NL-05-0847, Fourth 10 -Year Interval IST Program Update
| ML051320361 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 05/09/2005 |
| From: | Sumner H Southern Nuclear Operating Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NL-05-0847 | |
| Download: ML051320361 (3) | |
Text
-
t H. L Sumner, Jr.
Southern Nuclear Vice President Operating Company, Inc.
Hatch Project Post Office Box 1295 Birmingham. Alabama 35201 Tel 205.992.7279 SOUTHERN A May 9, 2005 COMPANY Energy to Serve Your World Docket Nos.:
50-321 NL-05-0847 50-366 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Edwin 1. Hatch Nuclear Plant Fourth 1 0-Year Interval 1ST Program Update Ladies and Gentlemen:
By letter dated April 20, 2005 Southern Nuclear Operating Company (SNC) submitted Inservice Testing Relief Request RR-P-1. Subsequently, SNC discovered that the incorrect group designation had been shown for Residual Heat Removal (RHR) and Residual Heat Removal Service Water (RHRSW) pumps on pages 4 of 9 and 6 of 9 of RR-P-1. The only changes are RHR and RHRSW pumps being classified as Group A pumps instead of Group B pumps. The corrected pages are enclosed.
This letter contains no NRC commitments. If you have any questions, please advise.
Sincerely, H. L. Sumner, Jr.
HLS/ifl/daj
Enclosures:
Relief Request RR-P-I pages 4 of 9 and 6 of 9 cc:
Southern Nuclear Operating Company Mr. J. T. Gasser, Executive Vice President Mr. G. R. Frederick, General Manager - Plant Hatch RTYPE: CHAO2.004 U. S. Nuclear Regulatorv Commission Dr. W. D. Travers, Regional Administrator Mr. C. Gratton, NRR Project Manager - Hatch Mr. D. S. Simpkins, Senior Resident Inspector - Hatch
I RR-P-1 PUMP TABLE 1 - UNIT 1 MPL No./OM DESIGN DATA ACCIDENT DATA REFERENCE IST Qr REMARKS Code Group_
IC41-COOIA 43 gpm at 1190 psig 41.2 gpm at 21232 (1) HNP-2 FSAR 44 gpm Quarterly IST performed at 2 Group B psig Table 15.4-1 Accident required flow rate.
(2) Tech Spec SR 3.1.7.7 IC41-COOIB Same as lC41-Same as IC41-Same as lC41-43.1 gpm Same as IC41-COOIA Group B COOlA COOIA COOIA lEl 1-COOIA 4000 gpm at 955-ft 2 4000 gpm (1) HNP-1 FSAR 4000 Quarterly IST performed at Group A TDH Table 10.6-1 gpm Accident required flow rate.
(2) Tech Spec Bases 3.7.1 IEI I-COOIB Same as lEl l-Same as EI I-Same as EI I-4000 Same as ElI I-COOIA Group A COOIA COOIA COOIA 9p1 lE11 -COOIC Same as ElI I-Same as EI I-Same as IEI I-4000 Same as IEI I-COOIA Group A COOIA COOIA COOlA gpm lE11-COOID Same as E11l-Same as lEI I-Same as EI I-4000 Same as EIl I-COOIA Group A COOIA COOIA COOIA gpm IEI -CO02A 7700 gpm at 420-ft (1) 6900 gpm (1) HNP-2 FSAR 7700 Quarterly IST performed at 2 Group A TDH (2) Ž17000 gpm for Table 6.2-3 gpm individual pump Accident required 2 pumps with RPV 2 (2) Tech Spec 3.5.1.7 flow rate plus Refueling Outage 20 psig IST at a 2-pump/train flow rate of
> 17,000 gpm at AP 2 158 psid.
IEIl-CO02B Same as lEll-Same as IEI I-Same as IEl I-7700 Same as IEI I-CO02A Group A C002A C002A C002A gpm lE I-CO02C Sameas lEII-Sameas IEI-Sameas I1ll-7700 Sameas lEll-C002A Group A C002A C002A C002A 9pm lElI-CO02D Same as lEll-Same as lElI -
Same as lEl l-7700 Same as IEI I-CO02A Group A C002A C002A C002A gpm Page 4 of 9
RR-P-1 PUMP TABLE 1 - UNIT 2 MPL No.
DESIGN DATA ACCIDENT DATA REFERENCE IST Qr REMARKS 2C41-COOIA 43 gpm at 1190 psig 41.2 gpm at 21232 (1) HNP-2 FSAR 44.6 Quarterly IST performed at 2 Group B psig Table 15.4-1 Accident required flow rate.
(2) Tech Spec SR 3.1.7.7 2C41-COOIB Same as 2C41-Same as 2C41 -
Same as 2C41-43.1 Same as 2C41-COO1A Group B COOIA COOtA COOlA 2El 1-COOIA 4000 gpm at 955-ft 2 4000 gpm (1) HNP-1 FSAR 4000 Quarterly IST performed at Group A TDH Table 10.6-1 Accident required flow rate.
(2) Tech Spec Bases 3.7.1_
2E1 l-COOlB Same as 2EI I-Same as 2E1 I-Same as 2E1 1-4000 Same as 2E1 l-COOlA Group A COOlA COOIA COOIA 2El l-COOlC Same as 2E1 1-Same as 2E1 1-Same as 2E1 1-4000 Same as 2E1 1-COOlA Group A COOlA COOIA COOlA 2E1 l-COOlD Same as 2E1 1-Same as 2E1 1-Same as 2El 1-4000 Same as 2El 1-COOIA Group A COOlA COOIA COOIA 2El l-C002A 7700 gpm at 420-ft (1) 6900 gpm (1) HNP-2 FSAR 7700 Quarterly IST performed at 2 Group A TDH (2) Ž17000 gpm for Table 6.2-3 individual pump Accident required 2 pumps with RPV 2 (2) Tech Spec 3.5.1.7 flow rate plus Refueling Outage 20 psig IST at a 2-pump/train flow rate of
> 17,000 gpm at AP 2 158 psid.
2E1 I-C002B Same as 2E1 1-Same as 2E1 I-Same as 2E1 I-7800 Same as 2E1 1-CO02A Group A C002A C002A C002A 2El l-C002C Same as 2EI I-Same as 2E1 I-Same as 2E1 I-7700 Same as 2EI I-CO02A Group A C002A C002A C002A 2EI I-COO2D Same as 2E1 1-Same as 2EI I-Same as 2E1 I-7700 Same as 2E1 I-C002A Group A C002A C002A C002A Page 6 of 9