Additional Information for Risk Informed Inservice Inspection (RI-ISI) Relief Requests 3 and 4)
- ML102510245 + (Fourth 10-Year Inservice Inspection Interval Program, Nondestructive Examination, Relief Request, NDE-001,)
- 1CAN041002, Fourth 10-Year Inservice Inspection Interval, Request for Alternative ANO1-R&R-013, Repairs to the Pressurizer Instrumentation Penetrations + (Fourth 10-Year Inservice Inspection Interval, Request for Alternative ANO1-R&R-013, Repairs to the Pressurizer Instrumentation Penetrations)
- ML110260022 + (Fourth 10-Year Inservice Inspection Interval, Relief Request N2-I4-CS-001)
- ML110050003 + (Fourth 10-Year Inservice Inspection Interval (ISI) Program, Relief Request (RR) N1-14-R1-001 and N2-14-R1-001)
- ML050560049 + (Fourth 10-Year Inservice Inspection Interval Request for Relief to Use Code Case N-661)
- ML15131A395 + (Fourth 10-Year Inservice Inspection Interval Relief Request No. 2)
- NG-11-0320, Fourth 10-Year Inservice Inspection Plan + (Fourth 10-Year Inservice Inspection Plan)
- NG-06-0439, Fourth 10-Year Inservice Inspection Plan + (Fourth 10-Year Inservice Inspection Plan)
- ML092530274 + (Fourth 10-Year Inservice Inspection Plan - Nondestructive Examination)
- ML092230647 + (Fourth 10-Year Inservice Inspection Plan-Nondestructive Examination)
- ML091350058 + (Fourth 10-Year Inservice Inspection Program - Relief Request CS-001 for Snubber Visual Examination and Functional Testing)
- ML050380305 + (Fourth 10-Year Inservice Testing Interval Program Requests for Relief)
- NL-05-0726, Fourth 10-Year Interval IST Program Update + (Fourth 10-Year Interval IST Program Update)
- NL-18-1384, Fourth 10-Year Interval Inservice Inspection Program ISI Program Update: Notification of Impractical ASME Code Requirements + (Fourth 10-Year Interval Inservice Inspection Program ISI Program Update: Notification of Impractical ASME Code Requirements)
- EPID:L-2018-LLR-0195 + (Fourth 10-Year Interval Inservice Inspection Program ISI Program Update: Notification of Impractical ASME Code Requirements)
- ML062260217 + (Fourth 10-Year Interval Inservice Inspection Request for Relief No. PR-06)
- ML102510218 + (Fourth 10-Year Interval Inservice Inspection (ISI) Program, System Pressure Testing (Spt), SPT-001 Through SPT-006 (TAC Nos. ME3311 Thru ME3316))
- ML061780172 + (Fourth 10-Year Interval Inservice Inspection Program Plan, Relief Request No. 13)
- ML062260195 + (Fourth 10-Year Interval Inservice Inspection Request for Relief No. PR-02)
- ML11136A138 + (Fourth 10-Year Interval Inservice Inspection Program Plan Relief Request No. 4 and Third 10-Year Interval Inservice Inspection Program Plan Relief Request No. 11)
- ML082760752 + (Fourth 10-Year Interval Inservice Inspection Request Relief PT-02 for Proposed Alternative Inspection for Standby Gas Treatment System)
- ML11320A122 + (Fourth 10-Year Interval Inservice Inspection Program, Non Destructive Examination, NDE-003)
- NL-05-2118, Fourth 10-Year Interval Inservice Inspection (ISI) Program Request for ISI Alternative + (Fourth 10-Year Interval Inservice Inspection (ISI) Program Request for ISI Alternative)