Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Final Intake Screen Modeling Results". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20207A216  + (Final Insp Rept of Field Welds on 820209)
  • ML20207A129  + (Final Insp Rept of Field Welds on 820403)
  • ML20207A197  + (Final Insp Rept of Field Welds on 820609)
  • ML20207A111  + (Final Insp Rept of Field Welds on 820625)
  • ML20207A099  + (Final Insp Rept of Field Welds on 820626)
  • ML20207A092  + (Final Insp Rept of Field Welds on 820722)
  • ML20207A208  + (Final Insp Rept of Field Welds on 820816)
  • ML20207A229  + (Final Insp Rept of Field Welds on 821207)
  • ML20207A178  + (Final Insp Rept of Field Welds on 821215)
  • ML20207A154  + (Final Insp Rept of Field Welds on 821215)
  • ML20207A306  + (Final Insp Rept of Installation of Nis Cable Connectors on 831206)
  • ML20207A320  + (Final Insp Rept of Installation of Nis Cable Connectors on 831210)
  • ML20207A221  + (Final Insp Rept of Nis Cable Insulation & Resistance Testing on 831130)
  • ML20207A240  + (Final Insp Rept of Nis Cable Insulation & Resistance Testing on 831204)
  • ML20207A283  + (Final Insp Rept of Nis Cable Insulation & Resistance Testing on 831205)
  • ML20207A273  + (Final Insp Rept of Nis Cable Insulation & Resistance Testing on 831205)
  • ML20207A290  + (Final Insp Rept of SBM Installation on 831205)
  • ML20207A299  + (Final Insp Rept of SBM Installation on 831205)
  • ML20207A294  + (Final Insp Rept of SBM Installation on 831205)
  • ML20207A309  + (Final Insp Rept of SBM Installation on 831206)
  • ML20207A312  + (Final Insp Rept of SBM Installation on 831208)
  • ML20207A353  + (Final Insp Rept of Soldering of Electrical Connection on 831210)
  • ML20207A193  + (Final Insp Rept of Terminations on 831201)
  • ML20207A203  + (Final Insp Rept of Terminations on 831201)
  • ML20207A173  + (Final Insp of Field Welds on 830209)
  • ML18038A045  + (Final Instrumentation Rept,Geological Studies)
  • ML18130A752  + (Final Integrated Plan Document - Mitigating Strategies NRC Order EA-12-049, Figure 1, FLEX Hose Deployment)
  • RS-18-037, Final Integrated Plan Document - Mitigating Strategies NRC Order EA-12-049, Figures 2 Through 15  + (Final Integrated Plan Document - Mitigating Strategies NRC Order EA-12-049, Figures 2 Through 15)
  • ML16188A271  + (Final Integrated Plan Document- Mitigating Strategies NRC Order EA-12-049)
  • AEP-NRC-2015-23, Final Integrated Plan Regarding March 12, 2012, U.S. NRC Order Regarding Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)  + (Final Integrated Plan Regarding March 12, 2012, U.S. NRC Order Regarding Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049))
  • ML15364A034  + (Final Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049))
  • PLA-7757, Final Integrated Plan to Comply with June 06, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (NRC-Order EA-13-109), Revision 1  + (Final Integrated Plan to Comply with June 06, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (NRC-Order EA-13-109), Revision 1)
  • ML030760057  + (Final Interim Compensatory Measures for Category III Fuel Cycle Facilities)
  • ML19260G383  + (Final Interim Deficiency Rept First Reported 800516,re Design Criteria for Secondary Side Pipe Breaks.Design Did Not Adequately Protect Steam Generator Blowdown Lines. Supports & Barrier Required to Mitigate Any Pipe Rupture)
  • ML19331E244  + (Final Interim Deficiency Rept Re 6-inch Borg-Warner Gate Valves.Valves May Fail Due to Error in Design.Gate Could Disengage from Guide,When Valve in Backseat Position.Valve Failure May Lead to RHR Sys Degradation)
  • ML20009F686  + (Final Interim Deficiency Rept Re Completion of as-built Drawing/Design/Control,Initially Reported on 810122.Util Currently Revising Procedures.Final Rept Expected by 810630)
  • ML20004C641  + (Final Interim Deficiency Rept Re Containment Internal Structure Coating.Delamination Occurred Between Two Coats of Nu-Klad 117.Spec 7220-A-56(Q) Issued for Contractor Use When Applying Decontaminable Coatings to Concrete)
  • ML17296A891  + (Final Interim Deficiency Rept Re Discovery That Stem Extension for Borg-Warner Valves Could Loosen After Cycles. Cause Not stated.C-E Will Coordinate Valve Mod Rework)
  • ML20086J995  + (Final Interim Deficiency Rept Re Failure to Incorporate Increased Support in ERCW Sys.Initially Reported on 831222. Investigation of Scope,Cause & Corrective Action Underway. Next Rept Expected by 840427)
  • ML19253B597  + (Final Interim Deficiency Rept Re Failure to Properly Include Effects of Tornado Wind Loadings on Essential Cooling Water Gantry Crane.Crane Rails Will Be Extended to Park & Locked in Event of Tornado Weather Conditions)
  • ML20055B735  + (Final Interim Deficiency Rept Re GE 10CFR21 Rept on Type Hma Auxiliary Relays Having Excess Uninsulated Flexible Leads Which Could Cause Short Circuits.Bechtel Will Perform Rework Per GE Recommendations)
  • ML19337A670  + (Final Interim Deficiency Rept Re MSIV Leakage Control Sys E32 Being installed.E23 Equipment Cannot Meet Functional Requirements to Relieve Steamline Pressure.Mods Being Implemented & Will Be Completed Prior to Fuel Load)
  • ML20072Q980  + (Final Interim Deficiency Rept Re Miscategorization of Main Feedwater & Containment Isolation Valve.Initially Reported on 810106.Seismic Category of Valves Upgraded from I(L) to I(Active).Matter Not Reportable Per 10CFR50.55(e))
  • ML17296B027  + (Final Interim Deficiency Rept Re Potential Failure of Temp Detection Controllers Used on CTI-Nuclear Air Handling & Filtration Equipment.Mcgraw Edison Issued Recall Notice to Return Controllers for Repair or Replacement)
  • ML19330B747  + (Final Interim Deficiency Rept Re RHR Heat Exchanger Lateral Support provisions.Non-standard Embed Plates Selected for re-insp.Addl Instructions Provided to Appropriate Const Supervisory & QC Insp Personnel.Insp Criteria Stressed)
  • ML19256E514  + (Final Interim Deficiency Rept Re RHR Pump Motor Svc Factor. Flow Restrictions Will Be Added to Each RHR Pump Hot Leg & Cold Leg Injection Header to Provide Pressure Drop Necessary to Prevent Pump Motor Overloading)
  • ML19332A001  + (Final Interim Deficiency Rept Re Spray Header Attachment Lug re-evaluation.Lug Attachments for Containment Spray & RHR Sys Headers Not Properly Evaluated When Supports Reanalyzed for Steel Containment Vessel Dynamic Movements)
  • ML19330B681  + (Final Interim Deficiency Rept Re Welds on Hangers Supporting RHR Spray Piping Containment Dome.One Inspector Terminated & Second Inspector Retrained & Recertified.Addl Defective Welds Repaired.Verification Program Implemented)
  • ML19331E245  + (Final Interim Deficiency Rept Re Wiring Discrepancies on HPCS Components.Discrepancies Involve Wiring Terminations Not Matching Wiring Diagrams,Missing Wires & Nonlabeling of Parts.Components Will Be Reworked)
  • ML20126L724  + (Final Interim Deficiency Rept,Originally Reported on 810227, Re Rebar Omitted from Reactor Shield Wall.Caused by Drawing Discrepancy Between Design Drawings.Holes Drilled in Reactor Shield Wall & Long Splice Bars Installed & Grouted)