05000369/FIN-2018012-01
Jump to navigation
Jump to search
| Site: | McGuire |
|---|---|
| Report | IR 05000369/2018012 Section 4OA2 |
| Date counted | Sep 30, 2018 (2018Q3) |
| Type: | NCV: Green |
| cornerstone | Mitigating Systems |
| Identified by: | NRC identified |
| Inspection Procedure: | IP 71152 |
| Inspectors (proximate) | J Worosilo R Cureton M Riley M Toth F Ehrhardt |
| Violation of: | 10 CFR 50 Appendix B 10 CFR 50 Appendix B Criterion III, Design Control |
| CCA | H.6, Design Margins |
| INPO aspect | WP.2 |
| ' | |