ML20237H966
| ML20237H966 | |
| Person / Time | |
|---|---|
| Site: | Rancho Seco |
| Issue date: | 01/17/1986 |
| From: | GENERAL PHYSICS CORP. |
| To: | |
| Shared Package | |
| ML20237H956 | List: |
| References | |
| NUDOCS 8708250226 | |
| Download: ML20237H966 (9) | |
Text
___ __- _ _ _ _ _
PAGE 'i 0F 9 s
h e
FINAL TASK LIST:
Shift Supervisor
\\
l prepared for Rancho Seco Training 9
by General Physics AD v
-_-m__
PAGE 2 0F 9.
NED - Name Editor / General Physics Corporation RANCHO SECO SHIFT SUPERVISOR
-Survey sheet names / Page 1 / 01-17-1986 331 MAINTENANCE 332 SURVEILLANCE / PERIODIC TESTS 333 SHIFT NORMAL OPERATIONS-334 SHIFT. EMERGENCY OPERATIONS 335 TRAINING 336 PERSONNEL ADMINISTRATION 337 GENERAL ADMINISTRATION
-l 1
~
t f
i t
i I
b 4
e a
l t
i l
PAGE 3 0F.9 1
l j
1 l
SED - Survey Sheet Editor / General Physics Corporation
{
Print Date: 01-17-1986 l
l Survey sheet #331 MAINTENANCE 1
1 331/001/01/03/000 -- Schedule maintenance activities f
331/002/01/03/000 -- Coordinate plant operation to support maintenance l
activities l
l l
331/003/01/03/000 -- Approve requests to remove plant equipments from f
I operation i
331/004/01/03/000 -- Authorize hanging and clearing of tags on plant
]
l equi'pment j
331/005/01/03/000 -- Prepare Maintenance Work Requests j
l 331/006/01/03/000 -- Review Maintenance Work Requests
, 331/007/01/03/000 -- Authorize perf ormance of maintenance on shif t 331/008/01/03/000 -- Approve Radiation Work Permit l
l l
' 331/009/01/03/000 -- Review Radiation Work Permit 331/010/01/03/000 -- Monitor the conduct of maintenance on shift l
331/011/01/03/000 -- Perf orm inspection of system components f ollowing maintenance 331/012/01/03/000 -- Determine retast requirements f o1 Aowing maintenance 331/013/01/03/000 -- Review retest results f ollowing maintenance 331/014/01/03/000 -- (DELETE) Write Out-Of-Specification Test Results Report (Non-Conforming Operations Report, etc.)
331/015/01/03/000 -- Direct minor repairs by the operating shift l
l 331/101/01/03/000 -- (ADD) Interdepartmental relationship
' Number of tasks in this survey: 16 l
l l
I l
~
PAGE 4 0F 97 1
SED.- Survey Sheet Editor / General Physics' Corporation Print Date: 21-17-1986 Survey sheet #332: SURVEILLANCE / PERIODIC TESTS
' 332/014/01/03/000 - Determine priority of surveill ance. assigne'd f or the shift 7:
Authorize performance of surveillance tests on
, i 332/015/01/03/000 --
i I
shift s.332/016/01/03/000 -- Monitor the conduct of. Shif t Surveillance Tests t. ;i 332/017/01/03/000 -- Review results 'of surveillance tests t
Number of tasks in ' this survey 4
l
.9 l'
i I
l l l :
I
)
l l
i 4
\\
t c
~
l t
t f
i
PAGE 5 0F 9 SED - Survey Sheet Editor / General Physics Corporation Print Date: 01-17-1986 Survey sheet #333: SHIFT NORMAL OPERATIONS 333/018/01/03/000 -- Supervise refueling operations as Refueling Supervisor 333/019/01/03/000 -- Conduct shift and relief turnover 333/020/01/03/000 -- Maintain required logs, records and status boards l
333/021/01/03/000 -- Coor.dinate ordering the delivery of plant 1
consumables (gases and chemicals) 333/022/01/03/000 -- Inspect plant each shift 333/023/01/03/000 -- Supervise containment entry and exit 333/024/01/03/000 -- Approve chemical analysis sample request 333/025/01/03/000 -- (DELETE) Approve control / alarm setpoint chang'es I
l 333/026/01/03/000 -- Coordinate load changes with the system dispatcher 333/027/01/03/000 -- Coordinate contractor assistance between station departments 333/028/01/03/000 -- Review operating logs for trends and l
out-of-specification conditions i
333/029/01/03/000 -- Approve jumper wire removal / placement 333/030/01/03/000 -- Approve Radioactive Waste Discharge / Release l
Permi ts 333/031/01/03/000 -- Approve extension of personal dose limits for operations personnel 333/032/01/03/000 -- Report saf ety limit violations and reportable occurrences 333/033/01/03/000 -- Direct shift personnel actions during major plant evolutions 333/034/01/03/000 -- Estimate completion times of shift evolutions 333/035/01/03/000 -. Direct operating shift to carry out actions required by Operations Orders / Memos l
333/036/01/03/000 -- Recall which Saf ety Limits, settings arid operation i
conditions are addressed by Technical Specs 333/037/01/03/000 -- Apply technical specifications for safe;y limits, safety settings and limiting operatione' conditions 333/038/01/03/000 -- Direct operating shif t actions f or of' -normal and alarm conditions 333/039/01/03/000 -- Verify locked valve positions followfng valve operations 333/040/01/03/000 -- Review valve lineup sheets 333/041/01/03/000 -- Review completed checkoff lists f ollowing plant evolutions 333/042/01/03/000 -- Monitor plant chemistry to ensure conformance to specifications 333/044/01/03/000 -- Make verbal reports to immediate ar d other
(
supervisors
PAGE 6 0F'9 SED - Survey Sheet Editor / General Physics Corporation Print Date: 01-17-1986 I
Survey sheet #334: SHIFT EMERGENCY OPERATIONS i
334/043/01/03/000 -- Direct emergency response as Site Emergency Coordinator (Emergency Plan) l 1 334/044/01/03/000 -- Classify emergency events requiring Emergency l
l Plan implementation j
.334/045/01/03/000 --' Direct actions of the Fire Brigade 334/046/01/03/000 -- Analyze indications to determine that an Emergency / Abnormal Event is in progress 334/047/01/03/000 -- Direct shift personnel actions to ensure plant safety during an emergency / abnormal event
{
334/048/01/03/000 -- Direct shift personnel to correct the cause of j
emergency / abnormal events Number of tasks in this survey: 6 i
l i
l J
1 f
}
I
PAGE 7 0F 9 i
SED -' Survey Sheet-Editor / General Physics' Corporation Print Date: 01-17-1986 Survey sheet #335: TRAINING 335/049/01/03/000 -- Coordinate shift training program 335/250/01/03/000 -- Conduct training of juniors Number of tasks in this survey: 2 4
l 1
6
(
i l
I
(
I t
4 I
I i
I I
f l
l r
I e
IL._-__-._-______---__---_-__._____-_________________
l PACE 8 0F-9 SED - Survey Sheet Edicor / General Physics Corporation Print Date: 01-17-1986 j
i l
Survey sheet #336: PERSONNEL ADMINISTRATION l
1 336/053/01/03/000 -- Write periodic Personnel Performance Evaluations q
l 336/054/01/03/000 -- Maintain operations personnel time sheets 336/055/01/03/000 -- Direct shift personnel assignments
{
336/056/01/03/000 -- Authbri=e overtime f or operations personnel
{
336/057/01/03/T*? -- Call in additional personnel as necessary 336/058/01/03/000 -- Handle shift personnel problems NumbGr of tasks in this survey: 6 l
1 1
1
{
i '
I l
I i
l l
1 i
1 1
i l
e PAGE 9 0F 9 SED -' Survey Sheet Editor / General Physics Corporation Print Dates' 01-17-1986 Survey sheet #337: GENERAL ADMINISTRATION P
-337/060/01/03/000 -- Prepare' Personnel Accident _ Reports 337/062/01/03/000 -- Write temporary procedures (procedure changes) 337/063/01/03/200 -- Approve temporary procedures.(procedure changes) 337/064/01/03/000 --- Implement requirements of required reading.
(routing materials)
Number of' tasks in this survey: 4 I
t i
f l
^
b
.