Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Forwards Unit 2 Refueling 21 ISI Summary Rept for Form NIS-1". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • NPL-98-0866, Forwards Unit 1 Refueling 24 ISI Summary Rept for Form NIS-1, IAW ASME Section Xi,Subsection IWA-6230.Rept Reflects ISI Activities Conducted During First Exam of Third ten-year Interval at Pbnp,Unit 1  + (Forwards Unit 1 Refueling 24 ISI Summary Rept for Form NIS-1, IAW ASME Section Xi,Subsection IWA-6230.Rept Reflects ISI Activities Conducted During First Exam of Third ten-year Interval at Pbnp,Unit 1)
  • ML20245G197  + (Forwards Unit 1 Rev 12 & Unit 2 Rev 8 to Plant Pump & Valve Inservice Testing Program.Rev Corrects Typos & Other Errors in 881031 Revs 11 & 7 Program Submittal,Per Generic Ltr 89-04)
  • ML20005D950  + (Forwards Unit 1 Rev 13 & Unit 2 Rev 8 to Pump & Valve Inservice Testing Program,Consisting of Relief Request 89-04 Re Portable Vibration Instrumentation & Bearing Temp Measuring Requirements)
  • ML17310A745  + (Forwards Unit 1 SG Insp Rept)
  • ML17310A648  + (Forwards Unit 1 SG Tube Insp Plan, in Response to NRC 930819 Request.Encl Contains Initial Insp Scope,Criteria for Expanding Eddy Current Insp,Plans for Inspecting SG Secondary Side & Contigency Plans for Pulling Tubes)
  • ML17310A649  + (Forwards Unit 1 SG Tube Insp Plan, in Response to NRC 930819 Request.Encl Contains Initial Insp Scope,Criteria for Expanding Eddy Current Insp,Plans for Inspecting SG Secondary Side & Contigency Plans for Pulling Tubes)
  • ML19321B307  + (Forwards Unit 1 Special Startup Test Rept)
  • ML19321B308  + (Forwards Unit 1 Special Startup Test Rept.)
  • ML17303A844  + (Forwards Unit 1 Steam Generator Eddy Current Exam First Refueling Outage for Oct 1987, Special Rept)
  • ML17303A845  + (Forwards Unit 1 Steam Generator Eddy Current Exam First Refueling Outage for Oct 1987, Special Rept)
  • ST-HL-AE-5115, Forwards Unit 1 Summary Rept of Test Results Taken During Startup & Power Ascension  + (Forwards Unit 1 Summary Rept of Test Results Taken During Startup & Power Ascension)
  • ST-HL-AE-5344, Forwards Unit 1 Tech Specs 4.4.5.4.a.10,replacing Page 3 of 5 in Attachment 3 of Ltr  + (Forwards Unit 1 Tech Specs 4.4.5.4.a.10,replacing Page 3 of 5 in Attachment 3 of Ltr)
  • BSEP-97-0385, Forwards Unit 1 Typed Bases Page B 3/4 6-3,incorporating Power up-rate Amend 183 as Replacement & Addressing Administrative Error W/Typed Bases Page Submitted w/970115 Amend Request  + (Forwards Unit 1 Typed Bases Page B 3/4 6-3,incorporating Power up-rate Amend 183 as Replacement & Addressing Administrative Error W/Typed Bases Page Submitted w/970115 Amend Request)
  • ML20080L915  + (Forwards Unit 1 semi-annual Radioactive Effluent Release Rept for July-Dec 1994)
  • ML20092J840  + (Forwards Unit 1,Balance-of-Plant,Preservice Insp Program Plan & Unit 1,Reactor Pressure Vessel,Preservice Insp Program Plan, in Response to SER Outstanding Issue 4, Preservice & Inservice Testing Programs. W/O Encls)
  • ML20092J837  + (Forwards Unit 1,Balance-of-Plant,Preservice Insp Program Plan & Unit 1,Reactor Pressure Vessel,Preservice Insp Program Plan, in Response to SER Outstanding Issue 4, Preservice & Inservice Testing Programs. W/O Encls)
  • ML18033A721  + (Forwards Unit 2 ASME Section XI 80 Month Insp Rept,Listing Exams Performed from 840918 to 880707.Second 90-day Rept Addressing Cycle 5B Insps Will Be Provided to NRC within 90 Days After Unit 2 Restart)
  • ML20066E196  + (Forwards Unit 2 Core Exit Thermocouple Sys Implementation Rept on Inadequate Core Cooling Instrumentation,Per 870501 Commitment)
  • ML20210S596  + (Forwards Unit 2 Cycle 15 Startup Test Rept Summary for NRC Info & Use.Tests Comprise Subset of Overall Test Program & Submitted in Accordance W/Station Procedure Qctp 0920-04)
  • ML20117J245  + (Forwards Unit 2 Cycle 7 ISI Summary Rept That Contains Historial Record of Repairs,Replacements & ISI Exams & Augmented Exams That Were Performed on ASME Code Class 1 & 2 Components from 951216 to 960609)
  • ML20129H229  + (Forwards Unit 2 Cycle 7 Operating Limits Rept, Per GL 88-16)
  • ML20129H233  + (Forwards Unit 2 Cycle 7 Operating Limits Rept, Per GL 88-16)
  • ML19317H214  + (Forwards Unit 2 FSAR Vol Iv.Matl Will Provide Info for Core Protection Calculator Sys Review.W/O Encl)
  • ML20024B623  + (Forwards Unit 2 Plant Operations Review Committee Input for Special Rept Required by Tech Spec 3.5.2 for ECCS Actuation That Occurred on 780329)
  • ML20063C353  + (Forwards Unit 2 Refueling 19 ISI Summary Rept for Form NIS-1 & Unit 2 Refueling 19 Repair/Replacement Summary Rept for Form NIS-2)
  • NPL-99-0336, Forwards Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1, IAW ASME Section Xi,Subsection IWA-6230  + (Forwards Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1, IAW ASME Section Xi,Subsection IWA-6230)
  • 2CAN108610, Forwards Unit 2 SAR Figure 1.2-3,omitted from Amend Package  + (Forwards Unit 2 SAR Figure 1.2-3,omitted from Amend Package)
  • ML17311A203  + (Forwards Unit 2 SG IR from Last Mid Cycle Outage.Aps Stated That It Would Present,Within Four & One Half Months of Breaker Closure,Final Regulatory Guide 1.121 Evaluation Results of Pulled Tube Analyses & Statistical Treatment)
  • ML17311A204  + (Forwards Unit 2 SG IR from Last Mid Cycle Outage.Aps Stated That It Would Present,Within Four & One Half Months of Breaker Closure,Final Regulatory Guide 1.121 Evaluation Results of Pulled Tube Analyses & Statistical Treatment)
  • ML20238E007  + (Forwards Unit 2 Startup Test Rept Summary,Per Tech Spec Section 6.6.A.1)
  • ML17310B023  + (Forwards Unit 2 Steam Generator Tube Insp Plan Addendum, Based on 940111 Telcon W/Nrc)
  • ML17310B024  + (Forwards Unit 2 Steam Generator Tube Insp Plan Addendum, Based on 940111 Telcon W/Nrc)
  • ML20135B877  + (Forwards Unit 2 readiness-for-restart Worklist,Identifying Currently Known Items to Achieve Readiness for Restart.Plan Encl)
  • B16257, Forwards Unit 2 readiness-for-restart Worklist,Identifying Currently Known Items to Achieve Readiness for Restart.Plan Encl  + (Forwards Unit 2 readiness-for-restart Worklist,Identifying Currently Known Items to Achieve Readiness for Restart.Plan Encl)
  • ML20095J939  + (Forwards Unit 2,Refueling 17 Inservice Insp Final Rept. Rept Summarizes Inservice Activities Performed During 1992 Refueling Outage)
  • ML20034E836  + (Forwards Unit 2,Refueling 18 Inservice Insp Summary Rept for Form NIS-1)
  • ML20210P394  + (Forwards Unit 3 Ccr/Unit 2 Simulator Differences & Corrective Measures,Evaluations for Which Simulator Can Be Used Effectively for Training Unit 3 Operators & Corrected Simulator Differences,Per 861114 Meeting)
  • ML20137U208  + (Forwards Unit 3 Checklists for NRC Review.Complete Project Manual,Including Revised Audit Plan,Revised Project Instructions & All of Checklists Will Be Submitted for Review & Approval on 970418)
  • ML20137U214  + (Forwards Unit 3 Checklists for NRC Review.Complete Project Manual,Including Revised Audit Plan,Revised Project Instructions & All of Checklists Will Be Submitted for Review & Approval on 970418)
  • ML17310B005  + (Forwards Unit 3 SG Insp Rept,Mid-Cycle Outage. Insp Found No Evidence of Axial Cracks in Upper Hot Leg Area.Insp Did Identify Volumetric Indications in Both SGs & Circumferential Cracking at Top of Tubesheet in SG 32)
  • ML17310B007  + (Forwards Unit 3 SG Insp Rept,Mid-Cycle Outage. Insp Found No Evidence of Axial Cracks in Upper Hot Leg Area.Insp Did Identify Volumetric Indications in Both SGs & Circumferential Cracking at Top of Tubesheet in SG 32)
  • ML17305A338  + (Forwards Unit 3 Steam Generator Eddy Current Exam,First Refueling Outage Apr 1989, NDE Summary Rept Discussing Steam Generator Tubes Plugged as Result of Inservice Insp, Per Tech Spec 4.4.4.5.b)
  • ML17305A339  + (Forwards Unit 3 Steam Generator Eddy Current Exam,First Refueling Outage Apr 1989, NDE Summary Rept Discussing Steam Generator Tubes Plugged as Result of Inservice Insp, Per Tech Spec 4.4.4.5.b)
  • ML18153B851  + (Forwards Unit Operational Readiness Program,Per 890720 Meeting.Program Provides Proposed Plan for Sys Walkdowns, Electrical Separation & Logic Testing,Per NRC 890309 Confirmation of Action Ltr Re Restart)
  • ML20148G796  + (Forwards Unit Shutdowns & Power Reductions Form Omitted from Monthly Operating Rept for Feb 1988)
  • NL-88-361, Forwards Unit Shutdowns & Power Reductions Form Omitted from Monthly Operating Rept for Feb 1988  + (Forwards Unit Shutdowns & Power Reductions Form Omitted from Monthly Operating Rept for Feb 1988)
  • ML19296A077  + (Forwards United Airlines Quality Assurance Prog for Transporting Packaging as Applicable to Indus Radiography Lics)
  • ML20023B387  + (Forwards United Engineers & Constructors General Arrangement Drawing 9736-F-805062 Re Fire Protection of Primary Component Cooling Water Pumps,Per Util .W/O Encl)
  • ML20078A538  + (Forwards United Engineers & Constructors,Inc Recalculations of Edge Shear of Spent Fuel Pool Floor Slab & Support,Per O Rothberg of Structural Review Branch Request.Redundancy of Including Fuel Weight in Seismic Loads Removed)
  • ML20127P033  + (Forwards United Engineers & Constructors,Inc 850301 Rev 4 to Rept TP-7, Moderate Energy Line Break Study. Rev Does Not Affect Safety Analysis Conclusions Previously Submitted)