Text
'
M
~
"" Edison --
PILGRIM NUCLEAR POWER STATION RFD #1 ROCKY HILL ROAD PLY M O UTH, MASSACHUSETTS O2360 February 16, 1982 BECo Ltr. #82-53
\\
g MED
\\\\
2 [4R04sgg h Director of Nuclear Reactor Regulation (12) c/o Distribution Services Branch
{
Attn: Document Distribution Center Administration U. S. Nuclear Regulatory Commission Washington, D. C. 20555 9
Co to Docket No. 50-293 License No. DPR-35 SECONDARY CONTAINMENT LEAK RATE TEST REPORT
Dear Sir:
Secondary containment leak rate tests were satisfactorily performed as per PNPS Procedure 8.7.3 on October 2, 8, 9, November 4,1981, and on February 8,1982, to verify that secondary containment was not violated by work performed during refueling.
These tests demonstrated that the Standby Gas Treatment System (SGTS) was capa-ble of maintaining greater than 1/4 inch of water vacuum in the secondary con-tainment, as required by PNPS Technical Specifications 4.7.C.l.c.
These tests were initiated through the use of permanently installed test switches which simultaneously isolated the normal secondary containment ventilation system and initiated the Standby Gas Treatment System.
The data obtained during these tests are attached to this cover letter.
This report is a compilation of the five (5) Secondary Containment Leak Rate Tests performed during the current Refuel V Outage. These tests were repeatedly performed because of maintenance performed on the associated equipment during the outage and the unsatisfactory original test results. The initial failure of this test, performed on October 2, 1982, was reported to the NRC in LER 81-059/03L-0 on November 2, 1981.
This special report is issued to comply with PNPS Technical Specifications 6.9.C.3.
The final test verifying the satisfactory completion of modifications to improve the capability of the SBGTS was performed on February 8, 1982, and is included. This report would normally have been issued within ninety (90) days of the initial successful completion of surveillance test number 8.7.3; however, the initial test's failure, the subsequent LER, the major maintenance performed, the repeated performance of the test, the extended refueling outage and the planned issuance of a supplemental LER resulted in an oversight to request an extension for the submission date for this report.
ol$
g,fI 8203050295 820216 PDR ADOCK 05000293 P
)
BECO Ltr. #62-53 The surveillance test number 8.7.3 utilized to ensure secondary containment and entitled, " Secondary Containment Leak Rate Test" has been reviewed by the Nuclear Engineering Department (NED Doc. No. 82-92) to ensure that the data collected during its performance is representative of the systems capability and that the data is sufficient to prove secondary containment. This surveillance test number 8.7.3 is being revised so that the recorded data, coupled with the specified acceptance criteria, provide assurances that the design criteria has been met.
This revision will be reviewed and approved by NED so that in the future, engineering review of the test results will not be required.
The followup report to LER 81-059 will additionally address the major mainten-ance performed on the secondary containment isolation dampers and other corrective actions taken to restore the secondary containment to is intended design.
Very truly you s,
,. - ~ - - -
R.D. Machon Station Manager Nuclear Operations Department MTM /j s Attachment (s)
Courtesy copy to: Director, Inspection and Enforcement Region I U. S. Nuclear Regulatory Commission BECo Distribution: Messrs.
W. J. Armstrong C. J. Mathis P. D. Smith M. T. McLoughlin P. F. Giardiello R. M. Butler A. V. Morisi L. D. Rucker Licensing PNPS Records Center NRC Resident Inspectors LB l
TABLE I SECONDARY CONTAINMENT LEAK RATE TEST DATA TEST DATE: OCTOBER 2, 1981 TEST CONDITIONS Wind Direction North
- a-Wind Velocity ru 3 MPH Barometric Pressure (outside Rx. Bldg.)
29.76" Hg Outside Temperature 51* F.
Inside Temperature 70" F.
BASE READING (O Flow)
Reactor Bldg. Atmosphere 21 P ("H 0) 2 N.
.00 E.
.00 W. +.01 S. +.06 "A"
SGTS PERFORMANCE System Flow kate -
3500 cfm Reactor Bldg. Atmosphere Zh P ("H O) 2 N.
.25 E.
.24 W.
.26 S.
.27 Secondary Containment Vacuum
.255 H O average corrected 2
"B" SGTS PERFORMANCE System Flow Rate 3900 cfm Reactor Bldg. AtmosphereJSP ("H O) 2 N.
.26 E.
.245 W.
.27 S.
.27 Secondary Containment Vacuum
.260 H O average corrected 2
Page 1 of 1
TABLE I SECONDARY CONTAINMENT LEAK RATE TEST DATA TEST DATE: OCTOBER 8, 1981 TEST CONDITIONS Wind Direction
_sn.
WNW Wind Velocity
/7s 10 FTH Barometric Pressure (outside Rx. Bldg.)
29.5" Hg Outside Temperature 54* F.
Inside Temperature 75* F.
BASE READING (O Flow)
Reactor Bldg. Atmosphere 6 P ("H 0) 2 N. +.015 E.
.04 W. +.07 S. +.01 "A"
SGTS PERFORMANCE System Flow Rate -
4000 cfm Reactor Bldg. Atmosphere AP ("H O) 2 N.
.26 E.
.21 W.
.37 S.
.27 Secondary Containment Vacuum
.28 "H O average corrected 2
"B" SGTS PERFORMANCE System Flow Rate -
4000 cfm Reactor Bldg. Atmosphere AP ("H O) 2 N.
.23 E.
.27 W.
.34 S.
.30 Secondary Containment Vacuum
.29" H O average corrected 2
Page 1 of 1
TABLE I 1
SECONDARY CONTAINMENT LEAK RATE TEST DATA TEST DATE: OCTOBER 9, 1981 i
TEST CONDITIONS l
Wind' Direction
.e-NNW Wind Velocity
- b 20 MPH Barometric Pressure (outside Rx. Bldg.)
29.7" Hg Outside Temperature 48' F.
Inside Temperature 76* F.
BASE READING (O Flow)
Reactor Bldg. AtmosphereJSP ("H O) 2 N.
.08 E. +.10 W.
08 S. +.16 t
- /.
"A" SGTS PERFORMANCE System Flow Rate -
3600 cfm Reactor Bldg. Atmosphered1P ("H 0).
2 N.
.30
,j,
.E.
.23 W.
.24 S.
.24 Secondary Containment Vacuum
.252 H O average corrected 2
"B, SGTS PERFORMANCE System Flow Rate 3900 cfm i
j Reactor Bldg. Atmosphered P ("H O) 2 N.
.30 E.
.26 W.
.20 4
S.
.24~
Secondary Containment Vacuum
.25 H 0 average corrected 2
5 f-Page 1 of l 3,, -- - -,, - -. - -,, - - -,. -
,,m, y--, -,
,v.,-
,1w,- -,,,,
,,,,,,-,.,,---,m
,e-,
,,-e
,,,-,m--n
TABLE I SECONDARY CONTAINMENT LEAK RATE TEST DATA TEST DATE: November 4, 1981 TEST CONDITIONS Wind Direction ESE Wind Velocity 2.97 MPH Barometric Pressure (outside Rx. Bldg.)
29.83" Hg Outside Temperature 51* F.
Inside Temperature 75 F.
Turbine Building Pressure
.13 "H O 2
BASE READING (O Flow)
Reactor Bldg. Atmosphere t1P ("H 0) 2 N. +.08 E. +.03 W. +.08 S. +.06 "A"
SGTS PERFORMANCE System Flow Rate 3950 cfm Reactor Bldg. Atmosphere 2$ P ("H 0) 2 N.
.30 E.
.24 W.
.29 S.
.29 Secondary Containment Vacuum
.28" H O average corrected 2
"B" SGTS PERFOR&\\NCE System Flow Rate 4000 cfm Reactor Bldg. Atmosphere 21P ("H 0) 2 N.
.29 E.
.23 W.
.29 S.
.28 Secondary Containment Vacuum
-273" H O average corrected 2
Page 1 of 1
1 o
SECONDARY CONTAINMENT LEAK RATE TEST DATA
[.
TEST DATE:
FEBRUARY 8, 1982 REVISED SURVEILLANCE TEST NO. 8.7.3 (REV. 10)
A.
Test Performance Wind Direction West i
Wind Velocity 15 mph Barometric Pressure 30.35~
Hg 4
Outside Temperature 45
- F Inside Temperature 72
- F i
_1.
Base Readings i
Manometer AP Rx Bldg El 91'
+.05 N (1)
HO 2
+.03 i
E (2)
.HO 2
+.01 W (3)
HO 2
+.05 S (4)
HO 2
Elevation 51' Turbine Building
-Turb op. floor
.13 HO 2
Condenser Compt.
.14 HO 2
2.
SGTS "A" Performance' Readings are with Inner Reactor Truck Lock Door Open, Outer Door Closed
(
Manometer Stabilization Time Min.
DP-A-22
.75 H 0/
2800 CFM 2
DP-A-32
.1 H 0/.
1050 CFM 2
Total 3850 CFM FI 8126
.> 4000 CFM s
Elevation 91' Rx Bldg. manometer.
i Actual 1-7
.34-HO
.39-H0 N (1)_
2 2
L E (2)
.37
.HO
.40' H0~
2 2
W (3)
.37
'HO
.38
-HO E
2 2
S:(4).
.40 HO
.45 HO 1-2 2
. Averaged corrected manometer DP'
.405 HO~
4 2
Page'l of.3- - - - -
.n..
s
- Elevatlon 51' Turb Bida manometers
- I3 Turb op Floor 1I 0 2
Condenser Compt.
.14 11 0 Net Change from Base Turb 0
11 0 2
Cond 0
1I 0 2
Standby fan reverse rotation Yes No X
(Step 8) 3.
SGTS "B" Performance Readings are with Inner Reactor Truck Door Open, Outer Door Closed Manometer stabilization time Min.
DP-A-22
.09 1I 0 1000 CFM 2
DP-A-32
.87 11 0 3000 CFM 2
Total 4000 CFM FI 8126 >4000 CFM Elevation 91' Rx Bldg Manometers Actual Corrected N (1)
.34 1I 0
.39 11 0 2
2 E (2)
.36 1I 0
.39 1I 0 2
2 W (3)
.38 11 0
.39 1I 0 2
2 S (4)
.34 HO
.39 1I 0 2
2 Average corrected manometer DP
.39 1I 0 2
Elevation 51' Turb Bldg manometers Turb op Floor
.10 11 0 2
Condenser Compt.
.14 1I 0 2
Net Change from Base Turb 0
11 0 2
Cond 0
II 0 2
Standby fan reverse rotation Standby fan reverse rotation Yes No X 4.
SGTS "A" Performance Readings are with Inner Reactor Truck Lock Door Closed, Outer Door Open Manometer stabilization time 3
Min.
DP-A-22
.75 11 0/
2800 CFM 2
DP-A-32
.1 11 0/
1050 CFM 2
Total 3850 CFM FI 8126 3 4000 CFM Page 2 of 3
Elevation 91' Rx Bldg. manometer.
Actual Corrected N (1)
.21 11 0
.26
!! 0 2
2 E (2)
.23 11 0
.26 11 0 2
2 W (3)
.20 11 0
.21 11 0 7
2 S (4)
.28 11 0
.33 11 0 2
2 Average corrected manometer DP v265 11 0 2
Elevation 51' Turb Bldg manometers Turb op Floor
.10 11 0 2
Condenser Compt.
.14 HO 2
Net Change from Base Turb HO 2
Cond 0
11 0 2
Standby fan reverse rotation Yes No X
5.
SGTS "B" Performance Readings are with Inner Reactor Truck Lock Door Closed, Outer Door Open Manometer stabilization time 3
Min.
DP-A-22
.09 11 0 1000 CFM 2
DP-A-32
.87 HO 3000 CFM 2
Total 4000 CFM FI 8126 > 4000 CFM Elevation 91' Rx Bldg Manometers Actual
.6 H
~~
N (1) 2 "2
.24
~~
E (2)
HO HO 2
2 W (3)
.25 11 0
.26 HO 2
2 S (4)
.2 11 0
.25 HO 2
2 Average corrected manometer DP
.2725 11 0 2
Elevation 51' Turb Bldg manometers Turb op Floor
.10 11 0 7
Condenser Compt.
.14 HO 2
Net Change from Base Turb 0
HO 2
I 0
Cond 11 0 Standby fan reverse rotation Yes No X
t Page 3 of 3