Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Forwards Request for Addl Info Re IPEEE Submittal". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML19260C671  + (Forwards Request for Addl Info Re History of Loss of Offsite Power Events,To Complete Review of Offsite Power Sys Adequacy)
  • ML19260C666  + (Forwards Request for Addl Info Re History of Loss of Offsite Power Events to Complete Review of Offsite Power Sys Adequacy)
  • ML19260C674  + (Forwards Request for Addl Info Re History of Loss of Offsite Power Events to Complete Review of Offsite Power Sys Adequacy)
  • ML19260C678  + (Forwards Request for Addl Info Re History of Loss of Offsite Power Events to Complete Review of Offsite Power Sys Adequacy)
  • ML19260C668  + (Forwards Request for Addl Info Re History of Loss of Offsite Power Events to Complete Review of Offsite Power Sys Adequacy)
  • ML20027D208  + (Forwards Request for Addl Info Re Hot Tee Problem.Response Requested within 60 Days)
  • ML19329D784  + (Forwards Request for Addl Info Re Hurricane Protection Per Review of Matl Shubmitted by Util,Noaa & Cerc.Also Forwards Hydrologic Engineering Summary & Evaluation of Hurricane Verification Studies & Design Basis Hurricane)
  • ML17319A977  + (Forwards Request for Addl Info Re Hydrogen Control & Mitigation Sys. Response Must Be Received by 811001 to Meet Scheduled Installation of Sys by 820131)
  • ML17319B546  + (Forwards Request for Addl Info Re Hydrogen Control Issues for Ice Condenser Plants.Response Requested by 821015)
  • ML17319B477  + (Forwards Request for Addl Info Re Hydrogen Control Issues for Ice Condenser Plants,In Support of Review of Clasix Computer Program in Topical Rept OPS-07A35.Response Requested within 30 Days)
  • ML19320A266  + (Forwards Request for Addl Info Re Hydrogen Generation After Design Basis Loca,Containment Response to Loca,Hydrogen in Primary Coolant, & Hydrogen Production in Reactor Bldg.Info Needed to Complete FSAR Review)
  • ML20127C025  + (Forwards Request for Addl Info Re Hydrogen Control for Mark III Containment Plants During Postulated Degraded Core Accidents.Questions Should Be Transmitted to Grand Gulf, Perry,River Bend & Clinton Applicants)
  • ML20041C223  + (Forwards Request for Addl Info Re Hydrogen Control.Response by 820301 Requested)
  • ML20039B392  + (Forwards Request for Addl Info Re Hydrologic Engineering, Matls Engineering,Reactor Sys & Generic Issues,For Licensing Review.Info to Be Submitted by 820115)
  • ML18018A722  + (Forwards Request for Addl Info Re Hydrologic Engineering & QA List.Response Requested in Time to Support Nov 1983 Target Date for Issuance of SER)
  • ML19207B797  + (Forwards Request for Addl Info Re Hydrology of Site Drainage & Ultimate Heat Sink)
  • ML13310A696  + (Forwards Request for Addl Info Re Hydrological Considerations,Southern CA Edison Co,San Onofre Nuclear Generating Station,Unit 1. Requests Answers to Encl Questions & Updated & Legible Copies of Listed Maps)
  • ML20041A882  + (Forwards Request for Addl Info Re Hydrologic Engineering Environ Info)
  • ML15223A788  + (Forwards Request for Addl Info Re IE Bulletin 80-11,masonry Walls,To Complete Review.Info Needed within 60 Days)
  • ML20215K516  + (Forwards Request for Addl Info Re IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. Response Requested within 1 Month of Ltr Receipt)
  • ML17054B015  + (Forwards Request for Addl Info Re IE Bulletin 80-11 Concerning Masonry Wall Evaluation Program.In Order to Support Review Schedule for multi-plant Activity,Info Requested within 45 Days of Ltr Receipt)
  • ML20050A701  + (Forwards Request for Addl Info Re IE Bulletin 80-11,masonry Wall.Response Required by 820503)
  • ML20040G739  + (Forwards Request for Addl Info Re IE Bulletin 80-04, PWR Main Steam Line Break W/Continued Feedwater Addition. Info Should Be Submitted within 90 Days)
  • ML20237L112  + (Forwards Request for Addl Info Re IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transient Due to Improper Switch Settings. Response Requested within 30 Days Before Valve Program Approved)
  • ML17340A823  + (Forwards Request for Addl Info Re IE Bulletin 80-06 Response.Response Should Be Submitted within 45 Days)
  • ML20211F887  + (Forwards Request for Addl Info Re IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. Info Requested within 1 Month of Ltr Receipt)
  • ML20203H141  + (Forwards Request for Addl Info Re IPEEE Submittal)
  • ML20236K457  + (Forwards Request for Addl Info Re IPEEE Submittal)
  • ML15264A629  + (Forwards Request for Addl Info Re ISFSI)
  • ML18066A638  + (Forwards Request for Addl Info Re ISI Program Relief Request 14 for Palisades Plant)
  • ML20206H927  + (Forwards Request for Addl Info Re Ice Condenser Containment Hydrogen Control Noted in .Response within 45 Days of Receipt of Ltr Requested)
  • ML20008E467  + (Forwards Request for Addl Info Re Identification of safety- Related Structures,Sys & Components Subj to Operational QA Program.Response Required by 810302)
  • ML19353A291  + (Forwards Request for Addl Info Re Identification of High Strength Welds Joining Component Parts & Provision of Impact Energy Data Necessary to Demonstrate Fracture Toughness Adequacy)
  • ML20210N850  + (Forwards Request for Addl Info Re Implementation of ATWS Rule (10CFR50.62) Requirements at Facility.Info Provided in Insufficient to Determine Compliance.Requests Info Be Provided by 870310)
  • ML13305A911  + (Forwards Request for Addl Info Re Implementation of Reactor Coolant Pump Trip Criteria)
  • ML17328A186  + (Forwards Request for Addl Info Re Implementation of NRC Bulletin 88-002, Rapidly Propagating Fatigue Cracks in Steam Generator Tubes, Including Details of Methodology & Criteria for Assessing Avb Insertion Depths)
  • ML18086B531  + (Forwards Request for Addl Info Re Implementation of TMI Action Items,Per 820505 Generic Ltr 82-10)
  • ML17304A396  + (Forwards Request for Addl Info Re Implementation of TMI Action Item II.K.3.5, Automatic Trip of Reactor Coolant Pumps, Because C-E Revised Approved Generic Topical Repts CEN-268 & CEN-268,Suppl 1)
  • ML13303A911  + (Forwards Request for Addl Info Re Implementation of 10CFR50.62.Response Requested within 60 Days of Ltr Date)
  • IR 05000312/1985035  + (Forwards Request for Addl Info Re Improvements Made to Meteorological Measurements Program,Per Region V Insp Rept 50-312/85-35.Technical Evaluation Rept Re Quality of Meteorological Data Collected in 1984 Also Encl)
  • ML20039D649  + (Forwards Request for Addl Info Re Inadvertent Boron Dilution Protection)
  • ML19350B843  + (Forwards Request for Addl Info Re Incoming Lines Containing Check Valves & Manual Valves in Containment Penetration Lines.Info Requested within 30 Days to Complete Review of Util Request for Exemption from 10CFR50,App J)
  • ML19312E311  + (Forwards Request for Addl Info Re Incomplete Fire Protection Items Per Review Required by 791113 Ser.Response Should Include Commitments Necessary to Resolve All Items by 80100l & Be Submitted within 30 Days)
  • ML20011D866  + (Forwards Request for Addl Info Re Increase in Thermal Power to 500 Kw,Per Univ .Questions Cover Ar-41 Concentrations,Radioactivity in City Sewer Sys & HVAC Sys)
  • ML20196J442  + (Forwards Request for Addl Info Re Increase of Allowable Main Steam Isolation Valve (MSIV) Leak Rate & Deletion of MSIV Sealing Sys for Plant)
  • ML20203H101  + (Forwards Request for Addl Info Re Individual Plant Examination of External Events at Millstone Nuclear Power Station,Unit 2.Requests Response within 60 Days of Receipt of Ltr)
  • ML16131A348  + (Forwards Request for Addl Info Re Individual Plant Exam. Responses Requested within 60 Days)
  • ML17312B740  + (Forwards Request for Addl Info Re Individual Plant Exam of External Events Submittal for Palo Verde Nuclear Generating Station)
  • ML20211Q009  + (Forwards Request for Addl Info Re Individual Plant Exam of External Events for Grand Gulf Nuclear Station,Unit 1. Response Requested by 000615)
  • ML18152A244  + (Forwards Request for Addl Info Re Individual Plant Exam Submittal for Generic Issue GI-23 & Draft Reg Guide DG-1008. Response to Request Should Be Submitted within 30 Days of Ltr Receipt)
  • ML17340A282  + (Forwards Request for Addl Info Re Industrial Exposure, Offsite Dose & Accident Evaluation for NRC Review of Steam Generator Repair Program)
  • ML20155H049  + (Forwards Request for Addl Info Re Industry Evaluation of Fatigue Effects for License Renewal)