U.S. Route #9 South NUCLEAR Post Office Box 388 Forked River, NJ 087310388 Tel 603-971-4000 September 13,1996 6730-96-2275 1
l U. S. Nuclear Regulatory Commission Attn.: Document Control Desk Washington, DC 20555
Dear Sir:
Subject:
Oyster Creek Nuclear Generating Station Docket No. 50-219 Secondary Containment Capability Test Results The Oyster Creek Nuclear Generating Station Technical Specifications require:
4.5. K.2
"(Secondary Containment) tests shall be performed at least once per operating cycle..."
4.5.K.3 "A secondary containment capability test shall be conducted at each refueling outage prior to refueling."
4.5.K.4 "The results of the secondary containment capability tests shall be in the subject of a summary technical report..."
Attachment I to this letter provides the documentation of the completion of requirements 4.5.K.2 and 4.5.K.3 by docketing the report required in 4.5.K.4. If any additional information or assistance is required, please contact Mr. John Rogers of my staff at 609.971.4893.
Very truly yours, i
h bbb Michael B. Roche 9609230128 960913 PDR ADOCK 05000219 Vice President and Director P
PDR Oyser Creek
/@fI MBR/JJR cc:
Oyster Creek NRC Project Manager Administrat r, Region I
.23Po,1Dn Senior Resident inspector
't
~
Attachment I 1
Summary Technical Report Secondary Containment Capability Test Oyster Creek Nuclear Generating Station Operating Cycle 15; Prior to Refueling Outage 16R l
Date Performed:
August 27,1996 i
- 1. Wind Speed Test Prerequisite:
Observed:
". calm wind... "
7.7 mph j
- 2. Standby Gas Treatment System Flow Rate Test Requirements:
Test Results:
< 4000 cfm 2618 cfm
- 3. Reactor Building Differential Pressure Test Requirements:
Test Results:
Both Railroad Airiock Doors Closed 2 0.25 inches W.G.
0.457 inches W.G.
Outer Railroad Airlock Door Open I
2 0.250 inches W.G.
0.454 inches W.G.
Inner Railroad Airlock Door Open
{
2 0.25 inches W.G.
0.407 inches W.G j