Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Forwards Request for Addl Info Re Mechanical Engineering". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20024D361  + (Forwards Request for Addl Info Re Main Transformer Failures at Facilities Per Nrc/Lll 830714 Site Visit.Info Requested by 830817)
  • ML19344B266  + (Forwards Request for Addl Info Re Manual Override of Engineered Safety Features of Containment Isolation Valves. Requests Response within 30 Days)
  • ML20155F545  + (Forwards Request for Addl Info Re Mark III Containment Suppression Pool Dynamics,Per 750820 Request to Review Subj Rept)
  • ML20155F378  + (Forwards Request for Addl Info Re Mark III Containment Suppression Pool Dynamic Loads.Requests Transmittal of Request to Applicant for Discussion at 750603 Meeting)
  • ML20058B386  + (Forwards Request for Addl Info Re Mark III Containment, Including Details of Analysis Yielding Max of 20% Increase in Pool Velocity.Info Should Be Submitted within 14 Days)
  • ML17054A703  + (Forwards Request for Addl Info Re Mark I Containment long-term Program for Plant Unique Analysis Rept & Loads & Structural Evaluations.Meeting Requested within 4 Wks of Ltr Date)
  • ML20058E531  + (Forwards Request for Addl Info Re Mark I Containment Analysis Based on Review of plant-unique Analysis Rept.Ol Application Should Be Amended to Reflect Response.Info Due by 820806)
  • ML17275A863  + (Forwards Request for Addl Info Re Mark II Containments)
  • ML20128J111  + (Forwards Request for Addl Info Re Mark III Issues (Humphrey Concerns))
  • ML20234D662  + (Forwards Request for Addl Info Re Mark II Containment Dynamic Forcing Functions Info Rept NEDO-21061 as Result of 760429 Meeting W/Mark II Owners Group in Bethesda,Md)
  • ML20024E059  + (Forwards Request for Addl Info Re Mark I Containment long- Term Program plant-unique Analysis Rept on Loads & Structural Evaluations.Meeting at Contractors Ofc to Resolve Issues Suggested)
  • ML18085A521  + (Forwards Request for Addl Info Re Masonry Walls.Confirms Actions Util Must Complete Prior to Issuance of SER)
  • ML20215M617  + (Forwards Request for Addl Info Re Matl Properties for Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events.Justification for Copper & Nickel Contents & Initial RTNDT Values Requested)
  • ML20037B908  + (Forwards Request for Addl Info Re Matls Employed in Reactor Vessel Const & Review of Specimens Employed in Surveillance Program.Info Requested within 60 Days)
  • ML20032D837  + (Forwards Request for Addl Info Re Matls Engineering for FSAR Review.Responses Requested by 811118)
  • ML20041E375  + (Forwards Request for Addl Info Re Matls Engineering.Response Should Be Submitted in 60 Days)
  • ML18031A058  + (Forwards Request for Addl Info Re Matls Engr,Core Performance,Emergency Planning,Radiol Assessment,Geology Geotech Engr & Meteorology of Subj Facility)
  • ML20049H488  + (Forwards Request for Addl Info Re Matls Engineering to Complete Review of CP Application.Info Due in 60 Days)
  • ML19312B822  + (Forwards Request for Addl Info Re Measures to Protect Against Reactor Vessel Overpressurization.Requests Reply within 30 Days)
  • ML19275A445  + (Forwards Request for Addl Info Re Measures to Prevent Steam Generator Water Hammer.Response Will Dictate Whether Plant Mods Are Required.Requests Reply within 60 Days)
  • ML20054J825  + (Forwards Request for Addl Info Re Mechanical Design Documentation to Complete Licensing Review.Info Requested by 820730)
  • ML19350A861  + (Forwards Request for Addl Info Re Mechanical Operability of Containment Purge & Vent Valves.Response Requested within 45 Days of Receipt of Ltr)
  • ML19347C579  + (Forwards Request for Addl Info Re Mechanical Engineering & Instrumentation Control for OL Application Review)
  • ML19274E453  + (Forwards Request for Addl Info Re Mechanical Engineering in Order to Complete Review of FSAR)
  • ML20052B820  + (Forwards Request for Addl Info Re Mechanical,Electrical & Instrumentation & Control Aspect of Overpressure Protection Sys During Low Temp Operation)
  • ML20041E871  + (Forwards Request for Addl Info Re Mechanical Engineering)
  • ML18037A450  + (Forwards Request for Addl Info Re Medium Voltage Cable Bend Radius at Plant)
  • ML17212B642  + (Forwards Request for Addl Info Re Meeting Requirements of 10CFR50 App R.Responses Should Be Submitted by 820618)
  • ML20002C692  + (Forwards Request for Addl Info Re Meteorological Data & Studies Per 10CFR50,App I Requirements.Response Required Only to First Question of 760903 Request)
  • ML20037A649  + (Forwards Request for Addl Info Re Meteorology for Transmittal to Applicant)
  • ML20004C520  + (Forwards Request for Addl Info Re Meteorology for FSAR Review.Response Should Be Submitted by 810619)
  • ML20052A154  + (Forwards Request for Addl Info Re Meteorology)
  • ML20198F805  + (Forwards Request for Addl Info Re Methods Used to Determine Energy Release to Containment Following Blowdown & Some Aspects of Modeling Used in Subcompartment Pressure Analysis.Increase in Capability of Heat Removal Sys Needed)
  • ML20039D786  + (Forwards Request for Addl Info Re Methods & Assumptions Used to Calculate Mass & Energy Releases from Break Following LOCA or Main Steam Line Break Analysis.W/O Encl)
  • ML20039D822  + (Forwards Request for Addl Info Re Methods & Assumptions Used to Calculate Mass & Energy Releases from Postulated Rupture of Main Steam Line.Insp Needed to Continue Review of B-SAR-205.Ltr Forwarding Info Request to B&W Encl)
  • ML19269F130  + (Forwards Request for Addl Info Re Mgt & Technical Resources to Continue Review of Restart Rept)
  • ML20211E694  + (Forwards Request for Addl Info Re Min Critical Power Ratio. Response Should Be Submitted within 30 Days of Ltr Receipt)
  • ML20206K427  + (Forwards Request for Addl Info Re Mitigation of Possible ATWS Events,Per Partial Review of 881015 Response to Generic Ltr 85-06)
  • ML20141N087  + (Forwards Request for Addl Info Re Mod of Vacuum Breakers on Mark I Containments (Generic Ltr 83-08),per Util 830429 Evaluation of wetwell-to-drywell Vacuum Breakers.Response within 45 Days of Ltr Receipt Requested)
  • ML17055B029  + (Forwards Request for Addl Info Re Mod of Vacuum Breakers on Mark I Containment,Needed to Complete Review of Util 830722 Response to Generic Ltr 83-08)
  • ML20134A731  + (Forwards Request for Addl Info Re Mod of Vacuum Breakers on Mark I Containments,Per Generic Ltr 83-08.Response Requested within 45 Days of Ltr Receipt)
  • ML20027D760  + (Forwards Request for Addl Info Re Model Keg Series Packagings,Per 820825 Application)
  • ML20053E453  + (Forwards Request for Addl Info Re Model Br 63-0101 Packaging.Schedule for Submittal of Info Should Be Provided in 30 Days)
  • ML18033A409  + (Forwards Request for Addl Info Re Moderate Energy Line Break Flooding,Per Util ,For Response by 881130)
  • ML13304A366  + (Forwards Request for Addl Info Re Mods to Control Logic to Perform Diesel Generator Slowstarts Per 870409 Issuance of Amends 59 & 48 to Licenses NPF-10 & NPF-15,respectively)
  • ML20041B638  + (Forwards Request for Addl Info Re Mods to Combustible Gas Control Sys.Response Requested within 14 Days)
  • ML20037B428  + (Forwards Request for Addl Info Re Mods to Onsite Emergency Electric Power Sys to Complete Review of ECCS & Fmea.Requests Schedule within 20 Days of Receipt of Ltr)
  • ML19336A680  + (Forwards Request for Addl Info Re Mount St Helens Volcanic Activity Effect on Facility.Response Requested within 45 Days)
  • ML19312B763  + (Forwards Request for Addl Info Re Moving Spent Fuel from Crystal River 3 to Oconee.Requests Response within 30 Days)
  • ML20213F073  + (Forwards Request for Addl Info Re Multi-Plant Action B-81 & Items 4.2.1 & 4.2.2 Re Preventative Maint Program for Reactor Trip Breaker/Maint & Trending Described in Generic Ltr 83-28)
  • ML18092A642  + (Forwards Request for Addl Info Re Multi-Plant Action B-81, Items 4.2.1 & 4.2.2, Preventive Maint Program for Reactor Trip Breakers/Maint & Trending, Per Generic Ltr 83-28. Response Requested within 60 Days)