Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Forwards Second Ten Yr Inservice Insp Interval Inservice Testing Program". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20238F561  + (Forwards Second Set of Six Expanded Augmented Sys Review & Test Program Insp Repts & Latest Version of First Six Insp Repts.Insp Repts Concern Emergency Diesels,Main Steam, Integrated Control,Main Feedwater & DHR Sys)
  • ML20202G822  + (Forwards Second Simulator Certification Quadrenniel Rept,For Use of LGS plant-reference Simulator for Licensed Operator Exams,Per 10CFR55.45(b)(5)(ii).Rept Tabulates Testing Performed on Simulator Since Last Submittal)
  • ML20238A152  + (Forwards Second Status Rept Identifying Changes to Initial Test Program Described in Chapter 14 of Fsar.Changes Made in Accordance W/Provisions of 10CFR50.59)
  • ML20040B463  + (Forwards Second Status Rept Re Prompt Notification Sys Reflecting Progress Made Through 820115.Installation Should Be Completed by 820201)
  • ML20081G000  + (Forwards Second Status Rept on Actions Taken to Field Verify That Satisfactory Remedial Actions Being Taken or Have Been Taken to Satisfy Offsite Radiological Emergency Preparedness License Condition Adopted by ASLB on 820302)
  • ML20137V632  + (Forwards Second Submittal Re Crdr Summary Rept Per NRC 850827 Request.Submittal Provides Specific Info Re Proposed Crdr Design Changes)
  • ML20003A689  + (Forwards Second Submittal of Application for Ol,General Info Section,Containing Finanical Info)
  • ML20003A692  + (Forwards Second Submittal of FSAR for Facility.One Thousand Seven Hundred & forty-one Drawings.W/O Encl,Since Document Is Same as FSAR Submitted 800912 & Accepted 810122)
  • ML20037A241  + (Forwards Second Submittal to App D of NEDE-24011-P-A, Generic Reload Fuel Application. Encl Withheld (Ref 10CFR2.790))
  • ML20197E699  + (Forwards Second Summary of Program Technical Support Estimates by Functions for Review & Comments.Personnel Numbers Finalized & Include Regional Operations)
  • ML19254D951  + (Forwards Second Suppl to Justification of Mark II Lead Plant Safety Relief Valve Load Definition Equipment Evaluation)
  • ML19254D952  + (Forwards Second Suppl to Justification of Mark II Lead Plant Safety Relief Valve Load Definition Equipment Evaluation.)
  • ML20042C131  + (Forwards Second Suppl to NRC 740914 Safety Evaluation Which Addresses Fire Protection Items Now Acceptable.Status of Unresolved Items Also Provided)
  • ELV-01314, Forwards Second Suppl to Summary Rept of Startup Test Program  + (Forwards Second Suppl to Summary Rept of Startup Test Program)
  • ML19261D376  + (Forwards Second Supplemental Answer of Tx Utils Generating Co to DOJ First Interrogatories & Requests for Production of Documents,Forwarded Per 790418 Meeting)
  • ML19261D378  + (Forwards Second Supplemental Answer of Tx Utils Generating Co to DOJ First Interrogatories & Requests for Production of Documents,Forwarded Per 790418 Meeting)
  • ML20140D642  + (Forwards Second Supplemental Monthly Rept of Radiation Protection Oversight Committee Covering Activities During Month of Oct 1985.Immediate Actions Initiated to Determine Cause of Administrative Oversight)
  • ML20235C145  + (Forwards Second Supplemental Rept to ACRS Re Util Application to Const Brunswick Steam Electric Plant Units 1 & 2 for Review)
  • ML20137U166  + (Forwards Second Supplemental Response to Intervenor Second Set of Interrogatories.Executed Affidavits of Ws Little Also Encl.Related Correspondence)
  • ML20137U173  + (Forwards Second Supplemental Response to Intervenor Second Set of Interrogatories.Executed Affidavits of Ws Little Also Encl.Related Correspondence)
  • ML20097C614  + (Forwards Second Supplemental Response to TMI Alert First Set of Interrogatories.Related Correspondence)
  • ML20084M408  + (Forwards Second Supplementary Response to App A,Item a Identified During IE Insp 50-353/76-06 on 761016 & 19-22. All Accessible Welds Reinspected)
  • ML20045D067  + (Forwards Second Surveillance Rept of Bonus Plant,Per Article 8 of Contract AT-(40-1)-4186)
  • ML20236M398  + (Forwards Second Task of Maxey Flats Rept,Per of Intent to Tm Taimi That Response Due on 830829)
  • ML17228A243  + (Forwards Second Ten Yr Inservice Insp Interval Inservice Testing Program.)
  • ML20046B858  + (Forwards Second Ten Yr Interval Relief Request SPT-14 Rev,Replacing 930216 submission.SPT-14 Revised to Limit Bolting Removal to Situations Where Boric Acid Wastage Could Be Factor)
  • 3F1198-04, Forwards Second Ten-Year Insp Interval Closeout Summary Rept. Rept Includes Insps & repair-replacements That Occurred 960517-980813  + (Forwards Second Ten-Year Insp Interval Closeout Summary Rept. Rept Includes Insps & repair-replacements That Occurred 960517-980813)
  • ML20236R472  + (Forwards Second Transmittal of Justification Documentation & Design Rationale for Drain at Lakeview,Or Umtra Disposal Cell)
  • NUREG/CR-6369, Forwards Second Transmittal of NUREG/CR-6369, Drywell Debris Transport Study, & Suppls . Pages 2-12,3-8 & C-19 of Incoming Submittal Not Included  + (Forwards Second Transmittal of NUREG/CR-6369, Drywell Debris Transport Study, & Suppls . Pages 2-12,3-8 & C-19 of Incoming Submittal Not Included)
  • ML20215N896  + (Forwards Second Update of Sequoyah Activities List in Accordance w/860717 Submittal of Facility Performance Plan. Update Includes Item Status Changes,New Entries Added Since 860811 & Newly Identified Entries for Restart)
  • ML20137E751  + (Forwards Second Update to 841109 Tabulation of Facility Action Items & Provides Scheduled Actions in Technical Review Team,Licensing,Insps & Legal Areas.Significant Changes Listed)
  • ML20205H522  + (Forwards Second of Three Submittals of Rev 3 to CEN-152, C-E Emergency Procedure Guidelines, Per NUREG-0737,Item I.C.1.SER Requested within 30 Days.Informal Review Process Effective.Third Submittal Will Be Final Version of Rev 3)
  • ML20134A781  + (Forwards Second pre-CP QA Insp Repts 50-528/75-01, 50-529/75-01 & 50-530/75-01.No Significant Deficiencies Noted)
  • NG-97-1148, Forwards Second ten-year ISI Requests for Relief from Exam Requirements Determined to Be Impractical to Perform  + (Forwards Second ten-year ISI Requests for Relief from Exam Requirements Determined to Be Impractical to Perform)
  • ML20034F574  + (Forwards Secondary Chemistry Annual Rept for 1992, Summarizing & Evaluating 1992 Condensate,Feedwater & SG Water Chemistry Operating Experience & Reporting Water Chemistry Parameters Out of Spec)
  • ML20141M061  + (Forwards Secondary Chemistry Annual Rept for 1991. Rept Summarizes & Evaluates 1991 Condensate,Feedwater & Steam Generator Water Chemistry Operating Experience & Repts Total Time Secondary Water Chemistry Parameters Out of Spec)
  • ML20029B222  + (Forwards Secondary Chemistry Annual Rept, for 1990.Rept Summarizes & Evaluates 1990 Condensate,Feedwater & Steam Generator Water Chemistry Operating Experience & Repts Total Time Secondary Water Chemistry Parameters Out of Spec)
  • ML20012B363  + (Forwards Secondary Chemistry Annual Rept, for 1989.Rept Summarizes & Evaluates 1989 Condensate,Feedwater & Steam Generator Water Chemistry Operating Experience & Repts Total Time Secondary Water Chemistry Parameters Out of Spec)
  • ML20117P358  + (Forwards Secondary Containment Capability Test Results Per Tech Specs 4.5.K.2,4.5.K.3 & 4.5.K.4)
  • ML20080J481  + (Forwards Secondary Containment Capability, Summary Technical Rept.Secondary Containment Leak Rate Test Performed on 830901.Results within Tech Spec Limits)
  • ML20126B364  + (Forwards Secondary Containment Leak Rate Test Data)
  • ML19270G930  + (Forwards Secondary Containment Leak Rate Test,90-Day Rept)
  • ML19270G931  + (Forwards Secondary Containment Leak Rate Test,90-Day Rept.)
  • ML19320C981  + (Forwards Secondary Containment Leak Rate Test Data.Test Was Performed 800423 to Verify That Secondary Containment Was Not Violated by Work Performed During Refueling)
  • ML19320C982  + (Forwards Secondary Containment Leak Rate Test Data.Test Was Performed 800423 to Verify That Secondary Containment Was Not Violated by Work Performed During Refueling)
  • ML20209D463  + (Forwards Secondary Containment Leak Rate Test Rept Performed on 870125.Test Verified Containment Integrity Prior to Refueling Outage 7 Fuel Offloading)
  • ML20041D403  + (Forwards Secondary Containment Leak Rate Test Data to Verify That Containment Not Violated by Work Performed During Refueling)
  • ML20082R826  + (Forwards Secondary Containment Leak Rate Test Results.Test Satisfactorily Performed on 830905,proving Containment Capable of Maintaining Less than -.25 Inches Water W/Less than 12,000 Containment Failure Mode of Inleakage)
  • ML18092A839  + (Forwards Secondary Financial Protection Certificates Nelia N-104 & Maelu M-104)
  • ML20028D447  + (Forwards Secondary Financial Protection Certificates N-82 & M-82)