Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- B15274, Forwards ERDS Data Point Ref File for Change to ERDS Data Point for Total Reactor Flow,Reflecting Bounding Expected Max Instrument Range & Providing Detailed Description of Calculated Parameter + (Forwards ERDS Data Point Ref File for Change to ERDS Data Point for Total Reactor Flow,Reflecting Bounding Expected Max Instrument Range & Providing Detailed Description of Calculated Parameter)
- ML20199A368 + (Forwards ERDS Implementaion Documents,Including Data Point Library 246 for Hatch,246 for McGuire & 247 for WNP2.Changes Should Be Made as Soon as Possible.W/O Encl)
- ML20147D767 + (Forwards ERDS Implementation Documents)
- ML20138K054 + (Forwards ERDS Implementation Documents & Data Point Library for Listed Plants.W/O Encl)
- ML13316A168 + (Forwards ERDS Implementation Documents & Dpl Updates for Plants to Be Entered Into ERDS Database as Soon as Possible)
- ML20128G907 + (Forwards ERDS Implementation Documents & Data Point Library Updates for Listed Plant.W/O Encl)
- ML13316A144 + (Forwards ERDS Implementation Documents & Pal for Waterford Number 184.Request That Changes Be Entered Into ERDS Database as Soon as Possible.W/O Encl)
- ML20140G634 + (Forwards ERDS Implementation Documents Including Data Point Library Updates for McGuire Number 224,WNP2 Number 225, Beaver Valley Number 226 & Calvert Cliffs Number 227. W/O Encl)
- ML20217P460 + (Forwards ERDS Implementation Documents Including Data Point Library Updates for Robinson (Number 248),Peach Bottom (Number 249),Surry (Number 250),Crystal River (Number 251), McGuire (Numbers 252 & 254) & Salem (Number 253).W/o Encl)
- ML20197G866 + (Forwards ERDS Implementation PWR Data Point Reference File. Util Is Replacing Operator Aid Computer W/Replacement Vendor Saic.Unit 2 Replacement to Occur Current Refueling Outage)
- ML20151A973 + (Forwards ERF Appraisal Insp Rept 50-333/88-07 on 880516-20 & Notice of Deviation & Appraisal Open Items)
- ML20044G198 + (Forwards ES-501-1 Power Plant Licensing Exam Results summary,ES-301-1 & 301-2 Individual Exam Results & Licenses Re 930426-30 Initial Exam)
- ML18106A324 + (Forwards ES-501-2 Power Plant Licensing Exam Results summary,ES-303-1 & 303-2 Individual Exam Results & Licenses & Letters on 980123 & 0126-30.W/o Encl)
- ML20137W705 + (Forwards ES-501-2 Power Plant Licensing Exam Results Summary,Individual Results ES-303-01 & 303-2 Operator License Exam Rept for Each Applicant & Copies of Licenses Issued.W/O Encl.Info Considered Proprietary IAW 10CFR2.790)
- ML20198P980 + (Forwards ES-501-2, Power Plant Licensing Exam Results Summary, Copy of Each Individual License & Ltr of Each Individual Who Failed Exam.W/O Encl)
- ML17180B349 + (Forwards ES-501-2,ES-303-2,ES-401-1 That Provides Individual Exam Results for Applicants Who Took Initial License Exam During Wk of 950731)
- ML20057B028 + (Forwards ES-501-2,power Plant Licensing Exam Results Summary & ES-303-1 & 303-2,operator Licensing Exam Rept for Applicants on Initial Exam Conducted on 930823-25 by NRC at Facility.Encl Withheld,Per 10CFR2.790)
- ML19345G261 + (Forwards ESADA Vallecitos Experimental Superheat Reactor Annual Rept 13,1980)
- ML17297B905 + (Forwards ESF Load Sequencer Software Verification & Validation Rept, as Required by SER Section 8.4.6 (NUREG-0857))
- ML17297B907 + (Forwards ESF Load Sequencer Software Verification & Validation Rept, as Required by SER Section 8.4.6 (NUREG-0857))
- ML13319A793 + (Forwards ESF Single Failure Analysis,San Onofre Nuclear Generating Station,Unit 1, Final Rept,Per . Analysis Performed Per NRC Re Failure of PT-459 on 860730)
- ML19274E355 + (Forwards ESG-79-4,Security Personnel Training & Qualification Plan for Rockwell Intl Energy Sys Group Headquarters Facility. Encl Withheld (Ref 10CFR2.790))
- ML19256F340 + (Forwards ETR-1001, Nuclear QA Program Manual, Revision 8)
- ML19206A699 + (Forwards ETS)
- ML20088A556 + (Forwards ETS Outlining Preoperational Stage of Salt Drift Monitoring Program.Approval Requested)
- ML19210B025 + (Forwards ETS Realistic Accident Section Draft mark-up)
- ML19210B004 + (Forwards ETS Redraft for Review Prior to 770119 Advisory Committee on Standardized ETS Meeting)
- ML20125C526 + (Forwards ETS for Plant.Comments Requested)
- ML19253B967 + (Forwards ETS for Radioactive Waste Treatment & Monitoring Sections)
- ML19262C377 + (Forwards ETS for Radiological Effluents & Offsite Dose Assessment Manual.Nrc 800111 Ltr Re Commitment to NUREG- 0473.Operation of Station within Present Tech Spec Limits Assures Compliance)
- A800004, Forwards ETS for Radiological Effluents & Offsite Dose Assessment Manual.Nrc Re Commitment to NUREG- 0473.Operation of Station within Present Tech Spec Limits Assures Compliance + (Forwards ETS for Radiological Effluents & Offsite Dose Assessment Manual.Nrc Re Commitment to NUREG- 0473.Operation of Station within Present Tech Spec Limits Assures Compliance)
- ML20128C701 + (Forwards ETS for Radwaste Treatment & Monitoring Sections for Plant)
- ML20037A694 + (Forwards ETS for Radwaste Treatment & Monitoring of Facility)
- B10006, Forwards ETS/NR/50-213/80-04 + (Forwards ETS/NR/50-213/80-04)
- ML20206G155 + (Forwards Ea,Fonsi & Notice of Opportunity for Hearing - Release of Portion of Cushing Refinery Site for Unrestricted Use & Amend 9 to License SNM-1999,in Response to 960830 & 1024 Ltrs)
- ML20217C209 + (Forwards Eagle 21 6-month Rept Describing Design Hardware, Design Software & Maint Problems Encountered W/Eagle 21 Reactor Protection Sys During Unit 1,Cycle 5 Operation)
- ML20091K389 + (Forwards Eagle 21 6-month Rept for 910611-1212 Describing Design Hardware,Design Software & Maint Problems Encountered W/Eagle 21 Reactor Protection Sys During Unit 1 Cycle 5 Operation)
- ML20058H647 + (Forwards Eagle 21 Performance Rept for Interval of 930516- 0915,per Commitment Made Via to Provide Periodic Performance Repts Re Zion Unit 1 Eagle 21 Process Protection Sys)
- ML20046C740 + (Forwards Eagle 21 Process Protection Sys Periodic Sys Performance Rept)
- ML20057B416 + (Forwards Eagle 21 Process Protection Sys Periodic Sys Performance Rept for Interval of 930516-0815)
- ML20045H882 + (Forwards Eagle 21 Sys Performance Rept for Interval of 930116-0515,per Commitment Made Via .Addl Performance Repts Will Be Submitted Periodically Throughout First Unit 1 Operating Cycle W/Eagle 21)
- ML20035C584 + (Forwards Eagle 21 Sys Performance Rept,Per Util 920410 Commitment to Provide NRC W/Periodic Performance Repts Re Eagle 21 Process Protection Sys.Addl Repts Will Be Submitted Periodically Through First Operating Cycle W/Eagle 21)
- ML20035A498 + (Forwards Eagle 21 Test Summary Rept,Per Util Commitment in to Provide Summary Rept of post-installation Testing Re Completion of Unit 1 Eagle 21 Process Protection Sys Upgrade & NRC Transmitting SER)
- ML20206J252 + (Forwards Early Draft of Executive Summary from Analysis of Station Blackout Accidents for Bellefonte PWR, Per Request. Initial Draft of Rept Scheduled to Be Completed by 860315)
- ML20210B207 + (Forwards Early Inputs for Next Rev to Sser on Facility Program Plan.Encls Do Not Fully Reflect Evaluation Due to Late Receipt of Rev 3 to Program Plan.More Input Will Be Provided at 860303 Meeting)
- ML20126F459 + (Forwards Early Site Permit Demonstration Program - Plant Parameters Envelope Rept & Early Site Permit Demonstration Program - Siting Guide:Site Selection & Evaluation Criteria for Early Site Permit Application.W/O Encl)
- GO2-81-135, Forwards Earthquake Monitoring of Hanford Region,Eastern Wa, Earthquake Monitoring of Hanford Region,Eastern Wa, & Earthquake Swarms in Columbia River Basalts. Repts Available in Central Files Only + (Forwards Earthquake Monitoring of Hanford Region,Eastern Wa, Earthquake Monitoring of Hanford Region,Eastern Wa, & Earthquake Swarms in Columbia River Basalts. Repts Available in Central Files Only)
- ML20004B129 + (Forwards Earthquake Research for Safer Siting of Critical Facilities. Rept Addresses earthquake-related Problems Confronting Organizations Responsible for Siting Facilities. W/O Encl)
- ML20100D027 + (Forwards Earthquake Resistant Design of Retaining Walls That Forms Basis of Method Used to Establish Dynamic Passive Pressures,Per Draft Ser,Confirmatory Item 4)
- ML20050C283 + (Forwards East Hampton Town Board 820319 Resolution Urging NRC to Require Demonstrably Effective,Tested Evacuation Plan for Five Eastern Long Island Towns)
- ML13333A424 + (Forwards Eastern Us Tectonic Structures & Provinces Significant to Selection of SSE, as Aid for NRC SEP & Geosciences Staff in Establishing Earthquake Design Levels for Eastern Plant Sites)