ML17297B905
| ML17297B905 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 02/15/1983 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Knighton G Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML17297B907 | List: |
| References | |
| RTR-NUREG-0857, RTR-NUREG-857 ANPP-22998-WFQ, NUDOCS 8302230326 | |
| Download: ML17297B905 (8) | |
Text
REGULATOR
'NFORMATION DISTRIBUTION TEM (RIDS)
ACCESSION NBR:8302230326 DOC DATE: 83/02/1,5
/NOTARIZED; YES FACIL;STN-50-528.Palo Verde Nuclear Station~
Uni,t ip Arizona Publi STN"50 529 Palo Verde Nuclear Station~
Unit 2~ Arizona Publi STN-50<<530 Palo Verde Nuclear Stationi Unit '3g Arizona Publi AUTH'AME AUTHUR AFFILIATION VAN BRUNTiE.E.
Arizona Public Service Co.
RECIP+NAME RECIPIENT AFFILIATION KNIGHTONg G ~
Licensing Branch 3
DOCKET 05000528 05000529 05000530
SUBJECT:
Forwards "ESF Load Sequencer
'Sof twar e Veri fi cation 8
Validation Rept'" as requir ed by SER Section 8,4,6
,(NUREG<<0857)e DISTRIBUTION CODE! B00]S COPIES RECEIVED+I;TR.
ENCL Q
SIZE:.-
+@~
TITLE: Licensing "Submittal: iPSAR/FSAR Amdts 8, Related Correspandence NOTES:Standardized plant
-Standardized plant.
Standardized plant ~
05000528 05000529 05000530 RECIPIENT ID CODE/NAME NRR/DL/ADL NRA LB3 LA INTERNAL: ELD/HDS3 IE/DEP EPOS 35 NRR/DE/AEAB NRR/DE/EQB 13 NRR/DE/HGEB 30 NRR/DE/MTEB 17 NRR/DE/SAB 24 NRR/DHFS/HFEB40 NRR/DL/SSPB NRA/DS I/ASB NRR/DS I/CSB 09 NRR/DS I/METB 12 N
AB 22 EG LE 04
/MIB EXTERNALS ACRS 4]
DMB/DSS (AMDTS)
LPDR 03 NSIC 05 COPIFS LTTR ENCL 0
0 1
0 1
1 1
0 2
2 1
1 1
1 1
1
]
1 i0 1
1 1
1 1
1 1
1 1
1 0
6 6
1 1
1 1
1 RECIPIENT
=ID CODE/NAME NRR LB3 BC LICITRAzE 01 IE FILE IE/DEP/EPLB 36 NRR/DE/CEB 11 NRR/DE/GB 28 NRR/DE/MEB 18 NRR/DE/QAB 21 NRR/DE/SEB 25 NRR/DHFS/LQB 32 NRR/DSI/AEB 26 NRR/DSI/CPB 10 NRR/DSI/ICSB 16 NRR/DSI/PSB 19 NRR/DSI/RSB RGN5 BNL(AMDTS ONLY)
FEMA REP DI V 39 NRC PDR 02 NTIS COPIES LTTR ENCL 1
0 1
1
-1 1
1 1
2 2
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 3
3 TOTAL NUMBER OF COPIES REQUIRED LTTR 52 ENCL 45
I g>>
'IWI I,
>>II (!I 14 II W
I l
q Weal f
~ I ',1 I
I I,
t 'll I lj Jj Jf
, -ll o
~
l Jf 'I ljf JI'f g I
'IIJJ, r
JJ ',
I
~ Q(
tf ll >>(
1 I lr
.(
Ii, ll if Jjn 1
'1 /
,rt n
n li w
n W'!
of I'w ll f
4 N
Jj n
"Ql' I'l
'(W 1
II 'g J
(r(
( <<
'4, I
WW I
Wj
~ (J~<<>>
fi j
I>>
Ij I
J 4
yS 1
Arizona Public Service Company P.o. BOX 21666
~
PHOENIX. ARIZONA 65036 February 15, 1983 ANPP-22998 NFO/MAJ Director of Nuclear Reactor Regulation Attention:
Mr. 'George Knighton, Chief Licensing Branch No.
3 Division of Licensing U.
S. Nuclear Regulatory Commission Vashington, D.
C.
20555
Subject:
Palo,Verde Nuclear Generating Station (PVNCS) Units 1, 2 and 3
Docket Nos.
STN-50-528/529/530 File:
83-056-026 G.l.01.10
References:
l.
2.
NUREG-0857, "Safety Evaluation Report related to the operation" of Palo Verde Nuclear Generating Station Units 1, 2 and 3, dated
- November, 1981.
Letter to R. L. Tedesco, NRC, from E. E.
Van Brunt, Jr.,
- APS, dated December 31, 1981.
Dear Mr. Knighton:
Attached is an independent design verification and validation report of the ESF Load Sequencer and Software as required by the Safety Evaluation Report, Reference (1), Section 8.4.6.
Per Reference (2), action item C, APS committed to transmit any change made to the BOP ESFAS sequencer software.
Attached is the documentation describing the design change to annunciate a microprocessor shall alarm on the plant annunciator when the BOP ESFAS is in the Auto-Test Mode.
Reference (2), action item E, requires a review if the detectability of the optical isolator failure to isolate and commit to testing of the isolation capability with a method and frequency based on hardware failure modes.
Attached is the Optical Isolator Voltage Standoff Test Justification and Procedure Outline which APS committed to in response to action item E.
Based on the information submitted concerning the verification and validation report of the ESF Load Sequencer and Software, we feel that this sufficiently resolves the confirmatory issue discussed in section 8.4.6 of the referenced Safety Evaluation Report.'f you have any further questions concerning this matter, please contact me.
Very truly
- ours, 8302230326 8302iS
','. PDR'DQCK 05000528 E
PDR EEVBJr/MAJ/sp Attachment E.
E.
Van Brunt, Jr.
APS Vice President, Nuclear Projects ANPP Project Director
l
cc:
E. Licitra L. Bernabei K. Berlin P. Hourihan A. Gehr
l l
STATE OF ARIZONA
)
) ss.
COUNTY OF MARICOPA)
I, Edwin E. Van Brunt, Jr., represent that I am Vice Presi.dent Nuclear Projects of Arizona Public Service Company, that the foregoing document has been signed by me on behalf of Arizona Public Service Company wi.th full authority so to do, that I have read such document and know its contents, and that to the best of my knowledge and belief, the statements made therein are true.
4 p
8-nX.LL(
0 uJ'dwin E. Van Brunt, Jr.
, 1983.
My Commission expires:
3 g gomrn)sslon ExP1res Maf ~~
>986 lr o4 Sworn to befo're me this f4 day of ~+I ua <
Notary Public
I C
I'