Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20149G216 + (Forwards Rev 34 of Security Plan.Rev Identifies Generic Security Changes Being Implemented at Comm Ed Six Nuclear Generating Stations.Changes Allow for Implementation of Util Watchmen Program.Encl Withheld (Ref 10CFR73.21))
- 0CAN099504, Forwards Rev 34 to ANO Units 1 & 2 Industrial Security Plan. Encl Withheld + (Forwards Rev 34 to ANO Units 1 & 2 Industrial Security Plan. Encl Withheld)
- ML20211G495 + (Forwards Rev 34 to Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section))
- RA-97-0248, Forwards Rev 34 to Industrial Security Plan for Unit 2.Rev Made Effective on 971204.Rev Withheld,Per 10CFR73.21 + (Forwards Rev 34 to Industrial Security Plan for Unit 2.Rev Made Effective on 971204.Rev Withheld,Per 10CFR73.21)
- L-98-059, Forwards Rev 34 to Issue 4 of BVPS Physical Security Plant, Utilizing Criteria Described in GL 95-08.List of Changes, Provided.Encl Withheld + (Forwards Rev 34 to Issue 4 of BVPS Physical Security Plant, Utilizing Criteria Described in GL 95-08.List of Changes, Provided.Encl Withheld)
- HNP-99-065, Forwards Rev 34 to PLP-201, Shearon Harris NPP Emergency Plan, Replacing All Pages of Previous Rev with Exception of EAL Flow Path,Side 1 & 2 & Annex H Operations Map & Aperture Card.Changes,Listed.Rev Summary,Encl + (Forwards Rev 34 to PLP-201, Shearon Harris NPP Emergency Plan, Replacing All Pages of Previous Rev with Exception of EAL Flow Path,Side 1 & 2 & Annex H Operations Map & Aperture Card.Changes,Listed.Rev Summary,Encl)
- ML20094L118 + (Forwards Rev 34 to Palisades Security Plan,Per 10CFR73.71(c).Plan Withheld)
- L-92-139, Forwards Rev 34 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21 & 2.790(a)(3)) + (Forwards Rev 34 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21 & 2.790(a)(3)))
- ML20076J324 + (Forwards Rev 34 to Physical Security Plan.Encl Withheld (Ref 10CFR73.21))
- ML20095J907 + (Forwards Rev 34 to Physical Security Plan.Rev Withheld)
- ML20065R936 + (Forwards Rev 34 to Physical Security/Contingency Plan.Rev Withheld (Ref 10CFR73.21))
- ML20212C362 + (Forwards Rev 34 to Seabrook Station Radiological Emergency Plan & Rev 85 to Seabrook Station Emergency Response Manual, Per 10CFR50,App E & 10CFR50.4)
- ML20091K245 + (Forwards Rev 34 to Security Plan,Addressing Issues Raised in NRC .Rev Withheld (Ref 10CFR73.21))
- ML20151C324 + (Forwards Rev 34 to Security Plan,Deleting Redundant Vital Equipment Test Wording & Making Comprehensive Rev of Vital Equipment List.Rev Withheld (Ref 10CFR73.21))
- ML20077M383 + (Forwards Rev 34 to Security Plan,Revising Chapter 1,changing Ceco Definition to Comed & Chapters 6,9 & 14,reclassifying Guard to Member of Security Organization.Encl Withheld (Ref 10CFR73.21))
- ML20095B593 + (Forwards Rev 34 to Security Plan.Plan Change Made,Per 10CFR50.54(p).Rev Withheld (Ref 10CFR73.21))
- ML20058N297 + (Forwards Rev 34 to Security Plan.Rev Details Addl Gate Position for Security Testing & Maint.Rev Withheld (Ref 10CFR73.21))
- ML20100N947 + (Forwards Rev 34 to Security Plan.Rev Initiated to Support Vehicle Barrier Sys Installation Required to Be Fully Implemented by 960229 as Identified in 10CFR73.55(c)(9)(ii). Rev Withheld)
- ML20058E929 + (Forwards Rev 34 to Security Plan.Rev Outlines Temporary Security Measures During Dual Unit Svc Water Outage.Encl Withheld (Ref 10CFR73.21))
- ML20092J696 + (Forwards Rev 34 to Security Plan.Rev Withheld)
- ML20065S740 + (Forwards Rev 34 to Security Plan.Rev Withheld (Ref 10CFR73.21))
- ML18040A178 + (Forwards Rev 34 to Site Emergency Plan, Revised EPIPs & Rev 2 to Emergency Plan Maint Procedure (EPMP) EPMP-EPP-06)
- ML17229A639 + (Forwards Rev 34 to St Lucie Plant Radiological Emergency Plan, IAW 10CFR50.54(q).Attachment to Ltr Provides Summary of Changes Incorporated by Rev)
- ML17354A944 + (Forwards Rev 34 to Turkey Point Radiological Emergency Plan & Rev 2 to Recovery Plan.Change Summary Included)
- ML093441059 + (Forwards Rev 34 to Vol II, Emergency Response Activation, & Revised Epips,Including Rev 11 to IP-1038,Rev 16 to IP-1050,Rev 6 to IP-1054 & Rev 12 to IP-1076)
- GO2-97-009, Forwards Rev 34 to WNP-2 Physical Security Plan.Encl Withheld + (Forwards Rev 34 to WNP-2 Physical Security Plan.Encl Withheld)
- ML20198P612 + (Forwards Rev 35 of CNS Safeguards Plan,Per Provisions of 10CFR50.54(p).Change Incorporates Video Capture Sys, Implementing Actions Utilizing Video Capture Sys & Administrative Title/Organizational Changes.Plan Withheld)
- ML20135A535 + (Forwards Rev 35 of Modified Amended Physical Security Plan. Encl Withheld,Per 10CFR50.54(p)(2))
- ML20083M317 + (Forwards Rev 35 of Plant Security Plan,Addressing Issue Identified in RA Capra Re Rev 33 of Plant Security Plan.Encl Withheld Per 10CFR73.21)
- ML20211Q099 + (Forwards Rev 35 to Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section))
- RC-94-0312, Forwards Rev 35 to EP-100, Radiation Emergency Plan + (Forwards Rev 35 to EP-100, Radiation Emergency Plan)
- ML20249B224 + (Forwards Rev 35 to Grand Gulf Nuclear Station Emergency Plan. Changes Do Not Decrease Effectiveness of Plan & Plan, as Changed Continues to Meet Std of Section 50.47(b) & Requirements of App E)
- RA-98-0020, Forwards Rev 35 to Industrial Security Plan for Rsep,Unit 2. Rev Incorporates Changes Associated W/Physical Mods Involved W/Implementation of Enhanced Defensive Strategy & Incorporates Addl Level of Descriptive Detail.Encl Withheld + (Forwards Rev 35 to Industrial Security Plan for Rsep,Unit 2. Rev Incorporates Changes Associated W/Physical Mods Involved W/Implementation of Enhanced Defensive Strategy & Incorporates Addl Level of Descriptive Detail.Encl Withheld)
- 0CAN019601, Forwards Rev 35 to Industrial Security Plan.Encl Withheld + (Forwards Rev 35 to Industrial Security Plan.Encl Withheld)
- L-98-161, Forwards Rev 35 to Issue 4 of BVPS Physical Security Plan, Utilizing Criteria Described in GL 95-08.List of Changes Provided.Encl Withheld Per 10CFR2.790(d) & 10CFR73.21 + (Forwards Rev 35 to Issue 4 of BVPS Physical Security Plan, Utilizing Criteria Described in GL 95-08.List of Changes Provided.Encl Withheld Per 10CFR2.790(d) & 10CFR73.21)
- ML20079B129 + (Forwards Rev 35 to North Anna Power Station Physical Security Plan,Per 10CFR50.54(p)(2).Plan Withheld)
- ML20102A624 + (Forwards Rev 35 to ONS Physical Security Plan.Rev Withheld)
- HNP-99-116, Forwards Rev 35 to PLP-201, Emergency Plan. Rev Replaces All Pages of Previous Rev with Exception of EAL Flow Path, Side 1 & 2 & Annex H,Operations Map & Aperature Card. Changes Made by Rev,Listed + (Forwards Rev 35 to PLP-201, Emergency Plan. Rev Replaces All Pages of Previous Rev with Exception of EAL Flow Path, Side 1 & 2 & Annex H,Operations Map & Aperature Card. Changes Made by Rev,Listed)
- L-92-234, Forwards Rev 35 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790(a)(3)) + (Forwards Rev 35 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790(a)(3)))
- ML19338A294 + (Forwards Rev 35 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21))
- GO2-97-094, Forwards Rev 35 to Physical Security Plan.Rev Withheld,Per 10CFR73.21 + (Forwards Rev 35 to Physical Security Plan.Rev Withheld,Per 10CFR73.21)
- ML20065P540 + (Forwards Rev 35 to Security Plan,Adding 10CFR26 to App B Section.Rev Withheld (Ref 10CFR73.21))
- ML20067E578 + (Forwards Rev 35 to Security Plan,Incorporating Changes Requested in NRC .Rev Withheld (Ref 10CFR73.21))
- ML20113C263 + (Forwards Rev 35 to Security Plan.Encl Withheld)
- ML20094H553 + (Forwards Rev 35 to Security Plan.Ref Withheld (Ref 10CFR73.21))
- ML20101S306 + (Forwards Rev 35 to Security Plan.Rev Includes Refs to Site Vehicle Barrier Sys Which Has Been Installed to Meet Revised Design Basis Threat Requirements of 10CFR73.Encl Withheld)
- ML20195H234 + (Forwards Rev 35 to Security Plan.Rev Withheld (Ref 10CFR73.21))
- ML20080H339 + (Forwards Rev 35 to Security Plan.Signed Original & Copies of Security Plan Revs Being Provided to Ofc.Encl Withheld)
- ML18040A249 + (Forwards Rev 35 to Site Emergency Plan & Emergency Procedures for Plant)
- L-98-251, Forwards Rev 35 to St Lucie Radiological Emergency Plan, IAW 10CFR50.54(q).Attachment to Ltr Provides Summary of Changes Incorporated by Rev + (Forwards Rev 35 to St Lucie Radiological Emergency Plan, IAW 10CFR50.54(q).Attachment to Ltr Provides Summary of Changes Incorporated by Rev)
- L-99-085, Forwards Rev 35 to Turkey Point EP & Revised EPIP 0-EPIP-20101, Duties of EC, Per Requirements of 10CFR50, App E & 10CFR50.54(q).Summary of Changes,Encl.Implementation Date for Both Documents Was 990330 + (Forwards Rev 35 to Turkey Point EP & Revised EPIP 0-EPIP-20101, Duties of EC, Per Requirements of 10CFR50, App E & 10CFR50.54(q).Summary of Changes,Encl.Implementation Date for Both Documents Was 990330)