Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 2CAN058113, Forwards Core Protection Calculator Addressable Constant Determination Methodology, in Response to 810505 Request.Comprehensive Document Suitable for Referencing in Tech Spec Bases Will Be Sent by 810817 + (Forwards Core Protection Calculator Addressable Constant Determination Methodology, in Response to 810505 Request.Comprehensive Document Suitable for Referencing in Tech Spec Bases Will Be Sent by 810817)
- BSEP-98-0167, Forwards Core Shroud Insp Plan Unit 2 B214R1 Outage Apr 1999, Per GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in Bwrs + (Forwards Core Shroud Insp Plan Unit 2 B214R1 Outage Apr 1999, Per GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in Bwrs)
- ML20148L760 + (Forwards Core Shroud Insp Plan Unit 2 B213R1 Outage for Sept 1997, Per GL 94-03)
- BSEP-97-0267, Forwards Core Shroud Insp Plan Unit 2 B213R1 Outage for Sept 1997, Per GL 94-03 + (Forwards Core Shroud Insp Plan Unit 2 B213R1 Outage for Sept 1997, Per GL 94-03)
- ML20094D249 + (Forwards Core Shroud Insp Plan for LGS Unit 1,in Response to GL-94-03, IGSCC of Core Shrouds in Bwrs)
- ML20199F609 + (Forwards Core Shroud Insp Plan for LGS Unit 2,in Response to GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in Bwrs)
- ML20080A894 + (Forwards Core Shroud Insp Plan for LaSalle County Nuclear Power Station Unit 2 Sixth Refuel Outage (L2R06),in Response to GL 94-03.Refuel Outage Scheduled to Begin 950217)
- ML20093P173 + (Forwards Core Shroud Insp Plan for LaSalle County Nuclear Power Station Unit 1 Seventh Refuel Outage,As Indicated in 940823 Response to GL 94-03, IGSCC of Core Shrouds in Bwrs)
- ML20085K464 + (Forwards Core Shroud Insp Plan for Pbaps,Unit 3,per Reporting Requirement 2 of GL 94-03, IGSCC of Core Shrouds in Bwrs)
- ML20083B090 + (Forwards Core Shroud Insp Results for LaSalle County Nuclear Power Station Unit 2 Sixth Refuel Outage (L2R06),as Required by GL 94-03.Core Shroud Insp for L2R06 Completed on 950410)
- BSEP-95-0080, Forwards Core Shroud Reinsp Plan Unit 1 B110R1 Outage,Apr 1995, in Response to GL 94-03, IGSCC of Core Shrouds in Bwrs. Reinsp Plan & Plans for Evaluation/Repair of Facility Core Shroud Discussed W/Nrc During Cp&L/Nrc 950117 Meeting + (Forwards Core Shroud Reinsp Plan Unit 1 B110R1 Outage,Apr 1995, in Response to GL 94-03, IGSCC of Core Shrouds in Bwrs. Reinsp Plan & Plans for Evaluation/Repair of Facility Core Shroud Discussed W/Nrc During Cp&L/Nrc 950117 Meeting)
- BSEP-95-0570, Forwards Core Shroud Reinspection Plan Unit 2 B212R1 Outage Feb 1996 + (Forwards Core Shroud Reinspection Plan Unit 2 B212R1 Outage Feb 1996)
- HL-4877, Forwards Core Shroud Stabilizer Design Submittal,Providing Analyses & Conclusions Supporting Implementation of Facility Shroud Repair.Ge Proprietary Info Also Encl.Ge Proprietary Info Withheld Per 10CFR2.790 + (Forwards Core Shroud Stabilizer Design Submittal,Providing Analyses & Conclusions Supporting Implementation of Facility Shroud Repair.Ge Proprietary Info Also Encl.Ge Proprietary Info Withheld Per 10CFR2.790)
- ML20205G289 + (Forwards Core Spray Line Cracking Safety Evaluation Supporting Restart & Continued Operation,Per Requirements of IE Bulletin 80-13, Cracking in Core Spray Spargers)
- ML20134C884 + (Forwards Core Spray Sparger Insp Rept TR-110 for Cycle 16 Refueling Outage Which Describes non-destructive Exams That Had Been Performed on Core Spray Spargers)
- E000-96-011, Forwards Core Spray Sparger Insp Rept TR-110 for Cycle 16 Refueling Outage Which Describes non-destructive Exams That Had Been Performed on Core Spray Spargers + (Forwards Core Spray Sparger Insp Rept TR-110 for Cycle 16 Refueling Outage Which Describes non-destructive Exams That Had Been Performed on Core Spray Spargers)
- ML19324B013 + (Forwards Core Surveillance Rept Containing Specific Power Distribution Limits Applicable for Cycle 7 Operation W/Temp Reduction)
- ML20052G322 + (Forwards Core Surveillance Rept Containing Revised Power Distribution Limits Applicable to Cycle 2 Operation Per 820430 Discussion)
- ML20084J643 + (Forwards Core Surveillance Rept Containing Specific Power Distribution Limits Applicable to Upcoming Cycle 5 Operation.Refueling Outage Scheduled for 840411)
- ML20133M941 + (Forwards Core Surveillance Rept Containing Specific Power Distribution Limits Applicable for Cycle 6 Operation.No Unreviewed Safety Question Will Exist as Result of Cycle 6 Reload Core)
- ML20236C792 + (Forwards Core Surveillance Rept Containing Specific Power Distribution Limits Applicable for Cycle 7 Operation)
- ML20058C161 + (Forwards Core Surveillance Rept for North Anna 2 Cycle 8 Pattern Qf. Analyses Demonstrated That Current Tech Specs Appropriate & Require No Addl Changes)
- ML20198R756 + (Forwards Core Surveillance Repts Associated w/2,893 Mwt Operation for Unit 1,Cycle 6 & Unit 2,Cycle 5,in Support of 850502 Application to Amend Licenses NPF-4 & NPF-7)
- ML18152A347 + (Forwards Core Uprate Licensing Rept Rev to SG Tube Rupture Reanalysis)
- B12206, Forwards Core Xiv Startup Physics Test Rept,Jul 1986. Rept Details Startup Physics Testing Conducted During May & June.Results of Addl Testing Re Three Loop Operation Will Be Submitted on or Before 861001 + (Forwards Core Xiv Startup Physics Test Rept,Jul 1986. Rept Details Startup Physics Testing Conducted During May & June.Results of Addl Testing Re Three Loop Operation Will Be Submitted on or Before 861001)
- ML19263D353 + (Forwards Core Xiv Startup Test Rept)
- ML20032C590 + (Forwards Core Xv Startup Test Rept Per Tech Spec 6.9.1)
- NG-94-2017, Forwards Corn Belt Power Cooperative 1993 Annual Rept, Central Iowa Power Cooperative 1993 Annual Rept & Ies Industries,Inc 1993 Annual Rept + (Forwards Corn Belt Power Cooperative 1993 Annual Rept, Central Iowa Power Cooperative 1993 Annual Rept & Ies Industries,Inc 1993 Annual Rept)
- ML20126D320 + (Forwards Corp Commission of State of Ok 800403 Order Denying Request for Approval to Sell Bonds.Psc of Ok Presently Reviewing Order W/View of Filing Appeal W/Ok Supreme Court)
- ML18139A232 + (Forwards Corporate Emergency Response Plan)
- ML16341B303 + (Forwards Corporate Emergency Response Plan,Prepared by Eds Nuclear,Inc)
- ML17286B047 + (Forwards Corporate Licensing & Assurance Audit 91-551 Dtd 910724.W/o Encl)
- ML20078P917 + (Forwards Corporate Nuclear Safety Rept 94-03-NAPS-A, SWS Operational Performance (Swsop) Assessment... & C/A Schedule for self-assessment of SWS Performance,Per NRC Granting Request for Reduced Swsop Insp)
- ML20148E391 + (Forwards Corporate Operational Readiness Review from 870413-0508 in Response to Request)
- GO2-82-383, Forwards Corporate Organizational Changes Reflecting Planned Evolution as Operation Nears.Changes Will Be Reflected in Next FSAR Amend + (Forwards Corporate Organizational Changes Reflecting Planned Evolution as Operation Nears.Changes Will Be Reflected in Next FSAR Amend)
- GO2-82-682, Forwards Corporate Organizational Changes Effective 820810. Changes Will Be Reflected in Future Revisions to FSAR & Operational QA Program Description + (Forwards Corporate Organizational Changes Effective 820810. Changes Will Be Reflected in Future Revisions to FSAR & Operational QA Program Description)
- ML19296C189 + (Forwards Corporate Organizational Chart Showing Line of Responsibility for Licensing & Compliance)
- ML19331A646 + (Forwards Correct 711028 Encl to AEC)
- NG-83-0723, Forwards Correct Attachment to 830203 Response to NRC Re Violations Noted in IE Insp Rept 50-331/82-11 Re Diesel Oil Transfer Pump + (Forwards Correct Attachment to 830203 Response to NRC Re Violations Noted in IE Insp Rept 50-331/82-11 Re Diesel Oil Transfer Pump)
- ML20052F526 + (Forwards Correct Certificate of Svc for NRC 820503 Reply Brief)
- ML19347E498 + (Forwards Correct Certificate of Svc to NRC 810417 Response to Applicant Request for Waiver,Exception or Exemption & NRC Response to Carolina Environ Study Group Reply to Applicant Motion for License Authorizing Power)
- ML20077A521 + (Forwards Correct Document Request to 830509 Subpoenas.Svc List Encl)
- ML20081K484 + (Forwards Correct Document for Insertion Into 830817 Transcript Following Page 1,016 Covering Evacuation Clear Time Estimates for Areas Near Site)
- ML20244A794 + (Forwards Correct Document to Be App 2 to Tech Spec Change Request 9)
- ML18102A332 + (Forwards Correct Entries of Effluent Gross Value for Flow of NPDES Discharge Monitoring Rept for May 1996)
- ML18102A328 + (Forwards Correct Entries of Effluent Gross Value for Flow of NPDES Discharge Monitoring Rept for May 1996)
- ML20112B233 + (Forwards Correct Exhibit 2 for Case Lipinsky Exhibits Transmitted by ,For Placement in NRC Official Records.W/O Encl.Related Correspondence)
- ML20150E275 + (Forwards Correct Exhibit 8.b.iv Re Applicant 880729 Public Meeting to Parties Joint Stipulation Filed on 880701.W/ Certificate of Svc)
- ML20076C024 + (Forwards Correct Figure A.2-3 Representing Corporate QA Interfaces,Inadvertently Omitted from 830609 QA Program)
- ML20101M745 + (Forwards Correct Mark Up of TS Page 3/4 5-2 Re Application for Amend to App A,Per GL 93-05)
- ML19309A322 + (Forwards Correct Max Setting Voltage V3 Vs Reactor Power Chart to Replace 740823 Erroneous Submittal)