Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20197A846 + (Forwards Final Confirmatory Measurement Comparison Results of Spiked Liquid Samples Sent on 860508.Results in Agreement for Sr-89,Sr-90 & Fe-55 Analyses & in Disagreement for H-3. Criteria for Comparing Analytic Measurements Also Encl)
- ML20059H661 + (Forwards Final Confirmatory Survey Plan for Shoreham Nuclear Power Station,Brookhaven,Ny,Incorporating Comments Provided During 931101,02 & 04 Telcon)
- ML17300A931 + (Forwards Final Conformance to Generic Lte 83-28,Item 2.2.2 --VendorInterface Programs for All Other Safety-Related Components:Palo Verde 1,2 & 3. Informal Rept.Licensee Conforms to Generic Ltr on Subj Item)
- ML17300A932 + (Forwards Final Conformance to Generic Lte 83-28,Item 2.2.2 --VendorInterface Programs for All Other Safety-Related Components:Palo Verde 1,2 & 3. Informal Rept.Licensee Conforms to Generic Ltr on Subj Item)
- ML20214R613 + (Forwards Final Conformance to Generic Ltr 83-28,Item 2.2.2, Vendor Interface Programs (All Other Safety-Related Components),Byron Station Units 1 & 2, Technical Evaluation Rept.Plant Conforms to Item 2.2.2)
- ML20024C165 + (Forwards Final Consolidated Emergency Planning Contentions)
- ML20024C166 + (Forwards Final Consolidated Emergency Planning Contentions)
- ML19323F811 + (Forwards Final Const Deficiency Rept 5 Re Impeller Shaft Retaining Mechanism Failure in Low Pressure Safety Injection Pumps)
- ML19323F812 + (Forwards Final Const Deficiency Rept 5 Re Impeller Shaft Retaining Mechanism Failure in Low Pressure Safety Injection Pumps)
- ML17208A313 + (Forwards Final Const Deficiency Rept Re Hurricane David Damage)
- ML17208A314 + (Forwards Final Const Deficiency Rept Re Hurricane David Damage)
- ML20045J163 + (Forwards Final Control Bldg Flooding Event Tree,Noting That anti-siphon Capability Part of Design of RSW Sys on Both Supply & Return Lines)
- ML17292A658 + (Forwards Final Copy of Improved Std TS Developed for WNP-2 Which Reflects Compilation of TS Change Requests Submitted to NRC in Ltrs Dtd 951208,960709 & 1212.List of Relocated Requirements & Planned New Activities,Encl)
- GO2-97-006, Forwards Final Copy of Improved Std TS Developed for WNP-2 Which Reflects Compilation of TS Change Requests Submitted to NRC in Ltrs Dtd 951208,960709 & 1212.List of Relocated Requirements & Planned New Activities,Encl + (Forwards Final Copy of Improved Std TS Developed for WNP-2 Which Reflects Compilation of TS Change Requests Submitted to NRC in Ltrs Dtd 951208,960709 & 1212.List of Relocated Requirements & Planned New Activities,Encl)
- ML20035B830 + (Forwards Final Copy of Minutes of 921222 Meeting Re Nuclear Lake Dam,Contract 50-2C31-2-28)
- ML20059F126 + (Forwards Final Copy of NUMARC 93-05,Guidelines for Optimizing Safety Benefits in Assuring Performance of Movs)
- ML20135B224 + (Forwards Final Copy of Rept on Issues Associated W/Use of Potassium Iodide as Radioprotective Agent)
- ML17216A527 + (Forwards Final Core Support Barrel Insp Rept,Post-Cycle 6. Condition of Core Support Barrel Same as Found During post- Cycle 5 Insp.Barrel Acceptable for long-term Svc)
- L-86-181, Forwards Final Core Support Barrel Insp Rept,Post-Cycle 6. Condition of Core Support Barrel Same as Found During post- Cycle 5 Insp.Barrel Acceptable for long-term Svc + (Forwards Final Core Support Barrel Insp Rept,Post-Cycle 6. Condition of Core Support Barrel Same as Found During post- Cycle 5 Insp.Barrel Acceptable for long-term Svc)
- ML17193A049 + (Forwards Final Critique of 800619 SEP Exercise.Critique Discusses Problem Areas Identified During Exercise & Presents Corrective Actions.W/O Critique)
- ML13330B334 + (Forwards Final Cycle X Mod Design Descriptions for Recirculation valve,MOV-358 & Revised Pages to Encl 1 of 871120 Submittal.Revised Pages Clarify Design Descriptions of Integration of Third Pump Into Auxiliary Feedwater Sys)
- ML20214K173 + (Forwards Final DOE Annotated Outline of Rationale for Seismic/Tectonic Investigations for Licensing Nuclear Waste Repository. Outline Revised to Incorporate DOE & NRC Agreed Upon Changes as Result of Dec 1985 Meeting)
- ML20216F633 + (Forwards Final DOE/AL/62350-050510, Mod 2 to Remedial Action Plan & Site Design for Stabilization of Inactive U Mill Tailings Site at Green River,Ut, Dtd Mar 1998)
- ML20059H760 + (Forwards Final DOE/AL/62350-36PF, Long-Term Surveillance Plan for Lowman,Id Disposal Site & DOE/AL/62350-34, Comment & Response Document for Long-term Surveillance Plan for Lowman,Id,Disposal Site. W/1 Oversized Encl)
- ML20196J619 + (Forwards Final Dam Audit Rept of 981008 of Category 1 Cooling Water Storage Pond Dam.Requests Response within 120 Days of Date of Ltr)
- ML17262B244 + (Forwards Final Data Point Library for ERDS)
- LD-92-086, Forwards Final Dctr 10, Sys 80+ Shutdown Risk Evaluation Rept, as Described in Re Submittal Schedule Update.W/Three Oversize Drawings + (Forwards Final Dctr 10, Sys 80+ Shutdown Risk Evaluation Rept, as Described in Re Submittal Schedule Update.W/Three Oversize Drawings)
- ML20127K273 + (Forwards Final Decommissioning Rept for Boelter Reactor Facility Dismantlement & Final Decommissioning Project)
- ML20127K274 + (Forwards Final Decommissioning Rept for Boelter Reactor Facility Dismantlement & Final Decommissioning Project.)
- ML19320B960 + (Forwards Final Decommissioning Rept,Or State Univ AGN-201 Reactor,License R-51. Describes Changes to Physical Security Plan Required in Conjunction W/Decommissioning)
- ML19320B961 + (Forwards Final Decommissioning Rept,Or State Univ AGN-201 Reactor,License R-51. Describes Changes to Physical Security Plan Required in Conjunction W/Decommissioning)
- ML20138N972 + (Forwards Final Decommissioning Survey Plan.Decontamination & Final Survey Activity Provides Basis for Agreement That Room 173 Cleansed of Pu.Request for License Amend Will Be Submitted to Allow Incineration of U Wastes)
- ML20035H732 + (Forwards Final Decontamination & Decommissioning Surveys, Book 6,Septic Tank & Sewage Pump House. All Survey Data Confirms That Areas Meet Release Criteria for Unrestricted Use Established in License)
- ML19257A895 + (Forwards Final Deficeincy Rept Re Inappropriate Seismic Analysis of Upper Head Injection Piping)
- ML19257A896 + (Forwards Final Deficeincy Rept Re Inappropriate Seismic Analysis of Upper Head Injection Piping)
- ML19257A282 + (Forwards Final Deficiency Re Use of Incorrect Weld Acceptance Criteria on Reactor Pressure Vessel Pedestal Welds)
- ML19257A283 + (Forwards Final Deficiency Re Use of Incorrect Weld Acceptance Criteria on Reactor Pressure Vessel Pedestal Welds)
- ML19263B016 + (Forwards Final Deficiency Report Re High Pressure Fire Protection Pump Failures)
- ML19263B018 + (Forwards Final Deficiency Report Re High Pressure Fire Protection Pump Failures)
- ML19305A100 + (Forwards Final Deficiency Report Re Upper Head Injection Sys Rate)
- ML19305A101 + (Forwards Final Deficiency Report Re Upper Head Injection Sys Rate)
- ML19294B860 + (Forwards Final Deficiency Rept)
- ML17193A302 + (Forwards Final Deficiency Rept)
- ML19326B518 + (Forwards Final Deficiency Rept)
- ML19296B617 + (Forwards Final Deficiency Rept (Significant Deficiency 79-04) Re Radiographic Examination of Flued Head penetration-to-sleeve Welds)
- ML19209A025 + (Forwards Final Deficiency Rept 78/04 Re Control Room Panels Mfg by GE)
- ML19209A026 + (Forwards Final Deficiency Rept 78/04 Re Control Room Panels Mfg by GE)
- ML19209C212 + (Forwards Final Deficiency Rept 79-02 Re safety-related Piping Supplied by Power Piping Co)
- ML19209C213 + (Forwards Final Deficiency Rept 79-02 Re safety-related Piping Supplied by Power Piping Co)
- ML19290B689 + (Forwards Final Deficiency Rept 79-08)
- ML19290B690 + (Forwards Final Deficiency Rept 79-08)