ML20003A692

From kanterella
Jump to navigation Jump to search
Forwards Second Submittal of FSAR for Facility.One Thousand Seven Hundred & forty-one Drawings.W/O Encl,Since Document Is Same as FSAR Submitted 800912 & Accepted 810122
ML20003A692
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 01/28/1981
From: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8102040764
Download: ML20003A692 (1)


Text

m b' CL[Y((kk '

P o eOu 5000 o CLEVEL AND CHIO 44?C1 m T ELEPHONE #21ei 622 9600 e L LUVsN ATING 6tDG e $$ PUBLIC $QUAPE Sc +; Du ? lr N A' n n Datwyn R. Davidson v u suss u s, sesttu tss sus .-a aso co .smuctics January 28, 1981 Mr. liarold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission b*ashington, D. C. 20555

Dear Mr. Denton:

RE: PERRY NUCLEAR P0k'ER PI ANT DOCKET Nos. 50-440, 50-441 The Cleveland Electric Illuminating Company, acting on its own behalf and as agent for Duquesne Light Company, Ohio Edison Company, Pennsylvania Power Company, and the Toledo Edison Company, hereby files three (3) signed originals and fif teen (15) copies of the General Information Section, in addition to forty (40) copies of the Final Safety Analysis Report (FSAR) for the Perry Nuclear Power Plant, Units 1 and 2.

Also, provided as separa.e attachments are the Electrical, Instrumenta-tion and Control Drawings, and Piping and Instrumentation Drawings as listed in Section 1.7 of the FSAR.

The Physical Security Plan (including the Safeguards Contingency Plan) and the proprietary information concerning initial core fuel design and off gas system technology are supplied under separate cover pursuant to 10CFR, Part 50.34(c) and Part 2.790(b)(1).

An acknowledgement of your receipt of the enclosed copies of the FSAR would be appreciated.

Very truly yours

/2 C/T / N/7/ ' 4\

Dalwyn . Davidson Vice President System Engineering and Construction DRD:klm Enclosures cc: G. Charnof f, Esq.

a o 2 o c : ~%4 K-

F Dalwyn R. Davidson, who being duly sworn, deposed and said that (1) he is Vice President, System Engineering and Construction of The Cleveland Electric Illuminating Company, (2) he is duly authorized to execute and file this report on behalf of The Cleveland Electric Illuminating Company, and as duly authorized agent for Duquesne Light Company, Ohio Edison Company, Pennsylvania Power Company, and The Toledo Edison Company, and (3) the statements set forth therein are true and correct to the best of his knowledge, information, and belief.

2 a ']n i. Os 1, /n Da/wynR. Davidson ,

Sworn to and subscribed before me, this o!P 4 dayofho w ,s ,

1981. F #

' k ,& . t- -.d 6'

WILLIA.'.1 J. KT.':t, ?J'rney NOTARY PUBLIC - CIA i. CF 0- 4 3 My commissloa has ns en:.a.c.1 ca.s.

$ccua3147.03 P.C.

(_-

a r'

CLEVELAND ELECTRIC ILLUMINATING COMPANY

^ IIIDAIll Attached herewith are five (5) copies of information proprietary to the General Electric Company Initial Core Fuel Design and Off-Gas System Technology along with an AFFIDAVIT prepared by an official of the General Electric Company describing why this information should be with-held from public disclosure in accordance with 10CFR, Part 2.790(b)(1).

7 t/h f?n li l}$4} >'l DalwynJt. Davidson Vice Pfesident System Engineering & Construction Dalwyn R. Davidson, who being duly sworn, deposed and said that (1) he is Vice President, System Engineering and Construction of The Cleveland Electric Illuminating _ Company,- (2) he is duly authorized to execute and file this report on behalf of 'Ihe Cleveland Electric Illuminating Company, and as duly authorized agent for Duquesne Light Company, Ohio Edison Company, Pennsylvania

- Power Company, and The Toledo Edison Company, and (3) the statements set forth therein are true and correct to the best of his knowledge, information, and belief.

Sworn to and subscribed before me, this M day o -

L , 1981.

u o A / Mu/

o y.y.n.n : ::.,, :

.w

~ '

s g.r:. v. .L'; -

y; .;.. i.f:e !..:.c " ;..;...

.'::n:.

  • a?.D c. ~.

G 1

4 GENERAL ELECTRIC C0MPANY AFFIDAVIT I, Glenn G. Sherwood, being duly sworn, depose and state as follows:

1. I am Manager of Safety and Licensing, General Electric Company, and have been delegated the function of reviewing the information described in paragraph 2 which is sought to be withheld and have been authorized to apply for its withholding.
2. The information sought to be withheld consists of the following figures as filed with the NRC as part of the Perry Nuclear Power Plant Final Safety Analysis Report (Perry FSAR):

A. Initial Core Fuel Design (Figures 4.3-5, 4.3-6, 4.3-12, 4.3-13 and 4.3-16 thru 4.3-19).

B. Offgas System Technology (Tab 1'e 11.3-3, Figures 11.3-1 and 11.3-2.

3. In designating material as proprietary, General Electric utilizes the definition of proprietary information and trade secrets set forth in the American Law Institute's Restatement Of Torts, Section 757. This definition provides:

"A trade secret may consist of any formula, pattern, device or

. compilation of information which is used in one's business and which gives him an opportunity to obtain an advantage over competitors who do not know or use it.... A substantial element of secrecy must exist, so that, except.py the use of improper means, there would be difficulty in acquiring infor-mation.... Some factors to be considered in determining wheti?er given information is one's trade secret are: (1) the extent to which the information is known outside of his business; (2) the axtent to which it is known by employees and others involved in his business; (3) the extent of measures taken by

him to guard the secrecy of the information; (4) the value of the information to him and to his competitors; (5) the amount of effort or money expended by him in developing the information; (6) the ease or difficulty with which the information could be properly acquired or duplicated by others."
4. Some examples of categories of information which fit into the definition of proprietary information are:
a. Information that discloses a process, method or apparatus where prevention of its use by Geaeral Electric's competitors without license from General Electric constitutes a competi-tive economic advantage over other companies; 4

.~w,. + --- - w y , .,-e-e--.r - -- -- -

b. Information consisting of supporting data and analyses, including test data, relative to a process, method or apparatus, the application of which provide a competitive economic advantage, e.g. , by optimization or improved marketability;
c. Information which if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality or licensing of a similar product;
d. Information which reveals cost or price information, produc-tion capacities, budget levels or commercial strategies of General diectric, its customers or suppliers;
e. Information which reveals aspects of past, present or future General Electric customer-funded development plans and programs of potential commercial value to General Electric;
f. Information which discloses patentable subject matter for which it may be desirable to obtain patent protection;
g. Information which General Eledtric must treat as proprietary according to agreements with other parties.
5. In addition to proprietary treatment given to material meeting the standards enumerated above, General Electric customarily maintains in confidence preliminary and draft material.which has not been subject to complete proprietary, technical and editorial review.

This practice is based on the fact that draft documents often do not appropriately reflect all aspects of a problem, may contain tentative conclusions and may contain errors that can be corrected during normal review and approval procedures. Also, until the final document is completed it may not be possible to make any definitive determination as to its proprietary nature. General Electricisnotgenerallywillingtoreleasesuchalocumenttothe general public in such a preliminary form. Such documents are, however, on occasion furnished to the NRC staff on a confidential

. basis because it is General Electric's belief that it is in the public interest for the staff to be promptly furnished with signifi-cant or potentially significant information. Furnishing the docu-ment on a confidential basis pending completion of General Electric's internal review permits early acquaintance of the staff with the I information while protecting General Electric's potential proprie-i tary position and permitting General Electric to insure the public documents are technically accurate and correct.

6. Initial approval of proprietary treatment of a document is made by the Subsection Manager of the originating component, the man most l likely to be acquainted with the value and sensitivity of the information in relation to industry knowledge. Access to such documents within the Company is limited on a "need to know" basis and such documents at all times are clearly identified as proprietary.

- .- . - - , .- - - , *- , a

7. The procedure for approval of external release of such a document is reviewed by the Section Manager, Project Manager, Principal Scientist or other equivalent authority, by the Section Manager of the cognizant Marketing function (or his delegate) and by the Legal Operation for technical content, competitive effect and deter-mination of the accuracy of the proprietary designation in accord-ance with the standards enumerated above. Disclosures outside General Electric are generally limited to regulatory bodies, customers and potential customers and their agents, suppliers and licensees only in accordance with appropriate regulatory provisions or proprie-tary agreements.
8. The document inentioned in paragraph 2 above has been evaluated in accordance with the above criteria and procedures and has been found to contain information which is proprietary and which is customarily held in confidence by General Electric.
9. The information in the Perry-FSAR, considered proprietary to General Electric, consists of Initial Core Fuel Design information related to the use of gadolinia and Offgas System Technology.
10. The information, to the best of my ' knowledge and belief, has consis-tently been held in confidence by the General Electric Company, no public disclosure has been made, and it is not available in public sources. All disclosures to third parties have been made pursuant to regulatory provisions or proprietary agreements which provide for maintenance of the information in confidence.
11. Public disclosure of the information sought to be withheld is likely to cause substantial harm to the competitive position of the General Electric Company and deprive or reduce the availability of profit-making opportunities for the following reasons:

A. Initial Core Fuel Design

1. The cost of developing the proprietary information in the figures mentioned in paragraph 2A above has been estimated to be $600,000.

Extensive modification to lattice computer codes to account for gadolinia, and reactor surveillance of gadolinia bearing fuel, including gamma-scran of exposed fuel, reactivity monitoring, etc. , have required the expediture of $500,000 in labor and computer costs. Although we cannot estimate costs incurred for the other items, they should be included.

2. The development of gadolinia technology has been in progress since 1969. This has required:
a. Extensive experimental programs at Vallecitos to confirm nuclear and material properties.
b. Extensive modification to lattice computer codes to account for gadolinia. '
c. Reactor surveillance of gadolinia bearing fuel.

This includes gamma-scan of exposed fuel, reactivity monitoring, etc.

d. Development of manufacturing techniques and QA procedures.
e. Modifications to Manufacturing Facilities.
3. The competitors likely to gain from disclosure of this information are, directly; Exxon, who competes directly with General Electric for reload fuel contracts and General Electric licensees, who would otherwise purchase this information from General Electric, and, indirectly; Westinghouse, Babcock and Wilcox, and Combustion Engineering.
4. Competitors in the reload fuel market lack the methods capability and experience which GE has developed. Knowing the design information in'the figures would allow them to reduce the uncertainty factors included in these reload fuel bids. This would cause GE to lose its current competitive; advantage.
5. Availability of this information to competitors would enable them to utilize this information without similar expeditures of effort and money.
6. The information sought to be withheld is not available in public sources.

B. Offgas System Technology ,

1. The cost of developing the proprietary information in the Table and Drawing mentioned in paragraph 2B above, as detailed in Table I, exceeds $1,236, 000.
2. We believe the difficult of obtaining information, such as the above represents, is substantial; as our engineering would have to be duplicated in large part.
3. Our competitors are CTI-Nuclear, Ebasco, Suntac, CVI, Stone and Webster, Air Products & Chemicals, Linde, Airco, AEG*, Hitachi*, Toshiba*.
  • Indicates GE licensees who can obtain the information l

from GE, but have to pay for it, and are allowed and l

do bid in competition with GE under the license.

4. Commercial advantage to the competitors include cost ,

j savings if the information were free, and thus with l reduced write-off could underbid GE. Also sales advantage  !

l l

- features instead of on their own system merit alone. l l

l I - ~ _ ,

5. GE competitive position as supplier of about 80% of the BWR plant offgas system would be harmed to the extent described above.
6. The nature of the damage would be loss of cost advantage from engineering development involved and potential serious inroads in future sales of GE offgas systems.
7. The information contained in the offgas system drawing and process data table is not available from commercial sources and has been protected by GE proprietary stamps and handling for some years.

Glenn G. Sherwood, being duly sworn, deposes and says that he has read the foregoing affidavit and the matters stated therein are true and correct to the best of his knowledge, information, and belief.

Executed at San Jose, California, this /,] day of bnh>al ,193/.

O d l

YW Srenn G.' Sherwood M47lb General Electric Company STATE OF CALIFORNIA )

COUNTY 07 SANTA CLARA ) ss:

Subscribed and sworn before me this g day of 198/.

() 0 %.

YAT Ysc/

YGTARYPUBLICIN)lNDFORSAID COUNTY AND STATE l

cocenocecococococococococecet OFFICIAL SEAL h KAREN 5. YOGELHUBER a l

f G NOTARY PUBUC.CAUFORNIN g SANTA CLARA COUNTY My Commission Egires Dec bmmoemooooooooooo. 21 19t'4med ggo/163El-5 -

l e- -- - , - -

i h TABLE I y APPROXIMATE EXPENDITURES FOR THE DEVELOPMENT OF PROPRIETARY OFFGAS SYSTEM INFORMATION IN PERRY-FSAR

1. Cost of Offaas System Technology and Development (1968 to 1973)
a. German Licensing Cost and Consulation $ 6,000
b. Design study (3 man years) 90,000
c. Development Support (10 man years) 400,000 Test Equipment 400,000
d. Design Development, System and Equipment 300,000 (10 man years)
e. Startup Special Test - Verification of '

Design Performance Equipment 25,000 Labor 15,000 Total Approximate Cost $1,236,000

'^s.

ggo/163E6

i L [. , u L k ( ,. t it I(

P O. BOX 5000 e CLEVELAND. OHIO 44101 e TELEPHONE (216) 622-9800 e ILLUMIN ATING BLOG e 55 PUBLIC SOUARE Datwyn R. Davidson viCE PAESIDENT SYSTE M ENGf NE E AING AND CONST AUCYlON June 20, 1980 Mr. d R. Denton Directo .

j Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission

( Washin ton, DC 20555

/

Deera r. Denton:

Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Mqveland Electric Illuminating Company, on behalf of itself and' Duquesne Light q pany, Ohio Edison Company, Pennsylvania Power Company, and The' Toledo Edison Q pany, hereby files an amendment to itt. application tendered March 23, 1 L 1973 foi onstruction Permits and Operating Licenses for the Perry Nuclear i

Power 1dit , Units 1 & 2.

\ / application for the issuance of Operating Licenses consists of

\h+s' pended

  1. general information required by 10 CFR Part 50.33 and the Environmental Report required by 10 CFR Parts 50.30(f) and 51.21. The Final S'afety- Analysis

! Report equired by 10 CFR Part 50.34(b) will be submitted on or about September 1, 1980. \

jY Fursuant' to 10 CFR Part 30.30(c) we are furnishing with this letter:

(1) The General Information Section (three signed originals and ten copies) required by 10 CFR Part 50.33, excluding the financial information required by 10 CFR Part 50.33(f). The financial information will be supplied upon request by the NRC prior to the issuance of an operating license. Copies of the 1979 An~nual Reports of Applicants are included as part of the license application. ,

(2) The Environmental Report - Operating License Stage (twenty copies) required by 10 CFR Parts 50.30(f) and 51.21.

s; .

M would appreciate receiving an acknowledgement of your receipt of this application.

Very truly yours, I<{'

t f

g Dalwy R. Davidson g Vice President - System

. Engineering and Construction Enclosures

i Before the UNITED STATES NUCLEAR REGULATORY COMMISSION Docket Nos. 50-440 & 50-441 In the matter of Tile CLEVELAND ELECTRIC ILLUMINATING COMPANY DUQUESNE LIGilT COMPANY 01110 EDISON COMPANY PENNSYLVANIA POWER COMPANY Tile TOLEDO EDISON COMPANY Application for

^ Operating Licenses for Perry Nuclear Power Plant Units 1 & 2 Consisting of:

(1) General Information Section (2) Environmental Report (under separate cover)

(3) Final Safety Analysis Report (to be submitted under separate cover on or about Septembar t., 1980)

Date: June 26, 1950

\

\n yl)

. gt^