ML20027D760

From kanterella
Jump to navigation Jump to search
Forwards Request for Addl Info Re Model Keg Series Packagings,Per 820825 Application
ML20027D760
Person / Time
Site: 07109167
Issue date: 10/29/1982
From: Macdonald C
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Bagby L
AMERSHAM CORP.
References
NUDOCS 8211090065
Download: ML20027D760 (3)


Text

,

r--

7 - 7/67

/

l Wax 4

,A

b_ ' F "

OCT 2 91982 i

gS6 -S FCTC: RHO 71-9167 Ancrsham Corporation ATTN: Ms. Linda A. Bagby 2636 South Clearbrook Drive Arlington Heights, IL 60005 Gentlemen:

This refers to your application dated August 25, 1982, requesting approval of the Model t!o. KEG Series packagings.

In connection with our review, we need the infomation identified in the enclosure to this letter.

Please advise us within thirty (30) days from the date of this let.ter when this infomation will be provided. The additional information requested by this letter should be submitted in the fom of revised pages.

If you have any questions regarding this natter, we would be pleased tc ceet with you and your staff.

Sincerely, C # r.!S D d hY P.. !!. 02p2 dei Charles E. MacDonald, Chief Transportation Certification Granch Division of Fuel Cycle and Haterial Safety, HMSS

Enclosure:

As stated Distribution: w/ encl RH0Gegaarden(2)

Docket File NRC PDR IE HQ Region III PNSS R/F FCTC R/F

' B211090065 021029 PDR ADOCK 07109167 C

PDR j, -

g o,nd.,,,,,Fqa:::d. FCTCrg FCTC kQf,C,,,,, f,q,T,9,,,,,,,C 1,(.,,,,,,

9

-*H9aarden.: !

c.EMacha,1,d, EPE,as, ten,q.W,dL,,,k.q,.,,

.D,T,Hoass4,. g ma,5,<r m,,,,

.../. 29 /.82...t.o M.....g

.. /..e [r.f../. gt (o

10

....19..(. v

.... /.A. f. /.82 our> 10/./.82 10 NRC FORM 318 (10 80) NRCM O240 OFFICIAL RECORD COPY

)

r heersham Corporation Model No. KEG Series Packagings Docket No. 71-9167 Encl to 1tr dtd: OCT 2 9 nn3 DRAUINGS 1.

Revise the drawings of the packagings to show the location and construction of the lifting devices, location and dimensions of all welds, thread sizes on caps and support tubes, and complete dimensions and materials of construction of the shielding plugs, support tubes (including maximum clearance between shield plugs and support tubes), and caps.

2.

Provide the qualification and inspection criteria for all welds and provide the specification on the drawings for the WEP shielding inaterial.

3.

Specify the torque required to maintain the cap (s) on the support tube (s).

4.

Revise the package drawing to show the 1ccation and size of the vent holes or other devices provided for the escaping gases generated by the decomposition of the HEP. This should include the outer packaging, support tube and shield plug. During normal conditions of transport, these vent holes should be covered to preclude entry of rain water.

STRUCTURAL 1.

Show by testing or analysis that lifting devices comply with the requirenents of 10 CFR and 71.31(c).

If conpliance is demonstrated by analysis, the maximum shearing stress in the portion of stainless steel imediately above the hand holds should be calculated and shown r.ot to exceed the yield strength of the material.

2.

Show that tie-down devices (both through the handles and/or legs) comply with the requireuents of 10 CFR and 7.31(d). The package should be capabic of withstanding 2G vertical,10G longitudinal, and SG transverse forces simultaneously. Provide a sketch of the uverall tic-down system.

3.

The drawings do not show the load spreader plate that was used on the top of the drun under the closure cap during the puncture tests. Demonstrate that for a puncture directly onto the cap, the contents will not be released from the packaging.

  • """*"'I

^ " >

unc roxu 3i iio..

ONKML RECORD COW

f

/ -

S!!!ELDING Specify the thickness of the shielding plug in the top of the support tubes for each of the _ reported radiation profiles. Describe how these thicknesses have been taken into account when cosapared to the dimensions of the shield plugs shown on the drawings of the support tubes.

OPERATIt!G PROCEDURES Procedures should be revised to take into account the requirements of 10 CFR $20.205 concerning receipt of packages.

l l

i orrica) cu m urp DATEf

< unc rota si no..o. saca on' F FICI AL R ECO R D COP Y

~ - >

O

,~

.