ML17311A203

From kanterella
Jump to navigation Jump to search
Forwards Unit 2 SG IR from Last Mid Cycle Outage.Aps Stated That It Would Present,Within Four & One Half Months of Breaker Closure,Final Regulatory Guide 1.121 Evaluation Results of Pulled Tube Analyses & Statistical Treatment
ML17311A203
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 08/11/1994
From: Stewart W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17311A204 List:
References
RTR-REGGD-01.121, RTR-REGGD-1.121 102-03083-WLS-A, 102-3083-WLS-A, NUDOCS 9408230112
Download: ML17311A203 (4)


Text

t L JRJLMH.JL JL'Y (ACCELERATED RIDS PROCESSING I

REGULATORY INFORMATXON DISTRXBUTION SYSTEM (RIDS)

ACCESSXON NBR:9408230112 DOC.DATE: 94/08/11 NOTARIZED: NO DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 P AUTH. NAME AUTHOR AFFILIATION STEWART,W.L. Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME

SUBJECT:

RECIPIENT AFFILIATXON Document Control Branch (Document Control Desk)

Forwards Unit 2 SG XR from last mid cycle outage.APS stated

+ I that it would present, within four 6 one half months of breaker closure, final regulatory guide 1.121 evaluation 0 results of pulled tube analyses 6 statistical treatment.

DISTRIBUTION CODE: AOOID TITLE: OR Submittal: General Distribution COPIES RECEIVED:LTR J ENCL 1 SIZE: 4 104 t

NOTES:STANDARDIZED 05000528 plant.

PLANT'tandardized 05000529 Standardized plant. 05000530 RECIPIENT COPIES RECIPIENT XD CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 LA 1 1 PD4-2 PD 1 1 HOLIAN, B 2 2 TRAN,L 2 2 INTERNAL: ACRS NRR/DORS/ONDD 6

1 6

1 PDR'OPIES NRR/DE/EELB NRR/DRCH/HICB 1

1 1

1 NRR/DRPW 1 1 NRR/DSSA/SPLB 1 1 D R/DSSA/SRXB 1 1 NUDOCS-ABSTRACT 1 1 OC REG FXL 01 1

1 0

1 OGC/HDS2 1 0 0 EXTERNAL: NOAC 1 1 NRC 1 1 C U

N NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE! CONTACTTHE DOCUMENTCONTROL DESK, ROOM P! -37 (EXT. 504-2083 ) TO ELIMINATEYOUR NAME FROM DISTRIBUTIONLISTS I:OR DOCUMENTS You DON T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 22

~,

>Tg C

4/

L J r, ~ pre tb

~ 0" 4

Arizona Public Service Company P.O. BOX 53999 ~ PHOENIX, ARIZONA85012<999 WILLIAML. STEWART EXECUTIVEVICEPRESIDENT 102-03083-WLS/AKK/JRP NUCLEAR August 11, 1994 U. S. Nuclear Regulatory Commission

.'ATTN: Document Control Desk Mail Station P1-37 Washington, D.C. 20555

Reference:

'etter'No. 102-02852, dated March 8, 1994, from W..F. Conway, Executive Vice President, Nuclear, APS, to USNRC.

Dear Sirs:

Subject:

"Palo. Verde Nuclear Generating Station (PVNGS)

Units 1, 2 and 3

.. Docket No.STN 50-528, 50-529, 50-530 Status of PVNGS Steam Generator Activities File: 94-056-026 The referenced letter transmitted the Unit 2 Steam Generator inspection Report from the last mid-cycle outage. In that letter, Arizona Public Service Company (APS) stated that it would present, within four and one half months of breaker closure, a final Regulatory Guide 1;121'valuation, results of the pulled tube analyses, and a statistical treatment of uncertainties.

The enclosed report provides 1) the results of Units 2 and 3 metallurgical tube examinations, 2) results of probabilistic Regulatory Guide 1.121 assessments for Units 1 and 2, and 3) details of the PVNGS integrated outage assessment program.

Should you have any questions, please contact Scott A. Bauer at (602) 393-5978.

WLS/AKK/JRP/dpr

Enclosure:

Status of PVNGS Steam Generator Activities CC: L. J. Callan K. E. Perkins K. E. Johnston B. E. Holian I; Barnes lI408i 1 9'408230112 "05000528 PDR ADQCK PDR P

~ ~