Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "FP-TAP". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • 3F0498-08, FPC Annual ITS Dose Rept for Period 970101-1231  + (FPC Annual ITS Dose Rept for Period 970101-1231)
  • ML20206A919  + (FPC Annual ITS Dose Rept for Period Jan-Dec 1998)
  • 3F0497-06, FPC Annual STS Dose Rept for Period 960101-1231  + (FPC Annual STS Dose Rept for Period 960101-1231)
  • ML20149L947  + (FPC Comments on DSI-24, Power Reactor Decommissioning)
  • ML20117C643  + (FPC Crngp Unit 3 Graded Approach Methodology for Instrument Uncertainty)
  • ML20108C565  + (FPC Crystal River Unit 3 Cycle 11 Colr,Referencing Revised Sts)
  • ML20086E644  + (FPC Crystal River Unit 3 Fire Endurance Test Program Plan for Mecatiss Over Thermo-Lag (Overlay Upgrade) & Mecatiss (Stand Alone))
  • ML20212E903  + (FPC Crystal River Unit 3 Plant Reference Simulator Four Year Simulator Certification Rept Sept 1995-Sept 1999)
  • 3F0597-01, FPC Crystal River,Unit 3 Annual Radiological Environ Operating Rept,1996  + (FPC Crystal River,Unit 3 Annual Radiological Environ Operating Rept,1996)
  • ML20217B173  + (FPC Crystal River,Unit 3,Tendon Surveillance Program Engineering Evaluation of Sixth Tendon Surveillance)
  • ML11314A122  + (FPC118-PR-001, Revision 2, Design Criteria Document Regarding Auxiliary Building Evaluation for Crane Upgrade)
  • ML071210337  + (FPIP-0104, Revision 0 Safe Shutdown Equipment List and Fault Tree Logics)
  • ML071210341  + (FPIP-0105, Revision 0 Safe Shutdown Circuit Analysis)
  • ML071630505  + (FPIP-0106, Clarification Phone Call Regarding Pilot Plant (Shearon Harris) Transition to NFPA 805. FPIP-0106 Validate Fire Area Shutdown Strategies, Rev.1)
  • ML071210344  + (FPIP-0122, Revision 0 Expert Panel Review of Multiple Spurious Actuations)
  • ML071630512  + (FPIP-0126, Rev 0, Non-Power Operational Modes Transition Review. 05/21/2007 Clarification Phone Call Regarding Pilot Plant (Shearon Harris) Transition to NFPA 805)
  • ML071210335  + (FPIP-0127, Revision 0 NFPA 805 Nuclear Safety Capability Assessment Transition Review)
  • ML071210353  + (FPIP-0202, Revision 0 Fire PRA Component Selection)
  • ML042670164  + (FPL - Security Plan Provisions for Enhanced Owner Controlled Area Surveillance and Response)
  • ML021500303  + (FPL 05/02/2002 Meeting Handout Materials Re Steam Generator Operational Assessment)
  • ML090140089  + (FPL 2.206 Petition Dated 01/01/09)
  • ML23124A341  + (FPL 2022 Public Meeting Slides)
  • ML19087A307  + (FPL Answer Opposing Intervenors Joint Motion for Partial Reconsideration of Initial Scheduling Order)
  • ML18173A169  + (FPL Answer Opposing Sace Extension Request)
  • ML15349A036  + (FPL Answer Supporting the NRC Staffs Motion in Limine)