Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Failure to Update Combustible Loading Calculation". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • 05000298/FIN-2010007-01  + (Failure to Translate Design and Operating Requirements into Procedures)
  • 05000390/FIN-2008005-01  + (Failure to Translate ERCW Pump Coupling Material Change into Procedures)
  • 05000331/FIN-2018011-01  + (Failure to Translate Environmental Qualification Requirements into Maintenance Procedures/Instructions)
  • 05000341/FIN-2017010-03  + (Failure to Translate Environmental Qualification Requirements into Maintenance Procedures)
  • 05000368/FIN-2012007-02  + (Failure to Translate Extreme Maximum Outside Air Temperatures for Unit 2 Diesel Combustion Air)
  • 05000373/FIN-2018003-05  + (Failure to Translate Fuel Oil Relief Valve Setting into Design Drawing of Record.)
  • 05000285/FIN-2014002-02  + (Failure to Translate HPSI Pump Design Requirements to Design Documents (Section 4OA3.2))
  • 05000397/FIN-2013005-01  + (Failure to Translate Internal Flooding Design into Station Procedures)
  • 05000390/FIN-2011003-04  + (Failure to Translate Moderate Energy Line Break Study Output into a Plant Procedure)
  • 05000373/FIN-2018010-01  + (Failure to Translate Reactor Building Superstructure Design Basis)
  • 05000369/FIN-2017007-01  + (Failure to Translate Required Gasket Replacement Requirements into Limit Switch Maintenance Manual)
  • 05000461/FIN-2014005-03  + (Failure to Translate Seismic Design Requirements into Applicable Procedures)
  • 05000369/FIN-2018012-01  + (Failure to Translate Seismic Mounting Requirements for 125 VDC Vital Batteries into Installation and Replacement Procedure)
  • 05000461/FIN-2015002-04  + (Failure to Translate Sufficient Gland Stress to Packing Gland Nuts Resulted in Valve Packing Failure and Plant Shutdown)
  • 05000341/FIN-2015008-01  + (Failure to Translate TS 3.7.4 Requirements Correctly into Plant Procedures)
  • 05000382/FIN-2011005-04  + (Failure to Translate Tornado Impact on the Ultimate Heat Sink During a Refueling Outage)
  • 05000368/FIN-2012007-03  + (Failure to Translate Unit 2 Emergency Feedwater Pump Runout Flow Condition Into Net Positive Suction Head and Diesel Load Calculation)
  • 05000261/FIN-2010011-06  + (Failure to Translate Vendor Recommendations Into Procedures for 480V Circuit Breakers)
  • 05000255/FIN-2009006-02  + (Failure to Translate the Design Basis for the CV-11 Control Room HVAC Chiller Into Specifications and Drawings)
  • 05000313/FIN-2018003-01  + (Failure to Translate the Design Requirements into Instructions for Refueling Emergency Diesel Generators)
  • 05000482/FIN-2011006-01  + (Failure to Trend Emergency Diesel Generator Chemistry Parameters Results in an Unplanned Technical Specification Entry)
  • 05000289/FIN-2015004-01  + (Failure to Trend Vibration Data for Safety Related River Water Pump)
  • 05000410/FIN-2016002-03  + (Failure to Understand Radiological Conditions Results in Unintended Exposure)
  • 05000416/FIN-2011002-02  + (Failure to Update Available Low Pressure Coolant Injection Loops in the Updated Final Safety Analysis Report)
  • 05000413/FIN-2011002-01  + (Failure to Update Bases For EAL Changes)