Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Final Task List:Shift Supervisor". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20045E000  + (Final TER Evaluation Rept of Topical Rept BAW-10184P, Entitled GDTACO;Urania-Gadolinia Fuel Pin Thermal Analysis Code, Under FIN I-2009,Task 93-08)
  • ML20128C132  + (Final TER Related to Topical Rept USE-61-002-P, High-Strength Asphalt Solidification Process for Low-Level Radwaste,For Boric Acid Concentrates)
  • ML18101B193  + (Final TER Salem Nuclear Power Station)
  • ML20057B710  + (Final TER for Proposed Remedial Action at Gunnison,Co U Mill Tailings Site)
  • ML20138A256  + (Final TER for Remedial Action Plan & Site Design at Maybell U Mill Tailings Site Maybell,Co)
  • ML20056C576  + (Final TER of Topical Rept CENPD-382-P, C-E Methodology for Core Designs Containing Erbium Burnable Absorber,Part 1: Matls Properties & Behavior, Under FIN I-2009,Task 92-06)
  • ML17354B173  + (Final TER on Submittal-Only Review of IPEEE at Turkey Point Nuclear Plant Units 3 & 4)
  • ML17335A168  + (Final TER on step-2 Review of IPEEE at DC Cook Nuclear Plant,Units 1 & 2, March 1998)
  • ML20188A382  + (Final TI-003 - Evaluating the Impacts of the COVID-19 PHE as Part of Impep)
  • ML20287A506  + (Final TI-003 - Evaluating the Impacts of the COVID-19 PHE as Part of Impep)
  • ML20287A522  + (Final TI-003 Comment Resolution Matrix (20201009))
  • ML12109A428  + (Final TIA 4 18 12)
  • ML12268A330  + (Final TIA Response)
  • ML12194A500  + (Final TIA Response Byron Braidwood Single Spurious Assumption)
  • ML14085A411  + (Final TIA Response Susquehanna SGTS and Secondary Ventilation)
  • ML15082A125  + (Final TIA Response-Laminar Cracks in the Shield Building)
  • ML19122A285  + (Final TMI Unit 2 Independent Spent Fuel Storage Installation and Finding of No Significant Impact)
  • ML091671782  + (Final Table Showing Numbers of Adult Tiger Beetles within Sections of the Shoreline at Calvert Cliffs Sites)
  • ML19256E674  + (Final Task Force Rept on Agreement States Program)
  • ML20057B962  + (Final Task Force Rept on Medical Radiation Protection)
  • ML092540032  + (Final Task Interface Agreement - Re-Evaluation of Implementation of Limiting Condition for Operation 3.0.4a, Mode Change Limitations, at Palisades Nuclear Plant (TIA2009-005))
  • ML15127A569  + (Final Task Interface Agreement-Regulatory Position on Design Life of Safety-Related Structures, Systems, & Components Related to Unresolved Items at D. C. Cook, Monticello, & Palisades (TIA 2014-01))
  • ML20237H975  + (Final Task List:Auxiliary Operator)
  • ML20237H993  + (Final Task List:Control Room Operator)
  • ML20237H985  + (Final Task List:Equipment Attendent/Power Plant Helper)
  • ML20237H971  + (Final Task List:Shift Technical Advisor)
  • ML20247F910  + (Final Task Rept Fumigation Frequency Analysis:Nine Mile Point Mile Point Nuclear Power Station,Lycoming,Ny)
  • ML20247F948  + (Final Task Rept Review of Formulas & Observation of Thermal Internal Boundary Layers in Shoreline Environments)
  • ML20136A051  + (Final Tech Specs - Eos Amd 1)
  • ML20249C453  + (Final Tech Specs Pages for LARs 256/126)
  • ML20234C959  + (Final Technical Assistance Rept for Mar-May 1987 for Fermi Nuclear Station Unit 2)
  • ML20091J095  + (Final Technical Evaluation Rept - Oconee Nuclear Station, Station Blackout Evaluation)
  • ML20084T334  + (Final Technical Evaluation Rept - South Texas Project Electrical Generating Station Station Blackout Evaluation)
  • ML20086R998  + (Final Technical Evaluation Rept - Wolf Creek Generating Station,Station Blackout Evaluation)
  • ML20076M717  + (Final Technical Evaluation Rept Jm Farley Nuclear Plant Units 1 & 2 Station Blackout Evaluation)
  • ML20081K363  + (Final Technical Evaluation Rept Nine Mile Point Nuclear Power Station Unit 1 Station Blackout Evaluation)
  • ML17308A504  + (Final Technical Evaluation Rept St Lucie Unit 1 Station Blackout Evaluation)
  • ML20091K100  + (Final Technical Evaluation Rept Virgil C Summer Station Blackout Evaluation)
  • ML20094D101  + (Final Technical Evaluation Rept for Callaway Plant Station Blackout Evaluation)
  • ML20236F083  + (Final Technical Evaluation Rept for Nrc/Inel Activated Carbon Testing Program)
  • ML20215L103  + (Final Technical Evaluation Rept for Nrc/Inel Activated Carbon Testing Program, Informal Rept)
  • ML20011E400  + (Final Technical Evaluation Rept for Proposed Remedial Action at Shiprock Tailings Site,Shiprock,Nm)
  • ML20012D621  + (Final Technical Evaluation Rept for Proposed Remedial Action at Green River Tailings Site,Green River,Ut)
  • ML19332E379  + (Final Technical Evaluation Rept for Proposed Remedial Action at Spook Tailings Site,Spook,Wy)
  • ML20234D053  + (Final Technical Evaluation Rept for Proposed Remedial Action at Durango Tailings Site,Durango,Co)
  • ML20245C274  + (Final Technical Evaluation Rept for Proposed Remedial Action at Riverton Tailings Site,Riverton,Wy)
  • ML20129F656  + (Final Technical Evaluation Rept for Remedial Action at Slick Rock,Co U Mill Tailings Processing & Disposal Sites)
  • ML20058K072  + (Final Technical Evaluation Rept on Response from Comm Ed to Generic Ltr 88-01 Pertaining to Dresden Nuclear Power Station,Unit 2)
  • ML20042D174  + (Final Technical Evaluation Rept on Response from Niagara Mohawk Power Corp to Generic Ltr 88-01 Pertaining to Nine Mile Point,Unit 1)
  • ML20033E010  + (Final Technical Evaluation Rept on Response from Boston Edison to Generic Ltr 88-01 Pertaining to Pilgrim Nuclear Power Station)