Fourteenth Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049)
ML20244A157
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 08/28/2020
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML20244A156 List:
References
EA-12-049, ND-20-1003
Download: ML20244A157 (4)


Text

Michael J. Yox 7825 River Road Southern Nuclear Regulatory Affairs Director Waynesboro, GA 30830 Vogtle 3&4 706 848 6459 tel myox@southernco.com August 28, 2020 Docket Nos.: 52-025 ND-20-1003 52-026 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Vogtle Electric Generating Plant - Units 3 and 4 Fourteenth Six-Month Status Report of the implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Desiqn-Basis External Events (EA-12-049)

References:

1^. NRC Order Number EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, dated March 12, 2012.

2. NRC Interim Staff Guidance JLD-iSG-2012-01, Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, Revision 0, dated August 29, 2012.
3. NEI 12-06, Diverse and Flexible Coping Strategies(FLEX)Implementation Guide, Revision 0, dated August 2012.
4. SNC Letter ND-13-1702, Vogtle Electric Generating Plant Units 3 and 4 Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events(Order Number EA-12-049), dated August 22, 2013.
5. SNC Letter ND-20-0164, Vogtle Electric Generating Plant Units 3 and 4 Updated Overall Integrated Plan In Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049), dated May 15, 2020.

Ladies and Gentlemen:

On March 12, 2012, the Nuclear Regulatory Commission (NRC)issued an order (Reference 1) to Southern Nuclear Operating Company. Reference 1 was immediately effective and directed the Vogtle Electric Generating Plant - Units 3 and 4(VEGP 3&4) to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities in the event of a beyond-design-basis external event. Specific requirements are outlined in Attachment 3 of Reference 1.

Reference 1 required submission of an Overall Integrated Plan within one year after issuance of the final NRC Interim Staff Guidance (Reference 2). Reference 2 endorses industry guidance document NEI 12-06, Revision 0(Reference 3) with clarifications and exceptions identified in Reference 2. Reference 4 provided the original VEGP 3&4 Overall Integrated Plan. Reference 5 provided an updated VEGP 3&4 Overall Integrated Plan.

U. S. Nuclear Regulatory Commission ND-20-1003 Page 2 Reference 1 requires submission of a status report at six-month intervals following submlttai of the Overall integrated Plan. Reference 3 provides direction regarding the content of the status reports and was followed in developing the enclosed report. The purpose of this letter is to provide the Fourteenth six-month status report pursuant to Section IV, Condition C.2, of Reference 1, that delineates progress made in implementing the requirements of Reference 1.

The enclosed status report provides an update of milestone accomplishments since the last six-month update, including any changes to the compliance method, schedule, or need for relief and the basis, if any.

This letter contains no new regulatory commitments. This letter has been reviewed and determined not to contain security-related information.

If you have any questions, please contact Mr. Nick Kellenberger 706-437-2333.

I declare under penalty of perjury that the foregoing is true and correct. Executed on the 28 day of August 2020.

Respectfully submitted.

Michael J. Vox Vogtle 3&4 Regulatory Affairs Director Southern Nuclear Operating Company MJY/KMS/sfr

Enclosure:

Fourteenth Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events(EA-12-049)

U. S. Nuclear Regulatory Commission ND-20-1003 Page 3 go:

Southern Nuclear Operatino Company / Georgia Power Company Mr. S. E. Kuczynski (w/o enclosure)

Mr. P. P. Sena III (w/o enclosure)

Mr. M. D. Meier (w/o enclosure)

Mr. G. Chick Mr. S. Stimac Mr. P. Martino Mr. D. L. McKinney (w/o enclosures)

Mr. T. W. Yelverton (w/o enclosures)

Mr. B. H. Whitley Ms. C. A. Gayheart Ms. M. Ronnlund Mr. D. L. Fulton Mr. M. J. Vox Mr. C. T. Defnall Mr. J. Tuplk Ms. S. Agee M M. Humphrey Ms. A. C. Chamberlain M S. Leighty M N. Kellenberger M E. Riffle Ms. K. Roberts Mr. J. Haswell Mr. D. T. BIythe Mr. K. Warren Mr. A. S. Parton Document Services RTYPE: VND.LI.LOO File AR.01.02.06 Nuclear Regulatorv Commission Mr. M. King (w/o enclosure)

Ms. M. Bailey (w/o enclosure)

Mr. C. Patel Mr. C. Santos Mr. B. Kemker Mr. J. Eargle Mr. G. Khouri Mr. C. J. Even Mr. A. Lerch Mr. S. Walker Mr. N.D. Karlovich Ms. N. C. Coovert Mr. C. Welch Mr. J. Gaslevic Mr. V. Hall Ms. K. P. Carrington Mr. M. Webb

U. S. Nuclear Regulatory Commission ND-20-1003 Page 4 State of Georoia Mr. R. Dunn Oalethoroe Power Corporation Mr. M. W. Price Ms. A. Whaley Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. S. M. Jackson Dalton Utilities Mr. T. Bundros Westinohouse Electric Company. LLC Mr. L. Oriani (w/o enclosures)

Mr. T. Rubenstein (w/o enclosures)

Mr. M. Corletti Mr. D. Hawkins Mr. J. Coward Other Mr. 8. W. Kline, Bechtel Power Corporation Ms. L. A. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., GDS Associates, Inc.

Mr. S. Roetger, Georgia Public Service Commission Mr. R. L. Trokey, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. S. Blanton, Balch Bingham