MONTHYEARIR 05000295/19930071993-04-13013 April 1993 Insp Repts 50-295/93-07 & 50-304/93-07 on 930329-0402.No Violations Noted.Major Areas Inspected:Previously Identified Edsfi Findings Conducted,Per Temporary Instruction 2515/111 & Electrical Mods (NRC Insp Procedure 37700) Project stage: Request ML20044H4061993-05-17017 May 1993 Forwards Rev 33 to Security Plan.Rev Reflects Deletion of Laundry Facility as Vital Area as Identified in Figure 5-6 & Current Station Organization Structure as Applies to Security Dept.Rev Withheld,Per 10CFR73.21 Project stage: Other ML20045H0511993-06-17017 June 1993 Forwards Rev 30 to Security Plan,Addressing Issues Re Use of Alternate Perimeter Alarm Reporting Sys & Redundant Access Control Sys.Rev Withheld (Ref 10CFR73.21) Project stage: Other ML20058E9291993-11-22022 November 1993 Forwards Rev 34 to Security Plan.Rev Outlines Temporary Security Measures During Dual Unit Svc Water Outage.Encl Withheld (Ref 10CFR73.21) Project stage: Other ML20149K2291996-02-15015 February 1996 Forwards Rev 40 of Zion Nuclear Power Station Security Plan. Encl Withheld Project stage: Other ML20134N1451996-11-14014 November 1996 Forwards 3 Copies of Rev 41 to Zion Nuclear Power Station Security Plan in Response to Re Vehicle Barrier Sys.Plan Withheld Project stage: Other ML20140E9371997-04-17017 April 1997 Forwards Rev 42 to Zion Nuclear Station Security Plan Which Identifies Implementation of New Security Computer Sys.Encl Withheld,Per 10CFR73.21 Project stage: Other ML20211B0911997-09-12012 September 1997 Informs That Organizational Chart in Revised Security Plan Is Inaccurate Due to Realignment of Nuclear Operating Div Organizational Structure on 970903.Will Submit Current Structure by 971103 Project stage: Other ML20217F9441997-10-0202 October 1997 Forwards Rev 43 of Zion Nuclear Power Station Security Plan Which Reflects Changes in Organizational Structure of Utils Nuclear Security Dept.Plan Withheld Project stage: Other 1996-11-14
[Table View] |
Similar Documents at Zion |
|---|
|
Text
A m
-sW 4
.+,
a A
Commonwealth Edi:on C'
125 South Clark Street Cncago. Ilknos i
Address Reply to Post Offee Box 767 Chcago, !!hno:s 60690-0767 CERTIFIED Mall U.S. Nuclear Regulatory Commission ATTN: Document Control Desk i
Washington, D.C. 20555
Subject:
Eion Nuclear Power _Sta.tions Units 1 and 2 Zion S.lation Security Plan NRC Docket Nos. 50-295 & 50-304 TAC Nos. 65423]S5426 Enclosed is the original and three (3) copies of Revision 34 of the Zion Nuclear Power Station Security Plan. This Revision outlines the temporary security measures during the Dual Unit Service Water Outage (Z2P02 and Z1R13).
Pursuant to 10CFR 50.4, the signed original and three copies of the security plan revisions are being provided to your office. A copy of this letter and two copies of the security plan revisions are being sent to Region Ill.
We have concluded that these changes do not decrease the safeguards effectiveness of the plan. These enclosures contain Safeguards information which must be protected from public disclosure pursuant to 10CFR 73.21.
Sincerely, e
hirene M. Johnson Licensing Operations Manager Enclosures cc:
J. B. Martin (w/two encis.)
THE ENCLOSURE CONTAINS SAFEGUARDS INFORMATION Mpon separation, this case is decontrolled Ofli.".l,j 9312070249 931122 i f *J PDR ADOCK 05000295 F