ML20063C353

From kanterella
Jump to navigation Jump to search
Forwards Unit 2 Refueling 19 ISI Summary Rept for Form NIS-1 & Unit 2 Refueling 19 Repair/Replacement Summary Rept for Form NIS-2
ML20063C353
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 01/24/1994
From: Maxfield G
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20063C357 List:
References
NUDOCS 9402040209
Download: ML20063C353 (1)


Text

,

'S S

Wisconsin L Electnc POWER COMPANY j

Point Beoch Nuclear Plant 6610 Nuclear Rd.,Two Riwns WI 54241 (414) 755-2321

?

i l

t January 24, 1994 j

Document Control Desk f

U.

S.

NUCLEAR REGULATORY COMMISSION

.j Mail Statien Pl-137

' j Washington, D.C.

20555 i

Gentlemen:

Docket 50-301 FILING OF OWNER'S INSERVICE INSPECTION

SUMMARY

REPORT POINT BEACH NUCLEAR PLANT, UNIT 2 Attached is the Owner's Inservice Inspection Summary Report which is submitted-f:

in accordance with ASME Section-XI, IWA-6230.

Included in this submittal is the Inservice Inspection Summary Report for Form NIS-1 and the Repair /

Replacement Summary Report for NIS-2.

This information contained in the report reflects the inservice inspection activities during the first outage of the first period of the third lO year interval, of Wisconsin Electric Power Company's Point Beach Nuclear Plant, Unit 2.

Sincerely, s./ / h Greg P ield Plant Manager-caw Attachment bec:

R.

A. Newton

  • J.

B. Brander T. J. Koehler*

S.

A. Patulski*

T. G.

Staskal*

G. M. Krieser*

G. J. Maxfield*

R. R. Ulmer*-

Files ~T7.3 020019 l

I !

l

. - Without Attachments e

{L

/

9402040209 940124 T

PDR ADOCK 05000301 1

G PDR

[ jugsdayofMi.atemaEngC unk M

i

.44.er M

-